{
"type": "https://docs.iotools.cloud/errors/insufficient_credits",
"title": "Insufficient credits",
"status": 402,
"code": "insufficient_credits",
"detail": "This call costs 1 credit and 0 remain in this month's allowance.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11",
"credits_used": 0,
"credits_remaining": 0
}
{
"type": "https://docs.iotools.cloud/errors/tool_not_allowed",
"title": "Tool not available over the API",
"status": 403,
"code": "tool_not_allowed",
"detail": "\"Background Remover\" is available on iotools.cloud but has no API endpoint.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"
}
{
"type": "https://docs.iotools.cloud/errors/tool_not_found",
"title": "Tool not found",
"status": 404,
"code": "tool_not_found",
"detail": "No tool with that slug. See GET /v1/tools/list.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"
}
{
"type": "https://docs.iotools.cloud/errors/payload_too_large",
"title": "Payload too large",
"status": 413,
"code": "payload_too_large",
"detail": "Request body exceeds this tool's size limit.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"
}
{
"type": "https://docs.iotools.cloud/errors/unprocessable_input",
"title": "Input cannot be processed",
"status": 422,
"code": "unprocessable_input",
"detail": "This video has no captions or subtitles, so there is no transcript to extract.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11",
"credits_used": 0
}
Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM).
{
"type": "https://docs.iotools.cloud/errors/insufficient_credits",
"title": "Insufficient credits",
"status": 402,
"code": "insufficient_credits",
"detail": "This call costs 1 credit and 0 remain in this month's allowance.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11",
"credits_used": 0,
"credits_remaining": 0
}
{
"type": "https://docs.iotools.cloud/errors/tool_not_allowed",
"title": "Tool not available over the API",
"status": 403,
"code": "tool_not_allowed",
"detail": "\"Background Remover\" is available on iotools.cloud but has no API endpoint.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"
}
{
"type": "https://docs.iotools.cloud/errors/tool_not_found",
"title": "Tool not found",
"status": 404,
"code": "tool_not_found",
"detail": "No tool with that slug. See GET /v1/tools/list.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"
}
{
"type": "https://docs.iotools.cloud/errors/payload_too_large",
"title": "Payload too large",
"status": 413,
"code": "payload_too_large",
"detail": "Request body exceeds this tool's size limit.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"
}
{
"type": "https://docs.iotools.cloud/errors/unprocessable_input",
"title": "Input cannot be processed",
"status": 422,
"code": "unprocessable_input",
"detail": "This video has no captions or subtitles, so there is no transcript to extract.",
"request_id": "e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11",
"credits_used": 0
}
{"docsConfig":{"theme":"aspen","$schema":"https://mintlify.com/docs.json","name":"IOTools.cloud","description":"Documentation for IOTools.cloud — call 900+ developer tools over one REST endpoint or from any MCP client, with one API key and one credit balance.","colors":{"primary":"#464aff","light":"#7376ff","dark":"#464aff"},"logo":{"light":"https://mintcdn.com/iotools/2jma-eQqoJSeCWag/images/logo.svg?fit=max\u0026auto=format\u0026n=2jma-eQqoJSeCWag\u0026q=85\u0026s=370b58e8746a0ae199ccff2d543db695","dark":"https://mintcdn.com/iotools/2jma-eQqoJSeCWag/images/logo.svg?fit=max\u0026auto=format\u0026n=2jma-eQqoJSeCWag\u0026q=85\u0026s=370b58e8746a0ae199ccff2d543db695","href":"https://iotools.cloud"},"favicon":"https://mintcdn.com/iotools/2jma-eQqoJSeCWag/images/favicon.svg?fit=max\u0026auto=format\u0026n=2jma-eQqoJSeCWag\u0026q=85\u0026s=9696f90dc0e46f37e69f70429db2b6a7","api":{"openapi":"https://api.iotools.cloud/v1/openapi","playground":{"display":"interactive"}},"background":{"color":{"light":"#faf6f0","dark":"#17140f"}},"navbar":{"links":[{"href":"https://iotools.cloud/contact/","label":"Support"}],"primary":{"type":"button","label":"Get an API key","href":"https://iotools.cloud/account/#api-keys"}},"footer":{"socials":{"x-twitter":"https://x.com/io_tools","facebook":"https://www.facebook.com/iotools.cloud","youtube":"https://www.youtube.com/@io-tools","linkedin":"https://www.linkedin.com/company/io-tools"}},"seo":{"metatags":{"og:type":"website","og:site_name":"IOTools.cloud Docs","twitter:card":"summary_large_image","twitter:site":"@io_tools"},"organization":{"id":"https://iotools.cloud/#organization","name":"iotools.cloud","url":"https://iotools.cloud","logo":"https://iotools.cloud/logo.svg","sameAs":["https://x.com/io_tools","https://www.facebook.com/iotools.cloud","https://www.youtube.com/@io-tools","https://www.linkedin.com/company/io-tools/"]},"indexing":"navigable","trailingSlash":true},"fonts":{"heading":{"family":"Instrument Serif"},"body":{"family":"Plus Jakarta Sans","weight":400}},"icons":{"library":"lucide"},"styling":{"codeblocks":"system","latex":false},"integrations":{"ga4":{"measurementId":"G-GN201XEE6W"}},"contextual":{"options":["copy","view","chatgpt","claude","perplexity"],"display":"header"},"variables":{"tools_count":"1400+","api_base_url":"https://api.iotools.cloud/v1","account_url":"https://iotools.cloud/account/","pricing_url":"https://iotools.cloud/pricing/","free_credits_limit":"1,000","free_rate_limit":"60","free_min_credits":"5","builder_credits_limit":"50,000","builder_rate_limit":"300","builder_min_credits":"1","ai_image_credit_cost":"640","ai_text_credit_range":"12–24","server_tool_credit_range":"1–2","usage_history_days":"30","mcp_default_tool_count":"5","mcp_full_listing_tokens":"215k","n8n_operation_count":"six","n8n_retry_max":"3","zapier_operation_count":"four","make_operation_count":"six"},"navigation":{"global":{"anchors":[{"anchor":"Tools","icon":"wrench","href":"https://iotools.cloud/tools/"},{"anchor":"Pricing","icon":"credit-card","href":"https://iotools.cloud/pricing/"},{"anchor":"Changelog","icon":"history","href":"https://iotools.cloud/changelog/"},{"anchor":"OpenAPI spec","icon":"code","href":"https://api.iotools.cloud/v1/openapi"}]},"pages":[]}},"deployment":{"deploymentMetadataValue":{"subdomain":"iotools","hasAudioNarration":false,"actualSubdomain":"iotools","customDomains":["docs.iotools.cloud"],"gitSource":{"type":"github","owner":"quangthien27","repo":"iotools","deployBranch":"main","contentDirectory":"apps/docs","isPrivate":true,"mountPath":"","label":""},"feedback":{"thumbs":true},"entitlements":{},"buildId":"6aec582099b37059de189cda","clientVersion":"0.0.4111","searchFilterCounts":[{"language":"default","tag":"API Reference","count":1450},{"language":"default","tag":"Tools","count":1444},{"language":"default","tag":"Calculators","count":482},{"language":"default","tag":"Generators","count":443},{"language":"default","tag":"Converters","count":260},{"language":"default","tag":"Utilities","count":163},{"language":"default","tag":"Formatters","count":89},{"language":"default","tag":"Guides","count":15},{"language":"default","tag":"Features","count":10},{"language":"default","tag":"Editors","count":7}]},"assistantConfig":{"enableAskAiButton":false,"enableStarterQuestions":false,"enableContextualStarterQuestions":false,"enableAskAiSearchBar":true},"basePath":"","hasChatPermissions":false,"hasWebMcpPermissions":false,"toggles":[{"name":"kill-isr","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"custom-rbac-roles","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"agent-mintlify-slack","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"agent-integrations-settings","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"rbac-expansion","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"automations-pr-grouping","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"custom-prefix","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"analytics-v7","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"user-flows-analytics","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"no-publish-flow","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"workos-onboarding","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"llms-txt-v2","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"snapshot-serving-live","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"stripTemperatureMiddleware","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"support-platform-pylon-zendesk","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"snapshot-serving","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"instant-rollback","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"granular-notifications-server","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"granular-notifications","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"automations-fable","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"fixed-ai-action-pricing","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"automation-resolve-merge-conflict","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"scoped-publishing","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"mintql","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"page-level-analytics","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"editor-version-history-v2","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"billing-page-v2","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"full-page-search","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"workspace-projects","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"assistant-v5","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"fork-pr-previews","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"revalidation-jwt","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"workos-sso-scim","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"hobby-abuse-scan","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"dashboard-inbox","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"workos-signup","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"turbopuffer-dual-write","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"workos-enabled","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"approve-review-flow","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"editor-metadata","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"sso-setup-deadline-banner","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"turbopuffer-serve","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false},{"name":"live-agents","enabled":true,"variant":{"name":"disabled","enabled":false,"feature_enabled":true},"impressionData":false}],"googleFontsInlined":true},"customCss":[{"filePath":"style.css","content":":root{--gray-100: 225 225 225}button{--font-weight-body-custom: 600}h1,h2,h3{letter-spacing:normal;font-weight:500}h2{font-size:1.5rem}#content-area,#content-area .prose,#content-area p,#content-area li,#content-area td,#content-area th{font-size:14px;line-height:1.7}#content-area .prose :where(p,li,td,th){font-size:14px}.prose :where(h1,h2,h3):not(:where([class~=not-prose],[class~=not-prose] *)){letter-spacing:normal}.prose :where(h4):not(:where([class~=not-prose],[class~=not-prose] *)){font-size:1.5rem}.tryit-button{background-color:rgb(var(--primary))!important}.tryit-button:hover{opacity:0.85}.nav-logo{border-radius:5px}#topbar-cta-button a span{font-weight:600!important}#navbar-transition{border-color:rgb(var(--gray-100))!important}#sidebar-content h2,#sidebar-content h3{font-weight:600}#table-of-contents h2{margin-bottom:1rem}"}],"page":{"pagePath":"api-reference/calculators/construction-schedule-calculator","slug":"/api-reference/calculators/construction-schedule-calculator","pageMetadata":{"title":"Construction Schedule Calculator API","description":"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM).\n\n[Try Construction Schedule Calculator in your browser →](https://iotools.cloud/tool/construction-schedule-calculator/)","deprecated":null,"version":null,"sidebarTitle":"Construction Schedule Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/construction-schedule-calculator","href":"/api-reference/calculators/construction-schedule-calculator","autogeneratedByOpenApi":true},"description":{"compiledSource":"\"use strict\";\nconst {Fragment: _Fragment, jsx: _jsx, jsxs: _jsxs} = arguments[0];\nconst {useMDXComponents: _provideComponents} = arguments[0];\nfunction _createMdxContent(props) {\n const _components = {\n a: \"a\",\n p: \"p\",\n ..._provideComponents(),\n ...props.components\n };\n return _jsxs(_Fragment, {\n children: [_jsx(_components.p, {\n children: \"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM).\"\n }), \"\\n\", _jsx(_components.p, {\n children: _jsx(_components.a, {\n href: \"https://iotools.cloud/tool/construction-schedule-calculator/\",\n children: \"Try Construction Schedule Calculator in your browser →\"\n })\n })]\n });\n}\nfunction MDXContent(props = {}) {\n const {wrapper: MDXLayout} = {\n ..._provideComponents(),\n ...props.components\n };\n return MDXLayout ? _jsx(MDXLayout, {\n ...props,\n children: _jsx(_createMdxContent, {\n ...props\n })\n }) : _createMdxContent(props);\n}\nreturn {\n default: MDXContent\n};\n","frontmatter":{},"scope":{}},"pageType":"default","mdx":{"mdxSource":{"compiledSource":"\"use strict\";const{Fragment:_Fragment,jsx:_jsx}=arguments[0];const{useMDXComponents:_provideComponents}=arguments[0];function _createMdxContent(props){return _jsx(_Fragment,{})}function MDXContent(props={}){const{wrapper:MDXLayout}={..._provideComponents(),...props.components};return MDXLayout?_jsx(MDXLayout,{...props,children:_jsx(_createMdxContent,{...props})}):_createMdxContent(props)}return{default:MDXContent}","frontmatter":{},"scope":{"codeStyling":"system","config":{},"pageMetadata":{"title":"Construction Schedule Calculator API","description":"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM).\n\n[Try Construction Schedule Calculator in your browser →](https://iotools.cloud/tool/construction-schedule-calculator/)","deprecated":null,"version":null,"sidebarTitle":"Construction Schedule Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/construction-schedule-calculator","href":"/api-reference/calculators/construction-schedule-calculator","autogeneratedByOpenApi":true}}},"mdxSourceWithNoJs":null},"mdxExtracts":{"tableOfContents":[],"codeExamples":{}},"jsLinks":[],"openApiReferenceData":{"operation":{"operationId":"run_construction_schedule_calculator","summary":"Construction Schedule Calculator","tags":["Calculators"],"description":"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM).\n\n[Try Construction Schedule Calculator in your browser →](https://iotools.cloud/tool/construction-schedule-calculator/)","security":["684d61bf-016f-4e26-9518-15d835574991"],"x-iotools-credit-cost":5,"x-mint":{"metadata":{"title":"Construction Schedule Calculator API","sidebarTitle":"Construction Schedule Calculator"},"href":"/api-reference/calculators/construction-schedule-calculator"},"requestBody":"83ff9351-1571-4bf7-9f83-69eb249aa8f4","responses":{"200":"635750c4-37ab-492b-ad15-6ab76a60893c","400":"70922144-ae17-417a-8888-230d6551296e","401":"e7078a63-3204-4069-9648-558db029fa62","402":"e0959e18-b76d-41e8-85a0-2642d1da4c3b","403":"4ca867ce-1258-48a0-bb98-2538b0c69197","404":"4dfd9504-fd50-4e98-9089-8274a10f548d","413":"eae02aa6-1b38-40e5-8dde-97e2b520dd0f","422":"142a4981-20bb-4cf3-844d-2ac635db9205","429":"1ef7110f-b450-4989-8a9a-65521e26d2ac","500":"3c374b3b-16dc-48b8-86a4-240cecf6d7aa","503":"0670bf91-3a97-4b53-aee6-feaf3fd173d9"},"method":"post","type":"path","servers":["6b943fc2-7a21-49bd-b5c7-a9652452b988"],"path":"/v1/tool/construction-schedule-calculator","baseUrlOptions":["https://api.iotools.cloud"],"title":"Construction Schedule Calculator","codeSamples":[],"requiredOnlyExamples":false,"requestExampleType":"generated","responseExampleType":"generated"},"dependencies":{"parameters":{},"requestBody":{"required":true,"content":{"application/json":{"schema":{"type":"object","properties":{"tasks":{"type":"string","description":"Tasks","isRequired":true,"uniqueKey":"tasks","typeLabel":"string"},"startDate":{"type":"string","description":"Start date (optional)","uniqueKey":"startDate","typeLabel":"string"},"workWeek":{"enum":["5","6","7"],"description":"Work week","type":"string","uniqueKey":"workWeek","typeLabel":"enum\u003cstring>"}},"required":["tasks"],"uniqueKey":"","typeLabel":"object"},"examples":{"small_building_8_tasks":{"title":"small_building_8_tasks","value":{"tasks":"Site clearing, 3\nExcavation, 5, 1\nFoundations, 10, 2\nUnderground services, 6, 2\nStructure, 20, 3\nRoof, 8, 5\nExternal works, 7, 4; 5\nFinishes, 15, 6","startDate":"2026-01-05","workWeek":"5"}}},"exampleType":"examples"}},"exampleType":"examples"},"responses":{"635750c4-37ab-492b-ad15-6ab76a60893c":{"description":"Tool output","content":{"application/json":{"examples":{"small_building_8_tasks":{"title":"small_building_8_tasks","value":{"tool":"construction-schedule-calculator","tool_version":"1.0.2","outputs":{"summary":"61 working days (≈ 12.2 weeks) · finishes 2026-03-30","criticalPath":"Site clearing → Excavation → Foundations → Structure → Roof → Finishes","results":[{"no":"1","task":"Site clearing","days":"3","start":"2026-01-05","finish":"2026-01-07","float":"0","critical":"Yes"},{"no":"2","task":"Excavation","days":"5","start":"2026-01-08","finish":"2026-01-14","float":"0","critical":"Yes"},{"no":"3","task":"Foundations","days":"10","start":"2026-01-15","finish":"2026-01-28","float":"0","critical":"Yes"},{"no":"4","task":"Underground services","days":"6","start":"2026-01-15","finish":"2026-01-22","float":"40","critical":"No"},{"no":"5","task":"Structure","days":"20","start":"2026-01-29","finish":"2026-02-25","float":"0","critical":"Yes"},{"no":"6","task":"Roof","days":"8","start":"2026-02-26","finish":"2026-03-09","float":"0","critical":"Yes"},{"no":"7","task":"External works","days":"7","start":"2026-02-26","finish":"2026-03-06","float":"16","critical":"No"},{"no":"8","task":"Finishes","days":"15","start":"2026-03-10","finish":"2026-03-30","float":"0","critical":"Yes"}]},"credits_used":5,"credits_remaining":null}}},"schema":{"type":"object","required":["tool","tool_version","outputs","credits_used","credits_remaining"],"properties":{"outputs":{"type":"object","properties":{"summary":{"type":"string","description":"Summary","uniqueKey":"outputs.summary","typeLabel":"string"},"criticalPath":{"type":"string","description":"Critical path","uniqueKey":"outputs.criticalPath","typeLabel":"string"},"results":{"type":"array","items":{"type":"object","properties":{"no":{"type":"string","description":"#","uniqueKey":"outputs.results.items.[INDEX].no","typeLabel":"string"},"task":{"type":"string","description":"Task","uniqueKey":"outputs.results.items.[INDEX].task","typeLabel":"string"},"days":{"type":"string","description":"Days","uniqueKey":"outputs.results.items.[INDEX].days","typeLabel":"string"},"start":{"type":"string","description":"Start","uniqueKey":"outputs.results.items.[INDEX].start","typeLabel":"string"},"finish":{"type":"string","description":"Finish","uniqueKey":"outputs.results.items.[INDEX].finish","typeLabel":"string"},"float":{"type":"string","description":"Float","uniqueKey":"outputs.results.items.[INDEX].float","typeLabel":"string"},"critical":{"type":"string","description":"Critical","uniqueKey":"outputs.results.items.[INDEX].critical","typeLabel":"string"}},"uniqueKey":"outputs.results.items.[INDEX]","typeLabel":"object"},"x-iotools-columns":["no","task","days","start","finish","float","critical"],"uniqueKey":"outputs.results","typeLabel":"object[]"}},"isRequired":true,"uniqueKey":"outputs","typeLabel":"object"},"tool":{"type":"string","description":"The tool's slug, echoing the {slug} in the request path.","isRequired":true,"uniqueKey":"tool","typeLabel":"string"},"tool_version":{"type":"string","description":"Output-contract version for this tool.","isRequired":true,"uniqueKey":"tool_version","typeLabel":"string"},"credits_used":{"type":"integer","description":"Credits this call consumed, after any settlement refund. 0 when metering is disabled.","isRequired":true,"uniqueKey":"credits_used","typeLabel":"integer"},"credits_remaining":{"oneOf":[{"type":"integer","description":"Credits left in the current monthly allowance, or null when metering is disabled.","isRequired":true,"uniqueKey":"credits_remaining.oneOf.0","typeLabel":"integer"},{"type":"null","description":"Credits left in the current monthly allowance, or null when metering is disabled.","isRequired":true,"uniqueKey":"credits_remaining.oneOf.1","typeLabel":"null"}],"isRequired":true,"uniqueKey":"credits_remaining","typeLabel":"integer | null"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"}},"uniqueKey":"","typeLabel":"object"},"exampleType":"examples"}},"exampleType":"examples"},"70922144-ae17-417a-8888-230d6551296e":{"description":"Invalid request.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/validation_error"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Invalid request"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["validation_error"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"},"fields":{"oneOf":[{"type":"object","additionalProperties":{"type":"string","uniqueKey":"fields.oneOf.0.additionalProperties","typeLabel":"string"},"description":"What failed: a map of field name → message. Absent when the body itself is malformed; a single string when the failure isn't tied to one field.","uniqueKey":"fields.oneOf.0","typeLabel":"object"},{"type":"string","additionalProperties":{"type":"string","uniqueKey":"fields.oneOf.1.additionalProperties","typeLabel":"string"},"description":"What failed: a map of field name → message. Absent when the body itself is malformed; a single string when the failure isn't tied to one field.","uniqueKey":"fields.oneOf.1","typeLabel":"string"}],"uniqueKey":"fields","typeLabel":"object | string"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/validation_error","title":"Invalid request","status":400,"code":"validation_error","detail":"One or more inputs are invalid — see `fields`.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","fields":{"inputString":"Required"}},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/validation_error","title":"Invalid request","status":400,"code":"validation_error","detail":"One or more inputs are invalid — see `fields`.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","fields":{"inputString":"Required"}}}},"exampleType":"examples"}},"exampleType":"examples"},"e7078a63-3204-4069-9648-558db029fa62":{"description":"Missing or invalid API key.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/invalid_api_key"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Invalid API key"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["invalid_api_key"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/invalid_api_key","title":"Invalid API key","status":401,"code":"invalid_api_key","detail":"Provide 'Authorization: Bearer \u003ckey>'.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/invalid_api_key","title":"Invalid API key","status":401,"code":"invalid_api_key","detail":"Provide 'Authorization: Bearer \u003ckey>'.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"}}},"exampleType":"examples"}},"exampleType":"examples"},"e0959e18-b76d-41e8-85a0-2642d1da4c3b":{"description":"Monthly credit allowance exhausted.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/insufficient_credits","https://docs.iotools.cloud/errors/vendor_api_tier_limit_exceeded"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Insufficient credits","Free-tier API limit reached for this tool"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["insufficient_credits","vendor_api_tier_limit_exceeded"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"},"credits_used":{"type":"integer","description":"Always 0 — a refused call charges nothing.","uniqueKey":"credits_used","typeLabel":"integer"},"credits_remaining":{"type":"integer","description":"Credits left in the allowance — fewer than this call costs.","uniqueKey":"credits_remaining","typeLabel":"integer"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/insufficient_credits","title":"Insufficient credits","status":402,"code":"insufficient_credits","detail":"This call costs 1 credit and 0 remain in this month's allowance.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","credits_used":0,"credits_remaining":0},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/insufficient_credits","title":"Insufficient credits","status":402,"code":"insufficient_credits","detail":"This call costs 1 credit and 0 remain in this month's allowance.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","credits_used":0,"credits_remaining":0}}},"exampleType":"examples"}},"exampleType":"examples"},"4ca867ce-1258-48a0-bb98-2538b0c69197":{"description":"Tool exists but has no API surface.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/tool_not_allowed"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Tool not available over the API"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["tool_not_allowed"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/tool_not_allowed","title":"Tool not available over the API","status":403,"code":"tool_not_allowed","detail":"\"Background Remover\" is available on iotools.cloud but has no API endpoint.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/tool_not_allowed","title":"Tool not available over the API","status":403,"code":"tool_not_allowed","detail":"\"Background Remover\" is available on iotools.cloud but has no API endpoint.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"}}},"exampleType":"examples"}},"exampleType":"examples"},"4dfd9504-fd50-4e98-9089-8274a10f548d":{"description":"No such tool.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/tool_not_found"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Tool not found"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["tool_not_found"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/tool_not_found","title":"Tool not found","status":404,"code":"tool_not_found","detail":"No tool with that slug. See GET /v1/tools/list.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/tool_not_found","title":"Tool not found","status":404,"code":"tool_not_found","detail":"No tool with that slug. See GET /v1/tools/list.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"}}},"exampleType":"examples"}},"exampleType":"examples"},"eae02aa6-1b38-40e5-8dde-97e2b520dd0f":{"description":"Body too large.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/payload_too_large"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Payload too large"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["payload_too_large"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/payload_too_large","title":"Payload too large","status":413,"code":"payload_too_large","detail":"Request body exceeds this tool's size limit.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/payload_too_large","title":"Payload too large","status":413,"code":"payload_too_large","detail":"Request body exceeds this tool's size limit.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"}}},"exampleType":"examples"}},"exampleType":"examples"},"142a4981-20bb-4cf3-844d-2ac635db9205":{"description":"Well-formed request, but there is no result to return.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/unprocessable_input"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Input cannot be processed"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["unprocessable_input"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"},"credits_used":{"type":"integer","description":"Always 0 on `unprocessable_input` — a failed run is refunded, floor included.","uniqueKey":"credits_used","typeLabel":"integer"},"credits_remaining":{"type":"integer","description":"Credits left after the refund. Absent when metering is disabled.","uniqueKey":"credits_remaining","typeLabel":"integer"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/unprocessable_input","title":"Input cannot be processed","status":422,"code":"unprocessable_input","detail":"This video has no captions or subtitles, so there is no transcript to extract.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","credits_used":0},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/unprocessable_input","title":"Input cannot be processed","status":422,"code":"unprocessable_input","detail":"This video has no captions or subtitles, so there is no transcript to extract.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","credits_used":0}}},"exampleType":"examples"}},"exampleType":"examples"},"1ef7110f-b450-4989-8a9a-65521e26d2ac":{"description":"Per-minute rate limit exceeded.","headers":{"Retry-After":{"description":"Seconds to wait before retrying (RFC 9110 delta-seconds).","schema":{"type":"integer"}}},"content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/rate_limited"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Rate limit exceeded"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["rate_limited"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"},"retry_after":{"type":"integer","description":"Seconds until the window resets — the same value as the `Retry-After` header.","uniqueKey":"retry_after","typeLabel":"integer"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/rate_limited","title":"Rate limit exceeded","status":429,"code":"rate_limited","detail":"Too many requests. Retry in 30s.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","retry_after":30},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/rate_limited","title":"Rate limit exceeded","status":429,"code":"rate_limited","detail":"Too many requests. Retry in 30s.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","retry_after":30}}},"exampleType":"examples"}},"exampleType":"examples"},"3c374b3b-16dc-48b8-86a4-240cecf6d7aa":{"description":"Tool failed to run.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/processing_error","https://docs.iotools.cloud/errors/internal_error"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Tool failed to run","Internal error"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["processing_error","internal_error"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"},"credits_used":{"type":"integer","description":"Always 0 on `processing_error` — a failed run is refunded, floor included.","uniqueKey":"credits_used","typeLabel":"integer"},"credits_remaining":{"type":"integer","description":"Credits left after the refund. Absent when metering is disabled.","uniqueKey":"credits_remaining","typeLabel":"integer"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/processing_error","title":"Tool failed to run","status":500,"code":"processing_error","detail":"The tool failed to run. Please try again.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","credits_used":0},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/processing_error","title":"Tool failed to run","status":500,"code":"processing_error","detail":"The tool failed to run. Please try again.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11","credits_used":0}}},"exampleType":"examples"}},"exampleType":"examples"},"0670bf91-3a97-4b53-aee6-feaf3fd173d9":{"description":"Tool temporarily disabled.","content":{"application/problem+json":{"schema":{"type":"object","description":"RFC 9457 problem document, served as application/problem+json. Branch on `code`; `title` is human prose and may be reworded without notice. Some failures add extension members — `fields` on validation errors, `retry_after` on 429s, `credits_used`/`credits_remaining` on billing-adjacent failures — documented on the responses that carry them.","required":["type","title","status","code"],"properties":{"type":{"type":"string","format":"uri","description":"Stable documentation URI for this failure.","examples":["https://docs.iotools.cloud/errors/tool_disabled","https://docs.iotools.cloud/errors/api_unconfigured"],"isRequired":true,"uniqueKey":"type","typeLabel":"string\u003curi>"},"title":{"type":"string","description":"Short human-readable summary of the failure.","examples":["Tool temporarily disabled","API not configured"],"isRequired":true,"uniqueKey":"title","typeLabel":"string"},"status":{"type":"integer","description":"HTTP status code, matching the response's own status.","isRequired":true,"uniqueKey":"status","typeLabel":"integer"},"code":{"type":"string","description":"Stable machine-readable error code — branch on this, not `title`.","enum":["tool_disabled","api_unconfigured"],"isRequired":true,"uniqueKey":"code","typeLabel":"enum\u003cstring>"},"detail":{"type":"string","description":"Human explanation of this occurrence.","uniqueKey":"detail","typeLabel":"string"},"request_id":{"type":"string","description":"Correlation id, also sent as x-request-id.","uniqueKey":"request_id","typeLabel":"string"}},"uniqueKey":"","typeLabel":"object"},"example":{"type":"https://docs.iotools.cloud/errors/tool_disabled","title":"Tool temporarily disabled","status":503,"code":"tool_disabled","detail":"This tool is temporarily unavailable. Try again shortly.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"},"examples":{"Example":{"title":"Example","value":{"type":"https://docs.iotools.cloud/errors/tool_disabled","title":"Tool temporarily disabled","status":503,"code":"tool_disabled","detail":"This tool is temporarily unavailable. Try again shortly.","request_id":"e4042b29-8f1e-4c7a-9b52-6f0d1a3c7e11"}}},"exampleType":"examples"}},"exampleType":"examples"}},"security":{"684d61bf-016f-4e26-9518-15d835574991":{"bearerAuth":{"type":"http","scheme":"bearer","bearerFormat":"iot_live_…","scopes":[],"schemeName":"bearerAuth"}}},"servers":{"6b943fc2-7a21-49bd-b5c7-a9652452b988":{"url":"https://api.iotools.cloud","description":"Production"}},"processedSecurityOptions":[{"schemes":[{"scheme":{"type":"http","scheme":"bearer","bearerFormat":"iot_live_…","scopes":[],"schemeName":"bearerAuth"},"schema":{"title":"Bearer Auth","type":"string","isRequired":true,"description":"Bearer authentication header of the form `Bearer \u003ctoken>`, where `\u003ctoken>` is your auth token.","format":"bearer","typeLabel":"string\u003cbearer>","deprecated":false},"schemeName":"bearerAuth","name":"Authorization"}],"title":"bearerAuth"}]},"originalFileLocation":"https://api.iotools.cloud/v1/openapi"},"subdomain":"iotools","siteName":"IOTools.cloud","title":"Construction Schedule Calculator API - IOTools.cloud","navMaps":{"firstHrefInVersion":{},"firstHrefInLanguage":{}},"lastModified":"2026-11-05T10:20:13.540Z","originalFileLocation":"api-reference/calculators/construction-schedule-calculator.mdx"},"headHtml":"\u003cscript data-mint-head>(function(){var d=document.documentElement,p=null;if(!p){try{p=localStorage.getItem(\"isDarkMode\")}catch(e){}if(p==='true')p='dark';else if(p==='false')p='light';if(p!=='light'\u0026\u0026p!=='dark'\u0026\u0026p!=='system')p=\"system\"}var r=p==='system'?(matchMedia(\"(prefers-color-scheme: dark)\").matches?'dark':'light'):p;d.classList.remove(r==='dark'?'light':'dark');d.classList.add(r);d.setAttribute(\"data-theme-preference\",p)})();\u003c/script>\u003cmeta data-mint-head name=\"description\" content=\"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM). Try Construction Schedule Calculator in your browser →\">\u003cmeta data-mint-head name=\"application-name\" content=\"IOTools.cloud\">\u003cmeta data-mint-head name=\"generator\" content=\"Mintlify\">\u003clink data-mint-head rel=\"icon\" type=\"image/png\" sizes=\"192x192\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon/android-chrome-192x192.png\" media=\"(prefers-color-scheme: light)\">\u003clink data-mint-head rel=\"apple-touch-icon\" type=\"image/png\" sizes=\"180x180\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon/apple-touch-icon.png\">\u003clink data-mint-head rel=\"icon\" type=\"image/png\" sizes=\"16x16\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon/favicon-16x16.png\" media=\"(prefers-color-scheme: light)\">\u003clink data-mint-head rel=\"icon\" type=\"image/png\" sizes=\"32x32\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon/favicon-32x32.png\" media=\"(prefers-color-scheme: light)\">\u003clink data-mint-head rel=\"shortcut icon\" type=\"image/x-icon\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon/favicon.ico\" media=\"(prefers-color-scheme: light)\">\u003clink data-mint-head rel=\"icon\" type=\"image/png\" sizes=\"192x192\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon-dark/android-chrome-192x192.png\" media=\"(prefers-color-scheme: dark)\">\u003clink data-mint-head rel=\"icon\" type=\"image/png\" sizes=\"16x16\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon-dark/favicon-16x16.png\" media=\"(prefers-color-scheme: dark)\">\u003clink data-mint-head rel=\"icon\" type=\"image/png\" sizes=\"32x32\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon-dark/favicon-32x32.png\" media=\"(prefers-color-scheme: dark)\">\u003clink data-mint-head rel=\"shortcut icon\" type=\"image/x-icon\" href=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon-dark/favicon.ico\" media=\"(prefers-color-scheme: dark)\">\u003cmeta data-mint-head property=\"og:title\" content=\"Construction Schedule Calculator API - IOTools.cloud\">\u003cmeta data-mint-head property=\"og:description\" content=\"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM). Try Construction Schedule Calculator in your browser →\">\u003cmeta data-mint-head property=\"og:site_name\" content=\"IOTools.cloud Docs\">\u003cmeta data-mint-head property=\"og:url\" content=\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/\">\u003cmeta data-mint-head property=\"og:type\" content=\"website\">\u003cmeta data-mint-head property=\"og:image\" content=\"https://iotools.mintlify.site/_mintlify/api/og/v2?division=Calculators\u0026amp;title=Construction+Schedule+Calculator+API\u0026amp;description=Estimate+a+construction+schedule+from+task+durations+and+dependencies%3A+total+project+duration%2C+finish+date%2C+critical+path+and+float+for+every+task+%28CPM%29.%0A%0A%5BTry+\u0026amp;theme=000a602762f56830e25b8550\u0026amp;signature=9a2359842afc9a4770fc61c8ea4be03ff1fee99ba0a8567714d355ee6b0f5676\">\u003cmeta data-mint-head property=\"og:image:width\" content=\"1200\">\u003cmeta data-mint-head property=\"og:image:height\" content=\"630\">\u003cmeta data-mint-head name=\"twitter:card\" content=\"summary_large_image\">\u003cmeta data-mint-head name=\"twitter:title\" content=\"Construction Schedule Calculator API - IOTools.cloud\">\u003cmeta data-mint-head name=\"twitter:description\" content=\"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM). Try Construction Schedule Calculator in your browser →\">\u003cmeta data-mint-head name=\"twitter:image\" content=\"https://iotools.mintlify.site/_mintlify/api/og/v2?division=Calculators\u0026amp;title=Construction+Schedule+Calculator+API\u0026amp;description=Estimate+a+construction+schedule+from+task+durations+and+dependencies%3A+total+project+duration%2C+finish+date%2C+critical+path+and+float+for+every+task+%28CPM%29.%0A%0A%5BTry+\u0026amp;theme=000a602762f56830e25b8550\u0026amp;signature=9a2359842afc9a4770fc61c8ea4be03ff1fee99ba0a8567714d355ee6b0f5676\">\u003cmeta data-mint-head name=\"twitter:image:width\" content=\"1200\">\u003cmeta data-mint-head name=\"twitter:image:height\" content=\"630\">\u003cmeta data-mint-head name=\"msapplication-config\" content=\"/mintlify-assets/_mintlify/favicons/iotools/G58CVLFct1_TzMms/_generated/favicon/browserconfig.xml\">\u003cmeta data-mint-head name=\"apple-mobile-web-app-title\" content=\"IOTools.cloud\">\u003cmeta data-mint-head name=\"msapplication-TileColor\" content=\"#464aff\">\u003clink data-mint-head rel=\"canonical\" href=\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/\">\u003clink data-mint-head rel=\"alternate\" type=\"application/xml\" href=\"/sitemap.xml\">\u003clink data-mint-head rel=\"alternate\" type=\"text/markdown\" href=\"/api-reference/calculators/construction-schedule-calculator.md\">\u003cscript data-mint-head type=\"application/ld+json\">{\"@context\":\"https://schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https://iotools.cloud/#organization\",\"name\":\"iotools.cloud\",\"url\":\"https://iotools.cloud\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https://iotools.cloud/logo.svg\"},\"sameAs\":[\"https://x.com/io_tools\",\"https://www.facebook.com/iotools.cloud\",\"https://www.youtube.com/@io-tools\",\"https://www.linkedin.com/company/io-tools/\"]},{\"@type\":\"WebSite\",\"@id\":\"https://docs.iotools.cloud#website\",\"name\":\"IOTools.cloud\",\"url\":\"https://docs.iotools.cloud\",\"publisher\":{\"@id\":\"https://iotools.cloud/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/#webpage\",\"url\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/\",\"name\":\"Construction Schedule Calculator API\",\"description\":\"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM). Try Construction Schedule Calculator in your browser →\",\"dateModified\":\"2026-11-05T10:20:13.540Z\",\"isPartOf\":{\"@id\":\"https://docs.iotools.cloud#website\"},\"breadcrumb\":{\"@id\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/#breadcrumb\"}},{\"@type\":\"BreadcrumbList\",\"@id\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Tools\",\"item\":\"https://docs.iotools.cloud\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Calculators\",\"item\":\"https://docs.iotools.cloud/api-reference/calculators/1099-vs-w2-income-comparison-calculator\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction Schedule Calculator API\",\"item\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/\"}]},{\"@type\":[\"TechArticle\",\"APIReference\"],\"@id\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/#apireference\",\"headline\":\"Construction Schedule Calculator API\",\"name\":\"Construction Schedule Calculator API\",\"description\":\"Estimate a construction schedule from task durations and dependencies: total project duration, finish date, critical path and float for every task (CPM). Try Construction Schedule Calculator in your browser →\",\"url\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/\",\"mainEntityOfPage\":{\"@id\":\"https://docs.iotools.cloud/api-reference/calculators/construction-schedule-calculator/#webpage\"},\"dateModified\":\"2026-11-05T10:20:13.540Z\",\"publisher\":{\"@id\":\"https://iotools.cloud/#organization\"},\"isPartOf\":{\"@id\":\"https://docs.iotools.cloud#website\"}}]}\u003c/script>\u003cscript data-mint-head type=\"application/ld+json\">{\"@context\":\"https://schema.org\",\"@type\":\"WebSite\",\"name\":\"IOTools.cloud\",\"publisher\":{\"@type\":\"Organization\",\"name\":\"iotools.cloud\"},\"provider\":{\"@type\":\"Organization\",\"name\":\"Mintlify\",\"url\":\"https://mintlify.com\"}}\u003c/script>","agentPointerHref":"/api-reference/calculators/construction-schedule-calculator.md","siteName":"IOTools.cloud","nav":{"global":{"anchors":[{"anchor":"Tools","icon":"wrench","href":"https://iotools.cloud/tools/"},{"anchor":"Pricing","icon":"credit-card","href":"https://iotools.cloud/pricing/"},{"anchor":"Changelog","icon":"history","href":"https://iotools.cloud/changelog/"},{"anchor":"OpenAPI spec","icon":"code","href":"https://api.iotools.cloud/v1/openapi"}]},"tabs":[{"tab":"Guides","pages":[{"title":"Guides","href":""}]},{"tab":"Features","pages":[{"title":"Features","href":"/features"}]},{"tab":"API Reference","groups":[{"group":"Overview","pages":[{"title":"Introduction","href":"/api-reference"}]},{"group":"Catalog","pages":[{"title":"List tools","deprecated":null,"version":null,"openapi":"https://api.iotools.cloud/v1/openapi get /v1/tools/list","href":"/api-reference/catalog/list-tools"},{"title":"Search tools","deprecated":null,"version":null,"openapi":"https://api.iotools.cloud/v1/openapi get /v1/tools/search","href":"/api-reference/catalog/search-tools"},{"title":"Get tool schema","deprecated":null,"version":null,"openapi":"https://api.iotools.cloud/v1/openapi get /v1/tool/{slug}","href":"/api-reference/catalog/get-tool-schema"}]},{"group":"Account","pages":[{"title":"Get credit balance","deprecated":null,"version":null,"openapi":"https://api.iotools.cloud/v1/openapi get /v1/me/credits","href":"/api-reference/account/get-credit-balance"},{"title":"Get credit usage history","deprecated":null,"version":null,"openapi":"https://api.iotools.cloud/v1/openapi get /v1/me/usage","href":"/api-reference/account/get-credit-usage-history"}]},{"group":"Tools","pages":[{"group":"Catalog","pages":[]},{"group":"Account","pages":[]},{"group":"Converters","pages":[{"title":"Acceleration Converter API","deprecated":null,"version":null,"sidebarTitle":"Acceleration Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/acceleration-converter","href":"/api-reference/converters/acceleration-converter"},{"title":"AES Encryption/Decryption API","deprecated":null,"version":null,"sidebarTitle":"AES Encryption/Decryption","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/aes-encryption-decryption","href":"/api-reference/converters/aes-encryptiondecryption"},{"title":"DES / Triple DES Encrypt \u0026 Decrypt API","deprecated":null,"version":null,"sidebarTitle":"DES / Triple DES Encrypt \u0026 Decrypt","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/des-encrypt-decrypt","href":"/api-reference/converters/des-triple-des-encrypt-\u0026-decrypt"},{"title":"Angle Converter API","deprecated":null,"version":null,"sidebarTitle":"Angle Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/angle-converter","href":"/api-reference/converters/angle-converter"},{"title":"Area Converter API","deprecated":null,"version":null,"sidebarTitle":"Area Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/area-converter","href":"/api-reference/converters/area-converter"},{"title":"Atbash Cipher API","deprecated":null,"version":null,"sidebarTitle":"Atbash Cipher","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/atbash-cipher","href":"/api-reference/converters/atbash-cipher"},{"title":"Base32 Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Base32 Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base32-encoder-decoder","href":"/api-reference/converters/base32-encoderdecoder"},{"title":"Base58 Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Base58 Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base58-encoder-decoder","href":"/api-reference/converters/base58-encoderdecoder"},{"title":"Base64 Decode API","deprecated":null,"version":null,"sidebarTitle":"Base64 Decode","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base64-decode","href":"/api-reference/converters/base64-decode"},{"title":"Base64 Image Preview \u0026 Decoder API","deprecated":null,"version":null,"sidebarTitle":"Base64 Image Preview \u0026 Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base64-image-preview-decoder","href":"/api-reference/converters/base64-image-preview-\u0026-decoder"},{"title":"Base64 Repair \u0026 Normalizer API","deprecated":null,"version":null,"sidebarTitle":"Base64 Repair \u0026 Normalizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base64-repair","href":"/api-reference/converters/base64-repair-\u0026-normalizer"},{"title":"Base64URL Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Base64URL Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base64url-encoder-decoder","href":"/api-reference/converters/base64url-encoderdecoder"},{"title":"Uuencode Converter API","deprecated":null,"version":null,"sidebarTitle":"Uuencode Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/uuencode-converter","href":"/api-reference/converters/uuencode-converter"},{"title":"Base85 (Ascii85) Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Base85 (Ascii85) Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base85-encoder-decoder","href":"/api-reference/converters/base85-ascii85-encoderdecoder"},{"title":"Bearing \u0026 Azimuth Converter API","deprecated":null,"version":null,"sidebarTitle":"Bearing \u0026 Azimuth Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bearing-azimuth-converter","href":"/api-reference/converters/bearing-\u0026-azimuth-converter"},{"title":"Bech32 Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Bech32 Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bech32-encoder-decoder","href":"/api-reference/converters/bech32-encoderdecoder"},{"title":"Bencode Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Bencode Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bencode-encoder-decoder","href":"/api-reference/converters/bencode-encoderdecoder"},{"title":"Binary to Gray Code Converter API","deprecated":null,"version":null,"sidebarTitle":"Binary to Gray Code Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/binary-gray-code","href":"/api-reference/converters/binary-to-gray-code-converter"},{"title":"Binary to Text Converter API","deprecated":null,"version":null,"sidebarTitle":"Binary to Text Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/binary-to-text-converter","href":"/api-reference/converters/binary-to-text-converter"},{"title":"Bionic Reading Converter API","deprecated":null,"version":null,"sidebarTitle":"Bionic Reading Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bionic-reading-converter","href":"/api-reference/converters/bionic-reading-converter"},{"title":"BMP to PDF API","deprecated":null,"version":null,"sidebarTitle":"BMP to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bmp-to-pdf","href":"/api-reference/converters/bmp-to-pdf"},{"title":"Braille Text Generator API","deprecated":null,"version":null,"sidebarTitle":"Braille Text Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/braille-text-generator","href":"/api-reference/converters/braille-text-generator"},{"title":"Bulk Image Compressor API","deprecated":null,"version":null,"sidebarTitle":"Bulk Image Compressor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bulk-image-compressor","href":"/api-reference/converters/bulk-image-compressor"},{"title":"Caesar Cipher API","deprecated":null,"version":null,"sidebarTitle":"Caesar Cipher","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/caesar-cipher","href":"/api-reference/converters/caesar-cipher"},{"title":"String Case Converter API","deprecated":null,"version":null,"sidebarTitle":"String Case Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/case-converter","href":"/api-reference/converters/string-case-converter"},{"title":"Text to SQL List Converter API","deprecated":null,"version":null,"sidebarTitle":"Text to SQL List Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-to-sql-list-converter","href":"/api-reference/converters/text-to-sql-list-converter"},{"title":"CBOR Encoder / Decoder API","deprecated":null,"version":null,"sidebarTitle":"CBOR Encoder / Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cbor-encoder-decoder","href":"/api-reference/converters/cbor-encoder-decoder"},{"title":"Electric Charge Converter API","deprecated":null,"version":null,"sidebarTitle":"Electric Charge Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/charge-converter","href":"/api-reference/converters/electric-charge-converter"},{"title":"Chmod Calculator API","deprecated":null,"version":null,"sidebarTitle":"Chmod Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/chmod-calculator","href":"/api-reference/converters/chmod-calculator"},{"title":"CMYK to Hex Converter API","deprecated":null,"version":null,"sidebarTitle":"CMYK to Hex Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cmyk-to-hex-converter","href":"/api-reference/converters/cmyk-to-hex-converter"},{"title":"Cocktail Measurement Converter API","deprecated":null,"version":null,"sidebarTitle":"Cocktail Measurement Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cocktail-measurement-converter","href":"/api-reference/converters/cocktail-measurement-converter"},{"title":"Color Temperature Converter API","deprecated":null,"version":null,"sidebarTitle":"Color Temperature Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-temp-converter","href":"/api-reference/converters/color-temperature-converter"},{"title":"Course Video to Text API","deprecated":null,"version":null,"sidebarTitle":"Course Video to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/course-video-to-text","href":"/api-reference/converters/course-video-to-text"},{"title":"Cooking Measurement Converter API","deprecated":null,"version":null,"sidebarTitle":"Cooking Measurement Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cooking-measurement-converter","href":"/api-reference/converters/cooking-measurement-converter"},{"title":"Coordinate Format Converter API","deprecated":null,"version":null,"sidebarTitle":"Coordinate Format Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/coordinate-format-converter","href":"/api-reference/converters/coordinate-format-converter"},{"title":"CRLF/LF Line Ending Converter API","deprecated":null,"version":null,"sidebarTitle":"CRLF/LF Line Ending Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/crlf-lf-line-ending-converter","href":"/api-reference/converters/crlflf-line-ending-converter"},{"title":"CSS Custom Properties to SCSS Variables Converter API","deprecated":null,"version":null,"sidebarTitle":"CSS Custom Properties to SCSS Variables Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-custom-properties-to-scss-converter","href":"/api-reference/converters/css-custom-properties-to-scss-variables-converter"},{"title":"CSS Logical Properties Converter API","deprecated":null,"version":null,"sidebarTitle":"CSS Logical Properties Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-logical-properties-converter","href":"/api-reference/converters/css-logical-properties-converter"},{"title":"CSS Nesting Converter API","deprecated":null,"version":null,"sidebarTitle":"CSS Nesting Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-nesting-converter","href":"/api-reference/converters/css-nesting-converter"},{"title":"CSS to JS Converter API","deprecated":null,"version":null,"sidebarTitle":"CSS to JS Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-to-js-converter","href":"/api-reference/converters/css-to-js-converter"},{"title":"CSS to JS Style Converter API","deprecated":null,"version":null,"sidebarTitle":"CSS to JS Style Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-to-js-style-converter","href":"/api-reference/converters/css-to-js-style-converter"},{"title":"CSS to Tailwind Converter API","deprecated":null,"version":null,"sidebarTitle":"CSS to Tailwind Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-to-tailwind-converter","href":"/api-reference/converters/css-to-tailwind-converter"},{"title":"CSV to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"CSV to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-to-json-converter","href":"/api-reference/converters/csv-to-json-converter"},{"title":"CSV to XML Converter API","deprecated":null,"version":null,"sidebarTitle":"CSV to XML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-to-xml-converter","href":"/api-reference/converters/csv-to-xml-converter"},{"title":"CSV to SQL Converter API","deprecated":null,"version":null,"sidebarTitle":"CSV to SQL Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-to-sql","href":"/api-reference/converters/csv-to-sql-converter"},{"title":"CSV to PO Converter API","deprecated":null,"version":null,"sidebarTitle":"CSV to PO Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-to-po","href":"/api-reference/converters/csv-to-po-converter"},{"title":"cURL to Code Converter API","deprecated":null,"version":null,"sidebarTitle":"cURL to Code Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/curl-to-code-converter","href":"/api-reference/converters/curl-to-code-converter"},{"title":"Dailymotion to Text API","deprecated":null,"version":null,"sidebarTitle":"Dailymotion to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dailymotion-to-text","href":"/api-reference/converters/dailymotion-to-text"},{"title":"Data Storage Converter API","deprecated":null,"version":null,"sidebarTitle":"Data Storage Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/data-storage-converter","href":"/api-reference/converters/data-storage-converter"},{"title":"Date-Time Format Converter API","deprecated":null,"version":null,"sidebarTitle":"Date-Time Format Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/date-time-format-converter","href":"/api-reference/converters/date-time-format-converter"},{"title":"Decibel (dB) Converter API","deprecated":null,"version":null,"sidebarTitle":"Decibel (dB) Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/decibel-converter","href":"/api-reference/converters/decibel-db-converter"},{"title":"Decimal to Time Converter API","deprecated":null,"version":null,"sidebarTitle":"Decimal to Time Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/decimal-to-time-converter","href":"/api-reference/converters/decimal-to-time-converter"},{"title":"Docker Run to Compose Converter API","deprecated":null,"version":null,"sidebarTitle":"Docker Run to Compose Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/docker-run-to-compose-converter","href":"/api-reference/converters/docker-run-to-compose-converter"},{"title":"Dotenv to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"Dotenv to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dotenv-to-json-converter","href":"/api-reference/converters/dotenv-to-json-converter"},{"title":"Electric Current Converter API","deprecated":null,"version":null,"sidebarTitle":"Electric Current Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/electric-converter","href":"/api-reference/converters/electric-current-converter"},{"title":"Energy Converter API","deprecated":null,"version":null,"sidebarTitle":"Energy Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/energy-converter","href":"/api-reference/converters/energy-converter"},{"title":"File Encoding Converter API","deprecated":null,"version":null,"sidebarTitle":"File Encoding Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/file-encoding-converter","href":"/api-reference/converters/file-encoding-converter"},{"title":"Astronomical Unit Converter API","deprecated":null,"version":null,"sidebarTitle":"Astronomical Unit Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/astronomical-unit-converter","href":"/api-reference/converters/astronomical-unit-converter"},{"title":"Force Unit Converter API","deprecated":null,"version":null,"sidebarTitle":"Force Unit Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/force-unit-converter","href":"/api-reference/converters/force-unit-converter"},{"title":"Fraction to Decimal Converter API","deprecated":null,"version":null,"sidebarTitle":"Fraction to Decimal Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fraction-decimal","href":"/api-reference/converters/fraction-to-decimal-converter"},{"title":"Frequency Converter API","deprecated":null,"version":null,"sidebarTitle":"Frequency Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/frequency-converter","href":"/api-reference/converters/frequency-converter"},{"title":"Geohash Converter API","deprecated":null,"version":null,"sidebarTitle":"Geohash Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/geohash-converter","href":"/api-reference/converters/geohash-converter"},{"title":"GeoJSON to WKT Converter API","deprecated":null,"version":null,"sidebarTitle":"GeoJSON to WKT Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/geojson-wkt-converter","href":"/api-reference/converters/geojson-to-wkt-converter"},{"title":"GIF to Sprite Sheet API","deprecated":null,"version":null,"sidebarTitle":"GIF to Sprite Sheet","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-to-sprite-sheet","href":"/api-reference/converters/gif-to-sprite-sheet"},{"title":"HAR to cURL Extractor API","deprecated":null,"version":null,"sidebarTitle":"HAR to cURL Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/har-to-curl-extractor","href":"/api-reference/converters/har-to-curl-extractor"},{"title":"HAR to Postman Collection Converter API","deprecated":null,"version":null,"sidebarTitle":"HAR to Postman Collection Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/har-to-postman-collection-converter","href":"/api-reference/converters/har-to-postman-collection-converter"},{"title":"Hardness Scale Converter API","deprecated":null,"version":null,"sidebarTitle":"Hardness Scale Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hardness-scale-converter","href":"/api-reference/converters/hardness-scale-converter"},{"title":"HCL to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"HCL to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hcl-to-json-converter","href":"/api-reference/converters/hcl-to-json-converter"},{"title":"Height Converter API","deprecated":null,"version":null,"sidebarTitle":"Height Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/height-converter","href":"/api-reference/converters/height-converter"},{"title":"HEX Color to Name API","deprecated":null,"version":null,"sidebarTitle":"HEX Color to Name","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hex-color-to-name","href":"/api-reference/converters/hex-color-to-name"},{"title":"HEX to RGBA Converter API","deprecated":null,"version":null,"sidebarTitle":"HEX to RGBA Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hex-to-rgba-converter","href":"/api-reference/converters/hex-to-rgba-converter"},{"title":"Hex to Text Converter API","deprecated":null,"version":null,"sidebarTitle":"Hex to Text Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hex-to-text","href":"/api-reference/converters/hex-to-text-converter"},{"title":"Hex to Base64 Converter API","deprecated":null,"version":null,"sidebarTitle":"Hex to Base64 Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hex-to-base64-converter","href":"/api-reference/converters/hex-to-base64-converter"},{"title":"HSV to RGB Converter API","deprecated":null,"version":null,"sidebarTitle":"HSV to RGB Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hsv-to-rgb-converter","href":"/api-reference/converters/hsv-to-rgb-converter"},{"title":"HTML Decode API","deprecated":null,"version":null,"sidebarTitle":"HTML Decode","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-decode","href":"/api-reference/converters/html-decode"},{"title":"HTML Encoder / Decoder API","deprecated":null,"version":null,"sidebarTitle":"HTML Encoder / Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-encoder-decoder","href":"/api-reference/converters/html-encoder-decoder"},{"title":"HTML Stripper API","deprecated":null,"version":null,"sidebarTitle":"HTML Stripper","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-stripper","href":"/api-reference/converters/html-stripper"},{"title":"HTML Table Extractor API","deprecated":null,"version":null,"sidebarTitle":"HTML Table Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-table-extractor","href":"/api-reference/converters/html-table-extractor"},{"title":"HTML to Markdown Converter API","deprecated":null,"version":null,"sidebarTitle":"HTML to Markdown Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-to-markdown","href":"/api-reference/converters/html-to-markdown-converter"},{"title":"iCalendar (ICS) to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"iCalendar (ICS) to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/icalendar-ics-to-json-converter","href":"/api-reference/converters/icalendar-ics-to-json-converter"},{"title":"IEEE 754 Floating Point Converter API","deprecated":null,"version":null,"sidebarTitle":"IEEE 754 Floating Point Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ieee-754-floating-point-converter","href":"/api-reference/converters/ieee-754-floating-point-converter"},{"title":"Image Compressor API","deprecated":null,"version":null,"sidebarTitle":"Image Compressor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-compressor","href":"/api-reference/converters/image-compressor"},{"title":"Image Converter API","deprecated":null,"version":null,"sidebarTitle":"Image Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter","href":"/api-reference/converters/image-converter"},{"title":"Any Image to AVIF Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to AVIF Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-avif","href":"/api-reference/converters/any-image-to-avif-converter"},{"title":"Any Image to BMP Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to BMP Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-bmp","href":"/api-reference/converters/any-image-to-bmp-converter"},{"title":"Any Image to GIF Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to GIF Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-gif","href":"/api-reference/converters/any-image-to-gif-converter"},{"title":"Any Image to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-jpg","href":"/api-reference/converters/any-image-to-jpg-converter"},{"title":"Any Image to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-png","href":"/api-reference/converters/any-image-to-png-converter"},{"title":"Any Image to TIFF Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to TIFF Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-tiff","href":"/api-reference/converters/any-image-to-tiff-converter"},{"title":"Any Image to WebP Converter API","deprecated":null,"version":null,"sidebarTitle":"Any Image to WebP Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/to-webp","href":"/api-reference/converters/any-image-to-webp-converter"},{"title":"AVIF to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"AVIF to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/avif-to-jpg","href":"/api-reference/converters/avif-to-jpg-converter"},{"title":"AVIF to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"AVIF to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/avif-to-png","href":"/api-reference/converters/avif-to-png-converter"},{"title":"BMP to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"BMP to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/bmp-to-jpg","href":"/api-reference/converters/bmp-to-jpg-converter"},{"title":"BMP to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"BMP to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/bmp-to-png","href":"/api-reference/converters/bmp-to-png-converter"},{"title":"GIF to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"GIF to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/gif-to-jpg","href":"/api-reference/converters/gif-to-jpg-converter"},{"title":"GIF to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"GIF to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/gif-to-png","href":"/api-reference/converters/gif-to-png-converter"},{"title":"HEIC to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"HEIC to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/heic-to-jpg","href":"/api-reference/converters/heic-to-jpg-converter"},{"title":"HEIC to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"HEIC to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/heic-to-png","href":"/api-reference/converters/heic-to-png-converter"},{"title":"JPG to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"JPG to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/jpg-to-png","href":"/api-reference/converters/jpg-to-png-converter"},{"title":"PNG to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"PNG to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/png-to-jpg","href":"/api-reference/converters/png-to-jpg-converter"},{"title":"SVG to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"SVG to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/svg-to-jpg","href":"/api-reference/converters/svg-to-jpg-converter"},{"title":"SVG to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"SVG to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/svg-to-png","href":"/api-reference/converters/svg-to-png-converter"},{"title":"TIFF to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"TIFF to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/tiff-to-jpg","href":"/api-reference/converters/tiff-to-jpg-converter"},{"title":"TIFF to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"TIFF to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/tiff-to-png","href":"/api-reference/converters/tiff-to-png-converter"},{"title":"WebP to JPG Converter API","deprecated":null,"version":null,"sidebarTitle":"WebP to JPG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/webp-to-jpg","href":"/api-reference/converters/webp-to-jpg-converter"},{"title":"WebP to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"WebP to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-converter/webp-to-png","href":"/api-reference/converters/webp-to-png-converter"},{"title":"INI to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"INI to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ini-to-json","href":"/api-reference/converters/ini-to-json-converter"},{"title":"INI to YAML Converter API","deprecated":null,"version":null,"sidebarTitle":"INI to YAML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ini-to-yaml-converter","href":"/api-reference/converters/ini-to-yaml-converter"},{"title":"Integer Base Converter API","deprecated":null,"version":null,"sidebarTitle":"Integer Base Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/integer-base-converter","href":"/api-reference/converters/integer-base-converter"},{"title":"IP Address to Hex Converter API","deprecated":null,"version":null,"sidebarTitle":"IP Address to Hex Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ip-address-to-hex-converter","href":"/api-reference/converters/ip-address-to-hex-converter"},{"title":"IPv4 Address Converter API","deprecated":null,"version":null,"sidebarTitle":"IPv4 Address Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv4-converter","href":"/api-reference/converters/ipv4-address-converter"},{"title":"IPv4 Range Expander API","deprecated":null,"version":null,"sidebarTitle":"IPv4 Range Expander","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv4-range-expander","href":"/api-reference/converters/ipv4-range-expander"},{"title":"Range List Tool API","deprecated":null,"version":null,"sidebarTitle":"Range List Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/range-list-tool","href":"/api-reference/converters/range-list-tool"},{"title":"IPv4 to IPv6 Converter API","deprecated":null,"version":null,"sidebarTitle":"IPv4 to IPv6 Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv4-to-ipv6-converter","href":"/api-reference/converters/ipv4-to-ipv6-converter"},{"title":"IPv6 Expander \u0026 Compressor API","deprecated":null,"version":null,"sidebarTitle":"IPv6 Expander \u0026 Compressor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv6-expander","href":"/api-reference/converters/ipv6-expander-\u0026-compressor"},{"title":"JSON Schema Generator API","deprecated":null,"version":null,"sidebarTitle":"JSON Schema Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-schema-generator","href":"/api-reference/converters/json-schema-generator"},{"title":"JSON Schema to Zod Schema Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON Schema to Zod Schema Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-schema-to-zod-schema-converter","href":"/api-reference/converters/json-schema-to-zod-schema-converter"},{"title":"JSON to GraphQL Types Generator API","deprecated":null,"version":null,"sidebarTitle":"JSON to GraphQL Types Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-graphql-types-generator","href":"/api-reference/converters/json-to-graphql-types-generator"},{"title":"JSON to HCL Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to HCL Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-hcl-converter","href":"/api-reference/converters/json-to-hcl-converter"},{"title":"JSON to HTML Table API","deprecated":null,"version":null,"sidebarTitle":"JSON to HTML Table","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-html-table","href":"/api-reference/converters/json-to-html-table"},{"title":"JSON to PHP Array Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to PHP Array Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-php-array-converter","href":"/api-reference/converters/json-to-php-array-converter"},{"title":"JSON to TOML Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to TOML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-toml-converter","href":"/api-reference/converters/json-to-toml-converter"},{"title":"TOML to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"TOML to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/toml-to-json-converter","href":"/api-reference/converters/toml-to-json-converter"},{"title":"TOML to YAML Converter API","deprecated":null,"version":null,"sidebarTitle":"TOML to YAML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/toml-to-yaml-converter","href":"/api-reference/converters/toml-to-yaml-converter"},{"title":"JSON to TypeScript Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to TypeScript Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-typescript-converter","href":"/api-reference/converters/json-to-typescript-converter"},{"title":"JSON to XML Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to XML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-xml","href":"/api-reference/converters/json-to-xml-converter"},{"title":"JSON to Zod Schema Generator API","deprecated":null,"version":null,"sidebarTitle":"JSON to Zod Schema Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-zod-schema-generator","href":"/api-reference/converters/json-to-zod-schema-generator"},{"title":"Julian Date Converter API","deprecated":null,"version":null,"sidebarTitle":"Julian Date Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/julian-date-converter","href":"/api-reference/converters/julian-date-converter"},{"title":"LAB to RGB Converter API","deprecated":null,"version":null,"sidebarTitle":"LAB to RGB Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lab-to-rgb-converter","href":"/api-reference/converters/lab-to-rgb-converter"},{"title":"JSON to CSV Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to CSV Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-csv-converter","href":"/api-reference/converters/json-to-csv-converter"},{"title":"JSON to YAML Converter API","deprecated":null,"version":null,"sidebarTitle":"JSON to YAML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-to-yaml-converter","href":"/api-reference/converters/json-to-yaml-converter"},{"title":"Length Converter API","deprecated":null,"version":null,"sidebarTitle":"Length Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/length-converter","href":"/api-reference/converters/length-converter"},{"title":"Letter to Number Converter API","deprecated":null,"version":null,"sidebarTitle":"Letter to Number Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/letter-to-number-converter","href":"/api-reference/converters/letter-to-number-converter"},{"title":"Leet Speak Converter API","deprecated":null,"version":null,"sidebarTitle":"Leet Speak Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/leet-speak-converter","href":"/api-reference/converters/leet-speak-converter"},{"title":"List Converter API","deprecated":null,"version":null,"sidebarTitle":"List Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/list-converter","href":"/api-reference/converters/list-converter"},{"title":"Luminance \u0026 Illuminance Converter API","deprecated":null,"version":null,"sidebarTitle":"Luminance \u0026 Illuminance Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/luminance-illuminance-converter","href":"/api-reference/converters/luminance-\u0026-illuminance-converter"},{"title":"Markdown to Slack Converter API","deprecated":null,"version":null,"sidebarTitle":"Markdown to Slack Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-to-slack-converter","href":"/api-reference/converters/markdown-to-slack-converter"},{"title":"Military Time Converter API","deprecated":null,"version":null,"sidebarTitle":"Military Time Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/military-time-converter","href":"/api-reference/converters/military-time-converter"},{"title":"MJML to Responsive Email HTML Converter API","deprecated":null,"version":null,"sidebarTitle":"MJML to Responsive Email HTML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mjml-to-responsive-email-html-converter","href":"/api-reference/converters/mjml-to-responsive-email-html-converter"},{"title":"MO to PO Converter API","deprecated":null,"version":null,"sidebarTitle":"MO to PO Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mo-to-po","href":"/api-reference/converters/mo-to-po-converter"},{"title":"Morse Code Translator API","deprecated":null,"version":null,"sidebarTitle":"Morse Code Translator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/morse-code-translator","href":"/api-reference/converters/morse-code-translator"},{"title":"MessagePack to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"MessagePack to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/msgpack-to-json-converter","href":"/api-reference/converters/messagepack-to-json-converter"},{"title":"Musical Interval Converter API","deprecated":null,"version":null,"sidebarTitle":"Musical Interval Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/musical-interval-converter","href":"/api-reference/converters/musical-interval-converter"},{"title":"Musical Note Frequency Generator API","deprecated":null,"version":null,"sidebarTitle":"Musical Note Frequency Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/musical-note-frequency-generator","href":"/api-reference/converters/musical-note-frequency-generator"},{"title":"NATO Phonetic Alphabet Converter API","deprecated":null,"version":null,"sidebarTitle":"NATO Phonetic Alphabet Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nato-phonetic-alphabet","href":"/api-reference/converters/nato-phonetic-alphabet-converter"},{"title":"Network Speed Unit Converter API","deprecated":null,"version":null,"sidebarTitle":"Network Speed Unit Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/network-speed-unit-converter","href":"/api-reference/converters/network-speed-unit-converter"},{"title":"Number Notation Converter API","deprecated":null,"version":null,"sidebarTitle":"Number Notation Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/number-notation-converter","href":"/api-reference/converters/number-notation-converter"},{"title":"Number to Words Converter API","deprecated":null,"version":null,"sidebarTitle":"Number to Words Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/number-to-words","href":"/api-reference/converters/number-to-words-converter"},{"title":"OpenAPI Schema to TypeScript Types Converter API","deprecated":null,"version":null,"sidebarTitle":"OpenAPI Schema to TypeScript Types Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/openapi-to-typescript-converter","href":"/api-reference/converters/openapi-schema-to-typescript-types-converter"},{"title":"OpenAPI v2 to v3 Converter API","deprecated":null,"version":null,"sidebarTitle":"OpenAPI v2 to v3 Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/openapi-v2-to-v3-converter","href":"/api-reference/converters/openapi-v2-to-v3-converter"},{"title":"Paper Size Converter API","deprecated":null,"version":null,"sidebarTitle":"Paper Size Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/paper-size-converter","href":"/api-reference/converters/paper-size-converter"},{"title":"Pages to PDF Converter API","deprecated":null,"version":null,"sidebarTitle":"Pages to PDF Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/pages-to-pdf","href":"/api-reference/converters/pages-to-pdf-converter"},{"title":"CSV to PDF API","deprecated":null,"version":null,"sidebarTitle":"CSV to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/csv-to-pdf","href":"/api-reference/converters/csv-to-pdf"},{"title":"ZIP to PDF API","deprecated":null,"version":null,"sidebarTitle":"ZIP to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/zip-to-pdf","href":"/api-reference/converters/zip-to-pdf"},{"title":"HTML to PDF API","deprecated":null,"version":null,"sidebarTitle":"HTML to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/html-to-pdf","href":"/api-reference/converters/html-to-pdf"},{"title":"TXT to PDF API","deprecated":null,"version":null,"sidebarTitle":"TXT to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/txt-to-pdf","href":"/api-reference/converters/txt-to-pdf"},{"title":"RTF to PDF API","deprecated":null,"version":null,"sidebarTitle":"RTF to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/rtf-to-pdf","href":"/api-reference/converters/rtf-to-pdf"},{"title":"MSG to PDF API","deprecated":null,"version":null,"sidebarTitle":"MSG to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/msg-to-pdf","href":"/api-reference/converters/msg-to-pdf"},{"title":"URL to PDF API","deprecated":null,"version":null,"sidebarTitle":"URL to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/url-to-pdf","href":"/api-reference/converters/url-to-pdf"},{"title":"Image to PDF API","deprecated":null,"version":null,"sidebarTitle":"Image to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/image-to-pdf","href":"/api-reference/converters/image-to-pdf"},{"title":"Markdown to PDF API","deprecated":null,"version":null,"sidebarTitle":"Markdown to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/markdown-to-pdf","href":"/api-reference/converters/markdown-to-pdf"},{"title":"GIF to PDF API","deprecated":null,"version":null,"sidebarTitle":"GIF to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/gif-to-pdf","href":"/api-reference/converters/gif-to-pdf"},{"title":"WEBP to PDF API","deprecated":null,"version":null,"sidebarTitle":"WEBP to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/webp-to-pdf","href":"/api-reference/converters/webp-to-pdf"},{"title":"SVG to PDF API","deprecated":null,"version":null,"sidebarTitle":"SVG to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/svg-to-pdf","href":"/api-reference/converters/svg-to-pdf"},{"title":"HEIC to PDF API","deprecated":null,"version":null,"sidebarTitle":"HEIC to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-converter/heic-to-pdf","href":"/api-reference/converters/heic-to-pdf"},{"title":"Phone Number Parser \u0026 Formatter API","deprecated":null,"version":null,"sidebarTitle":"Phone Number Parser \u0026 Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/phone-number-parser-and-formatter","href":"/api-reference/converters/phone-number-parser-\u0026-formatter"},{"title":"PHP Array to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"PHP Array to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/php-array-to-json","href":"/api-reference/converters/php-array-to-json-converter"},{"title":"PHP Deserializer API","deprecated":null,"version":null,"sidebarTitle":"PHP Deserializer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/php-deserializer","href":"/api-reference/converters/php-deserializer"},{"title":"Pig Latin Translator API","deprecated":null,"version":null,"sidebarTitle":"Pig Latin Translator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pig-latin-translator","href":"/api-reference/converters/pig-latin-translator"},{"title":"Pixel, REM \u0026 EM Converter API","deprecated":null,"version":null,"sidebarTitle":"Pixel, REM \u0026 EM Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pixel-rem-em-converter","href":"/api-reference/converters/pixel-rem-\u0026-em-converter"},{"title":"Playfair Cipher API","deprecated":null,"version":null,"sidebarTitle":"Playfair Cipher","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/playfair-cipher","href":"/api-reference/converters/playfair-cipher"},{"title":"Plus Code (Open Location Code) Converter API","deprecated":null,"version":null,"sidebarTitle":"Plus Code (Open Location Code) Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/plus-code-converter","href":"/api-reference/converters/plus-code-open-location-code-converter"},{"title":"PO to MO Converter API","deprecated":null,"version":null,"sidebarTitle":"PO to MO Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/po-to-mo","href":"/api-reference/converters/po-to-mo-converter"},{"title":"Print Typography Units Converter API","deprecated":null,"version":null,"sidebarTitle":"Print Typography Units Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/print-typography-units-converter","href":"/api-reference/converters/print-typography-units-converter"},{"title":"Protobuf Text ↔ JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"Protobuf Text ↔ JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/protobuf-text-json-converter","href":"/api-reference/converters/protobuf-text-↔-json-converter"},{"title":"Punycode Converter API","deprecated":null,"version":null,"sidebarTitle":"Punycode Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/punycode-converter","href":"/api-reference/converters/punycode-converter"},{"title":"String Obfuscator API","deprecated":null,"version":null,"sidebarTitle":"String Obfuscator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/string-obfuscator","href":"/api-reference/converters/string-obfuscator"},{"title":"Power Converter API","deprecated":null,"version":null,"sidebarTitle":"Power Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/power-converter","href":"/api-reference/converters/power-converter"},{"title":"Pressure Converter API","deprecated":null,"version":null,"sidebarTitle":"Pressure Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pressure-converter","href":"/api-reference/converters/pressure-converter"},{"title":"Markdown to HTML Converter API","deprecated":null,"version":null,"sidebarTitle":"Markdown to HTML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-to-html","href":"/api-reference/converters/markdown-to-html-converter"},{"title":"Markdown to AsciiDoc Converter API","deprecated":null,"version":null,"sidebarTitle":"Markdown to AsciiDoc Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-to-asciidoc","href":"/api-reference/converters/markdown-to-asciidoc-converter"},{"title":"Speed Converter API","deprecated":null,"version":null,"sidebarTitle":"Speed Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/speed-converter","href":"/api-reference/converters/speed-converter"},{"title":"Text to Hex Converter API","deprecated":null,"version":null,"sidebarTitle":"Text to Hex Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-to-hex","href":"/api-reference/converters/text-to-hex-converter"},{"title":"Regex Converter API","deprecated":null,"version":null,"sidebarTitle":"Regex Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/regex-converter","href":"/api-reference/converters/regex-converter"},{"title":"RGB to CMYK Converter API","deprecated":null,"version":null,"sidebarTitle":"RGB to CMYK Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rgb-to-cmyk","href":"/api-reference/converters/rgb-to-cmyk-converter"},{"title":"ROT13 Encoder / Decoder API","deprecated":null,"version":null,"sidebarTitle":"ROT13 Encoder / Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rot13","href":"/api-reference/converters/rot13-encoder-decoder"},{"title":"Scientific Notation Converter API","deprecated":null,"version":null,"sidebarTitle":"Scientific Notation Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/scientific-notation-converter","href":"/api-reference/converters/scientific-notation-converter"},{"title":"RGBA to HEX Converter API","deprecated":null,"version":null,"sidebarTitle":"RGBA to HEX Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rgba-to-hex-converter","href":"/api-reference/converters/rgba-to-hex-converter"},{"title":"Roman Numeral Converter API","deprecated":null,"version":null,"sidebarTitle":"Roman Numeral Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/roman-numeral-converter","href":"/api-reference/converters/roman-numeral-converter"},{"title":"SQL Escape API","deprecated":null,"version":null,"sidebarTitle":"SQL Escape","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sql-escape","href":"/api-reference/converters/sql-escape"},{"title":"SVG to Base64 Encode API","deprecated":null,"version":null,"sidebarTitle":"SVG to Base64 Encode","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-to-base64-encode","href":"/api-reference/converters/svg-to-base64-encode"},{"title":"Temperature Converter API","deprecated":null,"version":null,"sidebarTitle":"Temperature Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/temperature-converter","href":"/api-reference/converters/temperature-converter"},{"title":"Text to Base64 Encode API","deprecated":null,"version":null,"sidebarTitle":"Text to Base64 Encode","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-to-base64-encode","href":"/api-reference/converters/text-to-base64-encode"},{"title":"Text to Handwriting Converter API","deprecated":null,"version":null,"sidebarTitle":"Text to Handwriting Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-to-handwriting-converter","href":"/api-reference/converters/text-to-handwriting-converter"},{"title":"Timezone Converter API","deprecated":null,"version":null,"sidebarTitle":"Timezone Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/timezone-converter","href":"/api-reference/converters/timezone-converter"},{"title":"Torque Converter API","deprecated":null,"version":null,"sidebarTitle":"Torque Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/torque-converter","href":"/api-reference/converters/torque-converter"},{"title":"Unicode Text Normalizer API","deprecated":null,"version":null,"sidebarTitle":"Unicode Text Normalizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unicode-text-normalizer","href":"/api-reference/converters/unicode-text-normalizer"},{"title":"Unicode to HTML Entities Converter API","deprecated":null,"version":null,"sidebarTitle":"Unicode to HTML Entities Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unicode-to-html-entities","href":"/api-reference/converters/unicode-to-html-entities-converter"},{"title":"Universal Decoder API","deprecated":null,"version":null,"sidebarTitle":"Universal Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/universal-decoder","href":"/api-reference/converters/universal-decoder"},{"title":"Universal Encoder API","deprecated":null,"version":null,"sidebarTitle":"Universal Encoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/universal-encoder","href":"/api-reference/converters/universal-encoder"},{"title":"Unix Timestamp Converter API","deprecated":null,"version":null,"sidebarTitle":"Unix Timestamp Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unix-timestamp-converter","href":"/api-reference/converters/unix-timestamp-converter"},{"title":"Unit Converter API","deprecated":null,"version":null,"sidebarTitle":"Unit Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unit-converter","href":"/api-reference/converters/unit-converter"},{"title":"Upside Down Text Generator API","deprecated":null,"version":null,"sidebarTitle":"Upside Down Text Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/upside-down-text","href":"/api-reference/converters/upside-down-text-generator"},{"title":"URL Encoder / Decoder API","deprecated":null,"version":null,"sidebarTitle":"URL Encoder / Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-encoder-decoder","href":"/api-reference/converters/url-encoder-decoder"},{"title":"URL to HTML API","deprecated":null,"version":null,"sidebarTitle":"URL to HTML","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-html","href":"/api-reference/converters/url-to-html"},{"title":"URL to Image API","deprecated":null,"version":null,"sidebarTitle":"URL to Image","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-image","href":"/api-reference/converters/url-to-image"},{"title":"URL to JSON API","deprecated":null,"version":null,"sidebarTitle":"URL to JSON","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-json","href":"/api-reference/converters/url-to-json"},{"title":"URL to Markdown API","deprecated":null,"version":null,"sidebarTitle":"URL to Markdown","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-markdown","href":"/api-reference/converters/url-to-markdown"},{"title":"URL to Text API","deprecated":null,"version":null,"sidebarTitle":"URL to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-text","href":"/api-reference/converters/url-to-text"},{"title":"URL to XML API","deprecated":null,"version":null,"sidebarTitle":"URL to XML","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-xml","href":"/api-reference/converters/url-to-xml"},{"title":"VCF (vCard) to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"VCF (vCard) to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vcf-vcard-to-json-converter","href":"/api-reference/converters/vcf-vcard-to-json-converter"},{"title":"Vigenère Cipher API","deprecated":null,"version":null,"sidebarTitle":"Vigenère Cipher","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vigenere-cipher","href":"/api-reference/converters/vigenère-cipher"},{"title":"Voltage Converter API","deprecated":null,"version":null,"sidebarTitle":"Voltage Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/voltage-converter","href":"/api-reference/converters/voltage-converter"},{"title":"WBMP to PNG Converter API","deprecated":null,"version":null,"sidebarTitle":"WBMP to PNG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wbmp-to-png","href":"/api-reference/converters/wbmp-to-png-converter"},{"title":"XML to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"XML to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-to-json-converter","href":"/api-reference/converters/xml-to-json-converter"},{"title":"Volume Converter API","deprecated":null,"version":null,"sidebarTitle":"Volume Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/volume-converter","href":"/api-reference/converters/volume-converter"},{"title":"Weight Converter API","deprecated":null,"version":null,"sidebarTitle":"Weight Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/weight-converter","href":"/api-reference/converters/weight-converter"},{"title":"YAML to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"YAML to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-to-json-converter","href":"/api-reference/converters/yaml-to-json-converter"},{"title":"YAML to TOML Converter API","deprecated":null,"version":null,"sidebarTitle":"YAML to TOML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-to-toml-converter","href":"/api-reference/converters/yaml-to-toml-converter"},{"title":"YAML to XML Converter API","deprecated":null,"version":null,"sidebarTitle":"YAML to XML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-to-xml","href":"/api-reference/converters/yaml-to-xml-converter"},{"title":"YouTube to Text API","deprecated":null,"version":null,"sidebarTitle":"YouTube to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/youtube-to-text","href":"/api-reference/converters/youtube-to-text"},{"title":"Vimeo to Text API","deprecated":null,"version":null,"sidebarTitle":"Vimeo to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vimeo-to-text","href":"/api-reference/converters/vimeo-to-text"},{"title":"Spotify to Text API","deprecated":null,"version":null,"sidebarTitle":"Spotify to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/spotify-to-text","href":"/api-reference/converters/spotify-to-text"},{"title":"TikTok to Text API","deprecated":null,"version":null,"sidebarTitle":"TikTok to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tiktok-to-text","href":"/api-reference/converters/tiktok-to-text"},{"title":"X (Twitter) Video to Text API","deprecated":null,"version":null,"sidebarTitle":"X (Twitter) Video to Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/x-to-text","href":"/api-reference/converters/x-twitter-video-to-text"},{"title":"Butter to Oil Converter API","deprecated":null,"version":null,"sidebarTitle":"Butter to Oil Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/butter-to-oil-converter","href":"/api-reference/converters/butter-to-oil-converter"},{"title":"Text to Unicode Converter API","deprecated":null,"version":null,"sidebarTitle":"Text to Unicode Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-to-unicode-converter","href":"/api-reference/converters/text-to-unicode-converter"},{"title":"Tab to Space Converter API","deprecated":null,"version":null,"sidebarTitle":"Tab to Space Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tab-to-space-converter","href":"/api-reference/converters/tab-to-space-converter"},{"title":"Space to Tab Converter API","deprecated":null,"version":null,"sidebarTitle":"Space to Tab Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/space-to-tab-converter","href":"/api-reference/converters/space-to-tab-converter"},{"title":"Sort List API","deprecated":null,"version":null,"sidebarTitle":"Sort List","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sort-list","href":"/api-reference/converters/sort-list"},{"title":"Reverse List API","deprecated":null,"version":null,"sidebarTitle":"Reverse List","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/reverse-list","href":"/api-reference/converters/reverse-list"},{"title":"Text to ASCII Binary API","deprecated":null,"version":null,"sidebarTitle":"Text to ASCII Binary","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-to-ascii-binary","href":"/api-reference/converters/text-to-ascii-binary"},{"title":"Shoe \u0026 Clothing Size Converter API","deprecated":null,"version":null,"sidebarTitle":"Shoe \u0026 Clothing Size Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/shoe-clothing-size-converter","href":"/api-reference/converters/shoe-\u0026-clothing-size-converter"},{"title":"Small Caps Generator API","deprecated":null,"version":null,"sidebarTitle":"Small Caps Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/small-caps-generator","href":"/api-reference/converters/small-caps-generator"},{"title":"SQL Parameterizer API","deprecated":null,"version":null,"sidebarTitle":"SQL Parameterizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sql-parameterizer","href":"/api-reference/converters/sql-parameterizer"},{"title":"SVG Stroke to Fill Converter API","deprecated":null,"version":null,"sidebarTitle":"SVG Stroke to Fill Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-stroke-to-fill-converter","href":"/api-reference/converters/svg-stroke-to-fill-converter"},{"title":"SVG to CSS Shape Converter API","deprecated":null,"version":null,"sidebarTitle":"SVG to CSS Shape Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-to-css-shape-converter","href":"/api-reference/converters/svg-to-css-shape-converter"},{"title":"SVG to JSX Converter API","deprecated":null,"version":null,"sidebarTitle":"SVG to JSX Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-to-jsx-converter","href":"/api-reference/converters/svg-to-jsx-converter"},{"title":"SVGZ to SVG Converter API","deprecated":null,"version":null,"sidebarTitle":"SVGZ to SVG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svgz-to-svg","href":"/api-reference/converters/svgz-to-svg-converter"},{"title":"Table to Markdown Converter API","deprecated":null,"version":null,"sidebarTitle":"Table to Markdown Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/table-to-markdown-converter","href":"/api-reference/converters/table-to-markdown-converter"},{"title":"Tailwind Classes to CSS API","deprecated":null,"version":null,"sidebarTitle":"Tailwind Classes to CSS","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tailwind-classes-to-css","href":"/api-reference/converters/tailwind-classes-to-css"},{"title":"Tailwind CSS v3 Config to v4 Migrator API","deprecated":null,"version":null,"sidebarTitle":"Tailwind CSS v3 Config to v4 Migrator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tailwind-v3-to-v4-config-migrator","href":"/api-reference/converters/tailwind-css-v3-config-to-v4-migrator"},{"title":"Textile Yarn Converter API","deprecated":null,"version":null,"sidebarTitle":"Textile Yarn Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/textile-yarn-converter","href":"/api-reference/converters/textile-yarn-converter"},{"title":"TSV to JSON Converter API","deprecated":null,"version":null,"sidebarTitle":"TSV to JSON Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tsv-to-json","href":"/api-reference/converters/tsv-to-json-converter"},{"title":"TypeScript Type Stripper API","deprecated":null,"version":null,"sidebarTitle":"TypeScript Type Stripper","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/typescript-type-stripper","href":"/api-reference/converters/typescript-type-stripper"},{"title":"Unified Color Space Converter API","deprecated":null,"version":null,"sidebarTitle":"Unified Color Space Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unified-color-space-converter","href":"/api-reference/converters/unified-color-space-converter"},{"title":"Knitting Needle Size Converter API","deprecated":null,"version":null,"sidebarTitle":"Knitting Needle Size Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/knitting-needle-size-converter","href":"/api-reference/converters/knitting-needle-size-converter"},{"title":"XML to CSV Converter API","deprecated":null,"version":null,"sidebarTitle":"XML to CSV Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-to-csv-converter","href":"/api-reference/converters/xml-to-csv-converter"},{"title":"XML to YAML Converter API","deprecated":null,"version":null,"sidebarTitle":"XML to YAML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-to-yaml-converter","href":"/api-reference/converters/xml-to-yaml-converter"},{"title":"TIFF to PDF API","deprecated":null,"version":null,"sidebarTitle":"TIFF to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tiff-to-pdf","href":"/api-reference/converters/tiff-to-pdf"},{"title":"JavaScript Source Map Decoder API","deprecated":null,"version":null,"sidebarTitle":"JavaScript Source Map Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/source-map-decoder","href":"/api-reference/converters/javascript-source-map-decoder"},{"title":"PSD to PNG API","deprecated":null,"version":null,"sidebarTitle":"PSD to PNG","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/psd-to-png","href":"/api-reference/converters/psd-to-png"},{"title":"PSD to JPG API","deprecated":null,"version":null,"sidebarTitle":"PSD to JPG","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/psd-to-jpg","href":"/api-reference/converters/psd-to-jpg"},{"title":"PSD to PDF API","deprecated":null,"version":null,"sidebarTitle":"PSD to PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/psd-to-pdf","href":"/api-reference/converters/psd-to-pdf"},{"title":"PSD to AI API","deprecated":null,"version":null,"sidebarTitle":"PSD to AI","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/psd-to-ai","href":"/api-reference/converters/psd-to-ai"},{"title":"PSD to SVG API","deprecated":null,"version":null,"sidebarTitle":"PSD to SVG","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/psd-to-svg","href":"/api-reference/converters/psd-to-svg"},{"title":"TIFF to SVG Converter API","deprecated":null,"version":null,"sidebarTitle":"TIFF to SVG Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tiff-to-svg","href":"/api-reference/converters/tiff-to-svg-converter"},{"title":"Polar to Cartesian Converter API","deprecated":null,"version":null,"sidebarTitle":"Polar to Cartesian Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/polar-to-cartesian-converter","href":"/api-reference/converters/polar-to-cartesian-converter"},{"title":"OPML Converter API","deprecated":null,"version":null,"sidebarTitle":"OPML Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/opml-converter","href":"/api-reference/converters/opml-converter"},{"title":"Cartesian to Polar Converter API","deprecated":null,"version":null,"sidebarTitle":"Cartesian to Polar Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cartesian-to-polar-converter","href":"/api-reference/converters/cartesian-to-polar-converter"}]},{"group":"Formatters","pages":[{"title":"Access Log Formatter API","deprecated":null,"version":null,"sidebarTitle":"Access Log Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/access-log-formatter","href":"/api-reference/formatters/access-log-formatter"},{"title":"ANSI Escape Stripper API","deprecated":null,"version":null,"sidebarTitle":"ANSI Escape Stripper","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ansi-escape-stripper","href":"/api-reference/formatters/ansi-escape-stripper"},{"title":"Ansible Playbook YAML Formatter API","deprecated":null,"version":null,"sidebarTitle":"Ansible Playbook YAML Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ansible-playbook-yaml-formatter","href":"/api-reference/formatters/ansible-playbook-yaml-formatter"},{"title":"Apache Avro Schema Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"Apache Avro Schema Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/apache-avro-schema-formatter-validator","href":"/api-reference/formatters/apache-avro-schema-formatter-\u0026-validator"},{"title":"Apache httpd Config Formatter API","deprecated":null,"version":null,"sidebarTitle":"Apache httpd Config Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/apache-httpd-config-formatter","href":"/api-reference/formatters/apache-httpd-config-formatter"},{"title":"Bicep Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"Bicep Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bicep-formatter-validator","href":"/api-reference/formatters/bicep-formatter-\u0026-validator"},{"title":"Code Syntax Highlighter API","deprecated":null,"version":null,"sidebarTitle":"Code Syntax Highlighter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/code-syntax-highlighter","href":"/api-reference/formatters/code-syntax-highlighter"},{"title":"Conventional Commit Message Formatter API","deprecated":null,"version":null,"sidebarTitle":"Conventional Commit Message Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/conventional-commit-message-formatter","href":"/api-reference/formatters/conventional-commit-message-formatter"},{"title":"C++ Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"C++ Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cpp-code-formatter","href":"/api-reference/formatters/c++-code-formatter"},{"title":"CSS Email Inliner API","deprecated":null,"version":null,"sidebarTitle":"CSS Email Inliner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-email-inliner","href":"/api-reference/formatters/css-email-inliner"},{"title":"CSS Minifier \u0026 Beautifier API","deprecated":null,"version":null,"sidebarTitle":"CSS Minifier \u0026 Beautifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-minifier-beautifier","href":"/api-reference/formatters/css-minifier-\u0026-beautifier"},{"title":"CSV Escape / Unescape API","deprecated":null,"version":null,"sidebarTitle":"CSV Escape / Unescape","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-escape-unescape","href":"/api-reference/formatters/csv-escape-unescape"},{"title":"CSV Formatter API","deprecated":null,"version":null,"sidebarTitle":"CSV Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-formatter","href":"/api-reference/formatters/csv-formatter"},{"title":"CUE Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"CUE Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cue-formatter-validator","href":"/api-reference/formatters/cue-formatter-\u0026-validator"},{"title":"Dart Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Dart Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dart-code-formatter","href":"/api-reference/formatters/dart-code-formatter"},{"title":"Docker Compose YAML Formatter API","deprecated":null,"version":null,"sidebarTitle":"Docker Compose YAML Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/docker-compose-yaml-formatter","href":"/api-reference/formatters/docker-compose-yaml-formatter"},{"title":"Elixir Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Elixir Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/elixir-code-formatter","href":"/api-reference/formatters/elixir-code-formatter"},{"title":"Env File Parser API","deprecated":null,"version":null,"sidebarTitle":"Env File Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/env-file-parser","href":"/api-reference/formatters/env-file-parser"},{"title":"Git Log Formatter / Prettifier API","deprecated":null,"version":null,"sidebarTitle":"Git Log Formatter / Prettifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/git-log-formatter-prettifier","href":"/api-reference/formatters/git-log-formatter-prettifier"},{"title":"Go Formatter API","deprecated":null,"version":null,"sidebarTitle":"Go Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/go-formatter","href":"/api-reference/formatters/go-formatter"},{"title":"HAR File Formatter API","deprecated":null,"version":null,"sidebarTitle":"HAR File Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/har-file-formatter","href":"/api-reference/formatters/har-file-formatter"},{"title":".htaccess Formatter API","deprecated":null,"version":null,"sidebarTitle":".htaccess Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/htaccess-formatter","href":"/api-reference/formatters/htaccess-formatter"},{"title":"HJSON Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"HJSON Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hjson-formatter-validator","href":"/api-reference/formatters/hjson-formatter-\u0026-validator"},{"title":"HTML Formatter \u0026 Beautifier API","deprecated":null,"version":null,"sidebarTitle":"HTML Formatter \u0026 Beautifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-formatter-beautifier","href":"/api-reference/formatters/html-formatter-\u0026-beautifier"},{"title":"HTML Minifier API","deprecated":null,"version":null,"sidebarTitle":"HTML Minifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-minifier","href":"/api-reference/formatters/html-minifier"},{"title":"INI Formatter API","deprecated":null,"version":null,"sidebarTitle":"INI Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ini-formatter","href":"/api-reference/formatters/ini-formatter"},{"title":"Java Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Java Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/java-code-formatter","href":"/api-reference/formatters/java-code-formatter"},{"title":"Java / .NET String Escape API","deprecated":null,"version":null,"sidebarTitle":"Java / .NET String Escape","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/java-dotnet-string-escape","href":"/api-reference/formatters/java-net-string-escape"},{"title":"Java .properties File Formatter API","deprecated":null,"version":null,"sidebarTitle":"Java .properties File Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/java-properties-file-formatter","href":"/api-reference/formatters/java-properties-file-formatter"},{"title":"JavaScript Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"JavaScript Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/javascript-code-formatter","href":"/api-reference/formatters/javascript-code-formatter"},{"title":"JavaScript Escape / Unescape API","deprecated":null,"version":null,"sidebarTitle":"JavaScript Escape / Unescape","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/javascript-escape-unescape","href":"/api-reference/formatters/javascript-escape-unescape"},{"title":"JavaScript Minifier API","deprecated":null,"version":null,"sidebarTitle":"JavaScript Minifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/javascript-minifier","href":"/api-reference/formatters/javascript-minifier"},{"title":"JSON Escape / Unescape API","deprecated":null,"version":null,"sidebarTitle":"JSON Escape / Unescape","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-escape-unescape","href":"/api-reference/formatters/json-escape-unescape"},{"title":"JSON Flattener API","deprecated":null,"version":null,"sidebarTitle":"JSON Flattener","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-flattener","href":"/api-reference/formatters/json-flattener"},{"title":"JSON Schema Validator API","deprecated":null,"version":null,"sidebarTitle":"JSON Schema Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-schema-validator","href":"/api-reference/formatters/json-schema-validator"},{"title":"JSON-LD Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"JSON-LD Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-ld-formatter-validator","href":"/api-reference/formatters/json-ld-formatter-\u0026-validator"},{"title":"GraphQL Schema Formatter API","deprecated":null,"version":null,"sidebarTitle":"GraphQL Schema Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/graphql-schema-formatter","href":"/api-reference/formatters/graphql-schema-formatter"},{"title":"TOML Formatter API","deprecated":null,"version":null,"sidebarTitle":"TOML Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/toml-formatter","href":"/api-reference/formatters/toml-formatter"},{"title":"TypeScript Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"TypeScript Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/typescript-formatter","href":"/api-reference/formatters/typescript-code-formatter"},{"title":"Julia Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Julia Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/julia-code-formatter","href":"/api-reference/formatters/julia-code-formatter"},{"title":"Kotlin Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Kotlin Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/kotlin-code-formatter","href":"/api-reference/formatters/kotlin-code-formatter"},{"title":"Kubernetes YAML Formatter API","deprecated":null,"version":null,"sidebarTitle":"Kubernetes YAML Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/kubernetes-yaml-formatter","href":"/api-reference/formatters/kubernetes-yaml-formatter"},{"title":"JSON Formatter API","deprecated":null,"version":null,"sidebarTitle":"JSON Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-formatter","href":"/api-reference/formatters/json-formatter"},{"title":"JSON5 Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"JSON5 Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json5-formatter-validator","href":"/api-reference/formatters/json5-formatter-\u0026-validator"},{"title":"Jsonnet Formatter \u0026 Evaluator API","deprecated":null,"version":null,"sidebarTitle":"Jsonnet Formatter \u0026 Evaluator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jsonnet-formatter-evaluator","href":"/api-reference/formatters/jsonnet-formatter-\u0026-evaluator"},{"title":"JSON Minifier API","deprecated":null,"version":null,"sidebarTitle":"JSON Minifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-minifier","href":"/api-reference/formatters/json-minifier"},{"title":"Line Affixer API","deprecated":null,"version":null,"sidebarTitle":"Line Affixer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/line-affixer","href":"/api-reference/formatters/line-affixer"},{"title":"Lua Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Lua Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lua-code-formatter","href":"/api-reference/formatters/lua-code-formatter"},{"title":"Makefile Formatter API","deprecated":null,"version":null,"sidebarTitle":"Makefile Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/makefile-formatter","href":"/api-reference/formatters/makefile-formatter"},{"title":"Markdown Table Formatter API","deprecated":null,"version":null,"sidebarTitle":"Markdown Table Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-table-formatter","href":"/api-reference/formatters/markdown-table-formatter"},{"title":"NDJSON Formatter \u0026 Validator API","deprecated":null,"version":null,"sidebarTitle":"NDJSON Formatter \u0026 Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ndjson-formatter-validator","href":"/api-reference/formatters/ndjson-formatter-\u0026-validator"},{"title":"Nginx Config Formatter API","deprecated":null,"version":null,"sidebarTitle":"Nginx Config Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nginx-formatter","href":"/api-reference/formatters/nginx-config-formatter"},{"title":"OpenAPI / Swagger Validator API","deprecated":null,"version":null,"sidebarTitle":"OpenAPI / Swagger Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/openapi-swagger-validator","href":"/api-reference/formatters/openapi-swagger-validator"},{"title":"package.json Formatter \u0026 Key Sorter API","deprecated":null,"version":null,"sidebarTitle":"package.json Formatter \u0026 Key Sorter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/package-json-formatter-key-sorter","href":"/api-reference/formatters/packagejson-formatter-\u0026-key-sorter"},{"title":"PHP Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"PHP Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/php-code-formatter","href":"/api-reference/formatters/php-code-formatter"},{"title":"Prisma Schema Formatter API","deprecated":null,"version":null,"sidebarTitle":"Prisma Schema Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/prisma-schema-formatter","href":"/api-reference/formatters/prisma-schema-formatter"},{"title":"PromQL Formatter API","deprecated":null,"version":null,"sidebarTitle":"PromQL Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/promql-formatter","href":"/api-reference/formatters/promql-formatter"},{"title":"Protobuf Formatter API","deprecated":null,"version":null,"sidebarTitle":"Protobuf Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/protobuf-formatter","href":"/api-reference/formatters/protobuf-formatter"},{"title":"Python Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Python Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/python-code-formatter","href":"/api-reference/formatters/python-code-formatter"},{"title":"SVG Optimizer API","deprecated":null,"version":null,"sidebarTitle":"SVG Optimizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-optimizer","href":"/api-reference/formatters/svg-optimizer"},{"title":"Reverse Text API","deprecated":null,"version":null,"sidebarTitle":"Reverse Text","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/reverse-text","href":"/api-reference/formatters/reverse-text"},{"title":"Ruby Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Ruby Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ruby-code-formatter","href":"/api-reference/formatters/ruby-code-formatter"},{"title":"Rust Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Rust Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rust-code-formatter","href":"/api-reference/formatters/rust-code-formatter"},{"title":"Scala Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Scala Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/scala-code-formatter","href":"/api-reference/formatters/scala-code-formatter"},{"title":"SCSS Formatter API","deprecated":null,"version":null,"sidebarTitle":"SCSS Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/scss-formatter","href":"/api-reference/formatters/scss-formatter"},{"title":"SQL Formatter API","deprecated":null,"version":null,"sidebarTitle":"SQL Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sql-formatter","href":"/api-reference/formatters/sql-formatter"},{"title":"SQL Minifier API","deprecated":null,"version":null,"sidebarTitle":"SQL Minifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sql-minifier","href":"/api-reference/formatters/sql-minifier"},{"title":"Terraform Formatter API","deprecated":null,"version":null,"sidebarTitle":"Terraform Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/terraform-formatter","href":"/api-reference/formatters/terraform-formatter"},{"title":"XML Escape / Unescape API","deprecated":null,"version":null,"sidebarTitle":"XML Escape / Unescape","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-escape-unescape","href":"/api-reference/formatters/xml-escape-unescape"},{"title":"XML Validator API","deprecated":null,"version":null,"sidebarTitle":"XML Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-validator","href":"/api-reference/formatters/xml-validator"},{"title":"XSL Transformer API","deprecated":null,"version":null,"sidebarTitle":"XSL Transformer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xsl-transformer","href":"/api-reference/formatters/xsl-transformer"},{"title":"YAML Formatter API","deprecated":null,"version":null,"sidebarTitle":"YAML Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-formatter","href":"/api-reference/formatters/yaml-formatter"},{"title":"YAML Validator API","deprecated":null,"version":null,"sidebarTitle":"YAML Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-validator","href":"/api-reference/formatters/yaml-validator"},{"title":"YAML Viewer API","deprecated":null,"version":null,"sidebarTitle":"YAML Viewer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-viewer","href":"/api-reference/formatters/yaml-viewer"},{"title":"XML Formatter API","deprecated":null,"version":null,"sidebarTitle":"XML Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-formatter","href":"/api-reference/formatters/xml-formatter"},{"title":"Zig Language Formatter API","deprecated":null,"version":null,"sidebarTitle":"Zig Language Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/zig-language-formatter","href":"/api-reference/formatters/zig-language-formatter"},{"title":"Empty Lines Remover API","deprecated":null,"version":null,"sidebarTitle":"Empty Lines Remover","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/empty-lines-remover","href":"/api-reference/formatters/empty-lines-remover"},{"title":"Line Break Remover API","deprecated":null,"version":null,"sidebarTitle":"Line Break Remover","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/line-break-remover","href":"/api-reference/formatters/line-break-remover"},{"title":"Text Merger API","deprecated":null,"version":null,"sidebarTitle":"Text Merger","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-merger","href":"/api-reference/formatters/text-merger"},{"title":"Whitespace Trimmer API","deprecated":null,"version":null,"sidebarTitle":"Whitespace Trimmer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/whitespace-trimmer","href":"/api-reference/formatters/whitespace-trimmer"},{"title":"Time Duration Formatter API","deprecated":null,"version":null,"sidebarTitle":"Time Duration Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/time-duration-formatter","href":"/api-reference/formatters/time-duration-formatter"},{"title":"Shell Script Formatter API","deprecated":null,"version":null,"sidebarTitle":"Shell Script Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/shell-script-formatter","href":"/api-reference/formatters/shell-script-formatter"},{"title":"Solidity Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Solidity Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/solidity-code-formatter","href":"/api-reference/formatters/solidity-code-formatter"},{"title":"Stack Trace Formatter API","deprecated":null,"version":null,"sidebarTitle":"Stack Trace Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/stack-trace-formatter","href":"/api-reference/formatters/stack-trace-formatter"},{"title":"Swift Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Swift Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/swift-code-formatter","href":"/api-reference/formatters/swift-code-formatter"},{"title":"Text Column Aligner API","deprecated":null,"version":null,"sidebarTitle":"Text Column Aligner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-column-aligner","href":"/api-reference/formatters/text-column-aligner"},{"title":"XML Minifier API","deprecated":null,"version":null,"sidebarTitle":"XML Minifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-minifier","href":"/api-reference/formatters/xml-minifier"},{"title":"Haskell Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"Haskell Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/haskell-code-formatter","href":"/api-reference/formatters/haskell-code-formatter"},{"title":"R Code Formatter API","deprecated":null,"version":null,"sidebarTitle":"R Code Formatter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/r-code-formatter","href":"/api-reference/formatters/r-code-formatter"}]},{"group":"Generators","pages":[{"title":"RIPEMD-128, 256 \u0026 320 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"RIPEMD-128, 256 \u0026 320 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ripemd-variants-hash-generator","href":"/api-reference/generators/ripemd-128-256-\u0026-320-hash-generator"},{"title":"AES Key Generator API","deprecated":null,"version":null,"sidebarTitle":"AES Key Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/aes-key-generator","href":"/api-reference/generators/aes-key-generator"},{"title":"AI Image Generator API","deprecated":null,"version":null,"sidebarTitle":"AI Image Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-image-generator","href":"/api-reference/generators/ai-image-generator"},{"title":"AI Writer API","deprecated":null,"version":null,"sidebarTitle":"AI Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer","href":"/api-reference/generators/ai-writer"},{"title":"Answer Generator API","deprecated":null,"version":null,"sidebarTitle":"Answer Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/answers","href":"/api-reference/generators/answer-generator"},{"title":"Article Generator API","deprecated":null,"version":null,"sidebarTitle":"Article Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/article-generator","href":"/api-reference/generators/article-generator"},{"title":"Article Writer API","deprecated":null,"version":null,"sidebarTitle":"Article Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/article-writer","href":"/api-reference/generators/article-writer"},{"title":"AI Rephraser API","deprecated":null,"version":null,"sidebarTitle":"AI Rephraser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/ai-rephraser","href":"/api-reference/generators/ai-rephraser"},{"title":"Backstory Generator API","deprecated":null,"version":null,"sidebarTitle":"Backstory Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/backstory","href":"/api-reference/generators/backstory-generator"},{"title":"Baddie Comebacks Generator API","deprecated":null,"version":null,"sidebarTitle":"Baddie Comebacks Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/baddie-comebacks","href":"/api-reference/generators/baddie-comebacks-generator"},{"title":"Business Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Business Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/business-name-generator","href":"/api-reference/generators/business-name-generator"},{"title":"Cold Email Writer API","deprecated":null,"version":null,"sidebarTitle":"Cold Email Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/cold-email-writer","href":"/api-reference/generators/cold-email-writer"},{"title":"Email Generator API","deprecated":null,"version":null,"sidebarTitle":"Email Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/email","href":"/api-reference/generators/email-generator"},{"title":"Simple Email Signature Generator API","deprecated":null,"version":null,"sidebarTitle":"Simple Email Signature Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/email-signature","href":"/api-reference/generators/simple-email-signature-generator"},{"title":"AI Tweet Generator API","deprecated":null,"version":null,"sidebarTitle":"AI Tweet Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/ai-twitter-generator","href":"/api-reference/generators/ai-tweet-generator"},{"title":"Trivia Question Generator API","deprecated":null,"version":null,"sidebarTitle":"Trivia Question Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/trivia-generator","href":"/api-reference/generators/trivia-question-generator"},{"title":"TikTok Script Writer API","deprecated":null,"version":null,"sidebarTitle":"TikTok Script Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/tiktok-script-writer","href":"/api-reference/generators/tiktok-script-writer"},{"title":"Humanizer AI API","deprecated":null,"version":null,"sidebarTitle":"Humanizer AI","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/humanizer-ai","href":"/api-reference/generators/humanizer-ai"},{"title":"YouTube Script Writer API","deprecated":null,"version":null,"sidebarTitle":"YouTube Script Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/youtube-script-writer","href":"/api-reference/generators/youtube-script-writer"},{"title":"Explain Like I'm Five API","deprecated":null,"version":null,"sidebarTitle":"Explain Like I'm Five","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/explain-like-five","href":"/api-reference/generators/explain-like-im-five"},{"title":"Haiku Generator API","deprecated":null,"version":null,"sidebarTitle":"Haiku Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/haiku","href":"/api-reference/generators/haiku-generator"},{"title":"Happy Monday Quotes Generator API","deprecated":null,"version":null,"sidebarTitle":"Happy Monday Quotes Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/happy-monday-quotes","href":"/api-reference/generators/happy-monday-quotes-generator"},{"title":"Happy Thursday Quotes Generator API","deprecated":null,"version":null,"sidebarTitle":"Happy Thursday Quotes Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/happy-thursday-quotes","href":"/api-reference/generators/happy-thursday-quotes-generator"},{"title":"Happy Wednesday Quotes Generator API","deprecated":null,"version":null,"sidebarTitle":"Happy Wednesday Quotes Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/happy-wednesday-quotes","href":"/api-reference/generators/happy-wednesday-quotes-generator"},{"title":"Listicle Writer API","deprecated":null,"version":null,"sidebarTitle":"Listicle Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/listicle-writer","href":"/api-reference/generators/listicle-writer"},{"title":"Letter Writer API","deprecated":null,"version":null,"sidebarTitle":"Letter Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/letter","href":"/api-reference/generators/letter-writer"},{"title":"LinkedIn Post Generator API","deprecated":null,"version":null,"sidebarTitle":"LinkedIn Post Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/linkedin-post-generator","href":"/api-reference/generators/linkedin-post-generator"},{"title":"LinkedIn Summary Generator API","deprecated":null,"version":null,"sidebarTitle":"LinkedIn Summary Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/linkedin-summary","href":"/api-reference/generators/linkedin-summary-generator"},{"title":"Meta Description Generator API","deprecated":null,"version":null,"sidebarTitle":"Meta Description Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/meta-description-generator","href":"/api-reference/generators/meta-description-generator"},{"title":"NDA Generator API","deprecated":null,"version":null,"sidebarTitle":"NDA Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/nda-generator","href":"/api-reference/generators/nda-generator"},{"title":"Title Rewriter API","deprecated":null,"version":null,"sidebarTitle":"Title Rewriter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/title-rewriter","href":"/api-reference/generators/title-rewriter"},{"title":"Shorten Content API","deprecated":null,"version":null,"sidebarTitle":"Shorten Content","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/shorten-content","href":"/api-reference/generators/shorten-content"},{"title":"Translate API","deprecated":null,"version":null,"sidebarTitle":"Translate","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/translate","href":"/api-reference/generators/translate"},{"title":"Tone of Voice API","deprecated":null,"version":null,"sidebarTitle":"Tone of Voice","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/tone-of-voice","href":"/api-reference/generators/tone-of-voice"},{"title":"Business Slogan Generator API","deprecated":null,"version":null,"sidebarTitle":"Business Slogan Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/business-slogan-generator","href":"/api-reference/generators/business-slogan-generator"},{"title":"Instagram Caption Generator API","deprecated":null,"version":null,"sidebarTitle":"Instagram Caption Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/instagram-caption-generator","href":"/api-reference/generators/instagram-caption-generator"},{"title":"Press Release Generator API","deprecated":null,"version":null,"sidebarTitle":"Press Release Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/press-release-generator","href":"/api-reference/generators/press-release-generator"},{"title":"Business Plan Generator API","deprecated":null,"version":null,"sidebarTitle":"Business Plan Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/business-plan-generator","href":"/api-reference/generators/business-plan-generator"},{"title":"Landing Page Copy Generator API","deprecated":null,"version":null,"sidebarTitle":"Landing Page Copy Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/landing-page-copy","href":"/api-reference/generators/landing-page-copy-generator"},{"title":"Blog Outline Generator API","deprecated":null,"version":null,"sidebarTitle":"Blog Outline Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/blog-outline","href":"/api-reference/generators/blog-outline-generator"},{"title":"Essay Writer API","deprecated":null,"version":null,"sidebarTitle":"Essay Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/essay-writer","href":"/api-reference/generators/essay-writer"},{"title":"Podcast Script Writer API","deprecated":null,"version":null,"sidebarTitle":"Podcast Script Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/podcast-writer","href":"/api-reference/generators/podcast-script-writer"},{"title":"Real Estate Description Generator API","deprecated":null,"version":null,"sidebarTitle":"Real Estate Description Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/real-estate-description","href":"/api-reference/generators/real-estate-description-generator"},{"title":"FAQ Generator API","deprecated":null,"version":null,"sidebarTitle":"FAQ Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/faq-generator","href":"/api-reference/generators/faq-generator"},{"title":"Content Brief Generator API","deprecated":null,"version":null,"sidebarTitle":"Content Brief Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/content-brief-generator","href":"/api-reference/generators/content-brief-generator"},{"title":"Facebook Ad Headlines Generator API","deprecated":null,"version":null,"sidebarTitle":"Facebook Ad Headlines Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/facebook-ad-headlines","href":"/api-reference/generators/facebook-ad-headlines-generator"},{"title":"Poll Generator API","deprecated":null,"version":null,"sidebarTitle":"Poll Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/poll-generator","href":"/api-reference/generators/poll-generator"},{"title":"Content Planner API","deprecated":null,"version":null,"sidebarTitle":"Content Planner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/content-planner","href":"/api-reference/generators/content-planner"},{"title":"Post Ideas Generator API","deprecated":null,"version":null,"sidebarTitle":"Post Ideas Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/post-ideas","href":"/api-reference/generators/post-ideas-generator"},{"title":"Post Generator API","deprecated":null,"version":null,"sidebarTitle":"Post Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/post-generator","href":"/api-reference/generators/post-generator"},{"title":"Post Rewriter API","deprecated":null,"version":null,"sidebarTitle":"Post Rewriter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/post-rewriter","href":"/api-reference/generators/post-rewriter"},{"title":"Instagram Story Ideas API","deprecated":null,"version":null,"sidebarTitle":"Instagram Story Ideas","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/instagram-story-ideas","href":"/api-reference/generators/instagram-story-ideas"},{"title":"Paragraph Writer API","deprecated":null,"version":null,"sidebarTitle":"Paragraph Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/paragraph","href":"/api-reference/generators/paragraph-writer"},{"title":"Privacy Policy Generator API","deprecated":null,"version":null,"sidebarTitle":"Privacy Policy Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/privacy-policy-generator","href":"/api-reference/generators/privacy-policy-generator"},{"title":"Random Topic Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Topic Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/random-topics","href":"/api-reference/generators/random-topic-generator"},{"title":"Rap Lyrics Generator API","deprecated":null,"version":null,"sidebarTitle":"Rap Lyrics Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/rap-lyrics","href":"/api-reference/generators/rap-lyrics-generator"},{"title":"Response Generator API","deprecated":null,"version":null,"sidebarTitle":"Response Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/response","href":"/api-reference/generators/response-generator"},{"title":"Sentence Expander API","deprecated":null,"version":null,"sidebarTitle":"Sentence Expander","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/sentence-expander","href":"/api-reference/generators/sentence-expander"},{"title":"Content Improver API","deprecated":null,"version":null,"sidebarTitle":"Content Improver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/content-improver","href":"/api-reference/generators/content-improver"},{"title":"Paragraph Completer API","deprecated":null,"version":null,"sidebarTitle":"Paragraph Completer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/paragraph-completer","href":"/api-reference/generators/paragraph-completer"},{"title":"Content Summarizer API","deprecated":null,"version":null,"sidebarTitle":"Content Summarizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/content-summarizer","href":"/api-reference/generators/content-summarizer"},{"title":"Paragraph Rewriter API","deprecated":null,"version":null,"sidebarTitle":"Paragraph Rewriter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/paragraph-rewriter","href":"/api-reference/generators/paragraph-rewriter"},{"title":"Sentence Rewriter API","deprecated":null,"version":null,"sidebarTitle":"Sentence Rewriter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/sentence-rewriter","href":"/api-reference/generators/sentence-rewriter"},{"title":"Serene Saturday Quote Generator API","deprecated":null,"version":null,"sidebarTitle":"Serene Saturday Quote Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/serene-saturday-quotes","href":"/api-reference/generators/serene-saturday-quote-generator"},{"title":"Speech Writer API","deprecated":null,"version":null,"sidebarTitle":"Speech Writer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/speech-writer","href":"/api-reference/generators/speech-writer"},{"title":"Story Generator API","deprecated":null,"version":null,"sidebarTitle":"Story Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/story","href":"/api-reference/generators/story-generator"},{"title":"Story Plot Generator API","deprecated":null,"version":null,"sidebarTitle":"Story Plot Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/story-plot","href":"/api-reference/generators/story-plot-generator"},{"title":"Terms and Conditions Generator API","deprecated":null,"version":null,"sidebarTitle":"Terms and Conditions Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/terms-and-conditions-generator","href":"/api-reference/generators/terms-and-conditions-generator"},{"title":"Thoughtful Tuesday Quotes Generator API","deprecated":null,"version":null,"sidebarTitle":"Thoughtful Tuesday Quotes Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/thoughtful-tuesday-quotes","href":"/api-reference/generators/thoughtful-tuesday-quotes-generator"},{"title":"Topic Sentence Generator API","deprecated":null,"version":null,"sidebarTitle":"Topic Sentence Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-writer/topic-sentence","href":"/api-reference/generators/topic-sentence-generator"},{"title":"Anagram Generator API","deprecated":null,"version":null,"sidebarTitle":"Anagram Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/anagram-generator","href":"/api-reference/generators/anagram-generator"},{"title":"ANSI Terminal Color Code Generator API","deprecated":null,"version":null,"sidebarTitle":"ANSI Terminal Color Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ansi-terminal-color-code-generator","href":"/api-reference/generators/ansi-terminal-color-code-generator"},{"title":"API Signature Generator API","deprecated":null,"version":null,"sidebarTitle":"API Signature Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/api-signature-generator","href":"/api-reference/generators/api-signature-generator"},{"title":"Argon2 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"Argon2 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/argon2-hash-generator","href":"/api-reference/generators/argon2-hash-generator"},{"title":"ASCII Box \u0026 Table Generator API","deprecated":null,"version":null,"sidebarTitle":"ASCII Box \u0026 Table Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ascii-box-table-generator","href":"/api-reference/generators/ascii-box-\u0026-table-generator"},{"title":"ASCII Text Art Generator API","deprecated":null,"version":null,"sidebarTitle":"ASCII Text Art Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ascii-text-art-generator","href":"/api-reference/generators/ascii-text-art-generator"},{"title":"Babel Config Generator API","deprecated":null,"version":null,"sidebarTitle":"Babel Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/babel-config-generator","href":"/api-reference/generators/babel-config-generator"},{"title":"Barcode Generator API","deprecated":null,"version":null,"sidebarTitle":"Barcode Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/barcode-generator","href":"/api-reference/generators/barcode-generator"},{"title":"Basic Auth Generator API","deprecated":null,"version":null,"sidebarTitle":"Basic Auth Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/basic-auth-generator","href":"/api-reference/generators/basic-auth-generator"},{"title":"Bcrypt Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"Bcrypt Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bcrypt-hash-generator","href":"/api-reference/generators/bcrypt-hash-generator"},{"title":"Biome Config Generator API","deprecated":null,"version":null,"sidebarTitle":"Biome Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/biome-config-generator","href":"/api-reference/generators/biome-config-generator"},{"title":"BIP39 Mnemonic Converter API","deprecated":null,"version":null,"sidebarTitle":"BIP39 Mnemonic Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bip39-mnemonic-converter","href":"/api-reference/generators/bip39-mnemonic-converter"},{"title":"Border Radius Generator API","deprecated":null,"version":null,"sidebarTitle":"Border Radius Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/border-radius-generator","href":"/api-reference/generators/border-radius-generator"},{"title":"Brand Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Brand Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/brand-name-generator","href":"/api-reference/generators/brand-name-generator"},{"title":"Bill of Sale Generator API","deprecated":null,"version":null,"sidebarTitle":"Bill of Sale Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bill-of-sale-generator","href":"/api-reference/generators/bill-of-sale-generator"},{"title":"Purchase Agreement Generator API","deprecated":null,"version":null,"sidebarTitle":"Purchase Agreement Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/purchase-agreement-generator","href":"/api-reference/generators/purchase-agreement-generator"},{"title":"Business Lorem Ipsum Generator API","deprecated":null,"version":null,"sidebarTitle":"Business Lorem Ipsum Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/business-lorem-ipsum-generator","href":"/api-reference/generators/business-lorem-ipsum-generator"},{"title":"HTTP Cache-Control Header Builder API","deprecated":null,"version":null,"sidebarTitle":"HTTP Cache-Control Header Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cache-control-header-builder","href":"/api-reference/generators/http-cache-control-header-builder"},{"title":"Campaign URL Builder API","deprecated":null,"version":null,"sidebarTitle":"Campaign URL Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/campaign-url-builder","href":"/api-reference/generators/campaign-url-builder"},{"title":"ChaCha20 Key Generator API","deprecated":null,"version":null,"sidebarTitle":"ChaCha20 Key Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/chacha20-key-generator","href":"/api-reference/generators/chacha20-key-generator"},{"title":"Chart Maker API","deprecated":null,"version":null,"sidebarTitle":"Chart Maker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/chart-maker","href":"/api-reference/generators/chart-maker"},{"title":"Citation Generator API","deprecated":null,"version":null,"sidebarTitle":"Citation Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/citation-generator","href":"/api-reference/generators/citation-generator"},{"title":"Photo Collage Maker API","deprecated":null,"version":null,"sidebarTitle":"Photo Collage Maker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/collage-maker","href":"/api-reference/generators/photo-collage-maker"},{"title":"Color Mixer API","deprecated":null,"version":null,"sidebarTitle":"Color Mixer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-mixer","href":"/api-reference/generators/color-mixer"},{"title":"Identicon / Avatar Generator API","deprecated":null,"version":null,"sidebarTitle":"Identicon / Avatar Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/identicon-generator","href":"/api-reference/generators/identicon-avatar-generator"},{"title":"Color Swatch Sheet Generator API","deprecated":null,"version":null,"sidebarTitle":"Color Swatch Sheet Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-swatch-sheet-generator","href":"/api-reference/generators/color-swatch-sheet-generator"},{"title":"Color Scheme Generator API","deprecated":null,"version":null,"sidebarTitle":"Color Scheme Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-scheme-generator","href":"/api-reference/generators/color-scheme-generator"},{"title":"Color Tint \u0026 Shade Generator API","deprecated":null,"version":null,"sidebarTitle":"Color Tint \u0026 Shade Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-tint-shade-generator","href":"/api-reference/generators/color-tint-\u0026-shade-generator"},{"title":"Text Repeat API","deprecated":null,"version":null,"sidebarTitle":"Text Repeat","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-repeat","href":"/api-reference/generators/text-repeat"},{"title":"Cookie Builder API","deprecated":null,"version":null,"sidebarTitle":"Cookie Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cookie-builder","href":"/api-reference/generators/cookie-builder"},{"title":"CORS Headers Builder API","deprecated":null,"version":null,"sidebarTitle":"CORS Headers Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cors-headers-builder","href":"/api-reference/generators/cors-headers-builder"},{"title":"CRC Checksum Calculator API","deprecated":null,"version":null,"sidebarTitle":"CRC Checksum Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/crc-checksum-calculator","href":"/api-reference/generators/crc-checksum-calculator"},{"title":"Credit Cards Generator API","deprecated":null,"version":null,"sidebarTitle":"Credit Cards Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/credit-cards-generator","href":"/api-reference/generators/credit-cards-generator"},{"title":"Cron Expression Generator API","deprecated":null,"version":null,"sidebarTitle":"Cron Expression Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cron-expression-generator","href":"/api-reference/generators/cron-expression-generator"},{"title":"CRC32 Checksum Generator API","deprecated":null,"version":null,"sidebarTitle":"CRC32 Checksum Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/crc32-checksum-generator","href":"/api-reference/generators/crc32-checksum-generator"},{"title":"CSR (Certificate Signing Request) Generator API","deprecated":null,"version":null,"sidebarTitle":"CSR (Certificate Signing Request) Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csr-generator","href":"/api-reference/generators/csr-certificate-signing-request-generator"},{"title":"CSP Generator API","deprecated":null,"version":null,"sidebarTitle":"CSP Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csp-generator","href":"/api-reference/generators/csp-generator"},{"title":"CSS Border Style Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Border Style Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-border-style-generator","href":"/api-reference/generators/css-border-style-generator"},{"title":"CSS Box Shadow Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Box Shadow Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-box-shadow-generator","href":"/api-reference/generators/css-box-shadow-generator"},{"title":"CSS Drop Shadow Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Drop Shadow Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-drop-shadow-filter-generator","href":"/api-reference/generators/css-drop-shadow-generator"},{"title":"CSS Checkbox Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Checkbox Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-checkbox-generator","href":"/api-reference/generators/css-checkbox-generator"},{"title":"CSS Clip-Path Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Clip-Path Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-clip-path-generator","href":"/api-reference/generators/css-clip-path-generator"},{"title":"CSS Container Query Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Container Query Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-container-query-generator","href":"/api-reference/generators/css-container-query-generator"},{"title":"CSS Corner Cutter API","deprecated":null,"version":null,"sidebarTitle":"CSS Corner Cutter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-corner-cutter","href":"/api-reference/generators/css-corner-cutter"},{"title":"CSS Cubic Bezier Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Cubic Bezier Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-cubic-bezier-generator","href":"/api-reference/generators/css-cubic-bezier-generator"},{"title":"CSS Design Token Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Design Token Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-design-token-generator","href":"/api-reference/generators/css-design-token-generator"},{"title":"CSS Filter Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Filter Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-filter-generator","href":"/api-reference/generators/css-filter-generator"},{"title":"CSS Flexbox Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Flexbox Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-flexbox-generator","href":"/api-reference/generators/css-flexbox-generator"},{"title":"CSS Fluid Typography Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Fluid Typography Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-fluid-typography-generator","href":"/api-reference/generators/css-fluid-typography-generator"},{"title":"CSS Glassmorphism Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Glassmorphism Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-glassmorphism-generator","href":"/api-reference/generators/css-glassmorphism-generator"},{"title":"CSS Glitch Text Effect Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Glitch Text Effect Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-glitch-text-generator","href":"/api-reference/generators/css-glitch-text-effect-generator"},{"title":"CSS Text Shadow Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Text Shadow Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-text-shadow-generator","href":"/api-reference/generators/css-text-shadow-generator"},{"title":"CSS Transition Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Transition Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-transition-generator","href":"/api-reference/generators/css-transition-generator"},{"title":"CSS Gradient Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Gradient Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-gradient-generator","href":"/api-reference/generators/css-gradient-generator"},{"title":"Aurora / Gradient Blob CSS Background Generator API","deprecated":null,"version":null,"sidebarTitle":"Aurora / Gradient Blob CSS Background Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-aurora-blob-generator","href":"/api-reference/generators/aurora-gradient-blob-css-background-generator"},{"title":"CSS Background Pattern Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Background Pattern Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-background-pattern-generator","href":"/api-reference/generators/css-background-pattern-generator"},{"title":"CSS Gradient Mesh Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Gradient Mesh Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-gradient-mesh-generator","href":"/api-reference/generators/css-gradient-mesh-generator"},{"title":"CSS Gradient Shadow Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Gradient Shadow Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-gradient-shadow-generator","href":"/api-reference/generators/css-gradient-shadow-generator"},{"title":"CSS Grid Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Grid Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-grid-generator","href":"/api-reference/generators/css-grid-generator"},{"title":"CSS Keyframe Animation Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Keyframe Animation Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-keyframe-animation-generator","href":"/api-reference/generators/css-keyframe-animation-generator"},{"title":"CSS Loading Animation Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Loading Animation Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-loading-animation-generator","href":"/api-reference/generators/css-loading-animation-generator"},{"title":"CSS Media Query Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Media Query Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-media-query-generator","href":"/api-reference/generators/css-media-query-generator"},{"title":"CSS Neumorphism Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Neumorphism Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-neumorphism-generator","href":"/api-reference/generators/css-neumorphism-generator"},{"title":"CSS Ribbon Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Ribbon Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-ribbon-generator","href":"/api-reference/generators/css-ribbon-generator"},{"title":"CSS Scroll-Driven Animation Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Scroll-Driven Animation Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-scroll-driven-animation-generator","href":"/api-reference/generators/css-scroll-driven-animation-generator"},{"title":"CSS Scrollbar Style Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Scrollbar Style Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-scrollbar-style-generator","href":"/api-reference/generators/css-scrollbar-style-generator"},{"title":"CSS Section Divider Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Section Divider Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-section-divider-generator","href":"/api-reference/generators/css-section-divider-generator"},{"title":"CSS Speech Bubble / Tooltip Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Speech Bubble / Tooltip Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-speech-bubble-generator","href":"/api-reference/generators/css-speech-bubble-tooltip-generator"},{"title":"CSS Starburst / Sale-Badge Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Starburst / Sale-Badge Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-starburst-generator","href":"/api-reference/generators/css-starburst-sale-badge-generator"},{"title":"CSS Transform Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Transform Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-transform-generator","href":"/api-reference/generators/css-transform-generator"},{"title":"CSS Perspective Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Perspective Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-perspective-generator","href":"/api-reference/generators/css-perspective-generator"},{"title":"CSS Toggle Switch Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Toggle Switch Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-switch-generator","href":"/api-reference/generators/css-toggle-switch-generator"},{"title":"CSS Triangle Generator API","deprecated":null,"version":null,"sidebarTitle":"CSS Triangle Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-triangle-generator","href":"/api-reference/generators/css-triangle-generator"},{"title":"CUID2 Generator API","deprecated":null,"version":null,"sidebarTitle":"CUID2 Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cuid2-generator","href":"/api-reference/generators/cuid2-generator"},{"title":"cURL Command Builder API","deprecated":null,"version":null,"sidebarTitle":"cURL Command Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/curl-command-builder","href":"/api-reference/generators/curl-command-builder"},{"title":"Database Connection String Builder API","deprecated":null,"version":null,"sidebarTitle":"Database Connection String Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/database-connection-string-builder","href":"/api-reference/generators/database-connection-string-builder"},{"title":"Date Range Generator API","deprecated":null,"version":null,"sidebarTitle":"Date Range Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/date-range-generator","href":"/api-reference/generators/date-range-generator"},{"title":"Deno.json Config Generator API","deprecated":null,"version":null,"sidebarTitle":"Deno.json Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/deno-json-config-generator","href":"/api-reference/generators/denojson-config-generator"},{"title":"Directory Tree Generator API","deprecated":null,"version":null,"sidebarTitle":"Directory Tree Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/directory-tree-generator","href":"/api-reference/generators/directory-tree-generator"},{"title":"DNA / RNA Sequence Generator API","deprecated":null,"version":null,"sidebarTitle":"DNA / RNA Sequence Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dna-rna-sequence-generator","href":"/api-reference/generators/dna-rna-sequence-generator"},{"title":"DNS Zone File Generator API","deprecated":null,"version":null,"sidebarTitle":"DNS Zone File Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dns-zone-file-generator","href":"/api-reference/generators/dns-zone-file-generator"},{"title":"Dockerfile Generator API","deprecated":null,"version":null,"sidebarTitle":"Dockerfile Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dockerfile-generator","href":"/api-reference/generators/dockerfile-generator"},{"title":"Dockerignore Generator API","deprecated":null,"version":null,"sidebarTitle":"Dockerignore Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dockerignore-generator","href":"/api-reference/generators/dockerignore-generator"},{"title":"ECDSA / Ed25519 Key Generator API","deprecated":null,"version":null,"sidebarTitle":"ECDSA / Ed25519 Key Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ecdsa-ed25519-key-generator","href":"/api-reference/generators/ecdsa-ed25519-key-generator"},{"title":"EditorConfig Generator API","deprecated":null,"version":null,"sidebarTitle":"EditorConfig Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/editorconfig-generator","href":"/api-reference/generators/editorconfig-generator"},{"title":"Email Signature HTML Generator API","deprecated":null,"version":null,"sidebarTitle":"Email Signature HTML Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/email-signature-html-generator","href":"/api-reference/generators/email-signature-html-generator"},{"title":"Env Secrets Generator API","deprecated":null,"version":null,"sidebarTitle":"Env Secrets Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/env-secrets-generator","href":"/api-reference/generators/env-secrets-generator"},{"title":"ESLint Config Generator API","deprecated":null,"version":null,"sidebarTitle":"ESLint Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/eslint-config-generator","href":"/api-reference/generators/eslint-config-generator"},{"title":"Fake Data Generator API","deprecated":null,"version":null,"sidebarTitle":"Fake Data Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fake-data-generator","href":"/api-reference/generators/fake-data-generator"},{"title":"Fake Email Address Generator API","deprecated":null,"version":null,"sidebarTitle":"Fake Email Address Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fake-email-address-generator","href":"/api-reference/generators/fake-email-address-generator"},{"title":"Fake IBAN Generator API","deprecated":null,"version":null,"sidebarTitle":"Fake IBAN Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fake-iban-generator","href":"/api-reference/generators/fake-iban-generator"},{"title":"Fake IP Address Generator API","deprecated":null,"version":null,"sidebarTitle":"Fake IP Address Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fake-ip-address-generator","href":"/api-reference/generators/fake-ip-address-generator"},{"title":"Fibonacci Generator API","deprecated":null,"version":null,"sidebarTitle":"Fibonacci Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fibonacci-generator","href":"/api-reference/generators/fibonacci-generator"},{"title":"Flip GIF API","deprecated":null,"version":null,"sidebarTitle":"Flip GIF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/flip-gif","href":"/api-reference/generators/flip-gif"},{"title":"Font Generator API","deprecated":null,"version":null,"sidebarTitle":"Font Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/font-generator","href":"/api-reference/generators/font-generator"},{"title":"Font Modular Scale Generator API","deprecated":null,"version":null,"sidebarTitle":"Font Modular Scale Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/font-modular-scale-generator","href":"/api-reference/generators/font-modular-scale-generator"},{"title":"GIF Color Changer API","deprecated":null,"version":null,"sidebarTitle":"GIF Color Changer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-color-changer","href":"/api-reference/generators/gif-color-changer"},{"title":"GIF Combiner API","deprecated":null,"version":null,"sidebarTitle":"GIF Combiner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-combiner","href":"/api-reference/generators/gif-combiner"},{"title":"GIF Editor API","deprecated":null,"version":null,"sidebarTitle":"GIF Editor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-editor","href":"/api-reference/generators/gif-editor"},{"title":"GIF Extender API","deprecated":null,"version":null,"sidebarTitle":"GIF Extender","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-extender","href":"/api-reference/generators/gif-extender"},{"title":"GIF Frame Randomizer API","deprecated":null,"version":null,"sidebarTitle":"GIF Frame Randomizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-frame-randomizer","href":"/api-reference/generators/gif-frame-randomizer"},{"title":"GIF Loop Changer API","deprecated":null,"version":null,"sidebarTitle":"GIF Loop Changer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-loop-changer","href":"/api-reference/generators/gif-loop-changer"},{"title":"GIF Trimmer API","deprecated":null,"version":null,"sidebarTitle":"GIF Trimmer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gif-trimmer","href":"/api-reference/generators/gif-trimmer"},{"title":"Git Unified Diff Patch Generator API","deprecated":null,"version":null,"sidebarTitle":"Git Unified Diff Patch Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/git-unified-diff-patch-generator","href":"/api-reference/generators/git-unified-diff-patch-generator"},{"title":".gitattributes Generator API","deprecated":null,"version":null,"sidebarTitle":".gitattributes Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gitattributes-generator","href":"/api-reference/generators/gitattributes-generator"},{"title":"GitHub Actions Workflow Generator API","deprecated":null,"version":null,"sidebarTitle":"GitHub Actions Workflow Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/github-actions-workflow-generator","href":"/api-reference/generators/github-actions-workflow-generator"},{"title":"Gitignore Generator API","deprecated":null,"version":null,"sidebarTitle":"Gitignore Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gitignore-generator","href":"/api-reference/generators/gitignore-generator"},{"title":"Google Review Link Generator API","deprecated":null,"version":null,"sidebarTitle":"Google Review Link Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/google-review-link-generator","href":"/api-reference/generators/google-review-link-generator"},{"title":"Gradient Text CSS Generator API","deprecated":null,"version":null,"sidebarTitle":"Gradient Text CSS Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gradient-text-css-generator","href":"/api-reference/generators/gradient-text-css-generator"},{"title":"Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hash-generator","href":"/api-reference/generators/hash-generator"},{"title":"Hashtag Generator API","deprecated":null,"version":null,"sidebarTitle":"Hashtag Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hashtag-generator","href":"/api-reference/generators/hashtag-generator"},{"title":"HMAC Generator API","deprecated":null,"version":null,"sidebarTitle":"HMAC Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hmac-generator","href":"/api-reference/generators/hmac-generator"},{"title":"HSTS Preload Header Generator API","deprecated":null,"version":null,"sidebarTitle":"HSTS Preload Header Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hsts-preload-header-generator","href":"/api-reference/generators/hsts-preload-header-generator"},{"title":".htaccess Redirect Generator API","deprecated":null,"version":null,"sidebarTitle":".htaccess Redirect Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/htaccess-redirect-generator","href":"/api-reference/generators/htaccess-redirect-generator"},{"title":".htaccess Rule Generator API","deprecated":null,"version":null,"sidebarTitle":".htaccess Rule Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/htaccess-rule-generator","href":"/api-reference/generators/htaccess-rule-generator"},{"title":"HTML Email Template Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Email Template Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-email-template-generator","href":"/api-reference/generators/html-email-template-generator"},{"title":"HTML Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator","href":"/api-reference/generators/html-generator"},{"title":"HTML Button Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Button Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/button","href":"/api-reference/generators/html-button-generator"},{"title":"HTML Checkbox Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Checkbox Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/checkbox","href":"/api-reference/generators/html-checkbox-generator"},{"title":"HTML Iframe Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Iframe Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/iframe","href":"/api-reference/generators/html-iframe-generator"},{"title":"HTML Image Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Image Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/image","href":"/api-reference/generators/html-image-generator"},{"title":"HTML Input Color Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Color Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-color","href":"/api-reference/generators/html-input-color-generator"},{"title":"HTML Input Date \u0026 Time Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Date \u0026 Time Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-date-time","href":"/api-reference/generators/html-input-date-\u0026-time-generator"},{"title":"HTML Input Email Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Email Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-email","href":"/api-reference/generators/html-input-email-generator"},{"title":"HTML Input File Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input File Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-file","href":"/api-reference/generators/html-input-file-generator"},{"title":"HTML Input Image Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Image Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-image","href":"/api-reference/generators/html-input-image-generator"},{"title":"HTML Input Number Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Number Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-number","href":"/api-reference/generators/html-input-number-generator"},{"title":"HTML Input Password Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Password Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-password","href":"/api-reference/generators/html-input-password-generator"},{"title":"HTML Input Range Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Range Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-range","href":"/api-reference/generators/html-input-range-generator"},{"title":"HTML Input Search Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Search Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-search","href":"/api-reference/generators/html-input-search-generator"},{"title":"HTML Input Submit Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Submit Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-submit","href":"/api-reference/generators/html-input-submit-generator"},{"title":"HTML Input Tel Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Tel Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-tel","href":"/api-reference/generators/html-input-tel-generator"},{"title":"HTML Input Text Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input Text Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-text","href":"/api-reference/generators/html-input-text-generator"},{"title":"HTML Input URL Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Input URL Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/input-url","href":"/api-reference/generators/html-input-url-generator"},{"title":"HTML Progress Bar Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Progress Bar Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/progress","href":"/api-reference/generators/html-progress-bar-generator"},{"title":"HTML Radio Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Radio Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/radio","href":"/api-reference/generators/html-radio-generator"},{"title":"HTML Textarea Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Textarea Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-generator/textarea","href":"/api-reference/generators/html-textarea-generator"},{"title":"SERP Simulator API","deprecated":null,"version":null,"sidebarTitle":"SERP Simulator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/google-serp-snippet-simulator","href":"/api-reference/generators/serp-simulator"},{"title":"Hreflang Tag Generator API","deprecated":null,"version":null,"sidebarTitle":"Hreflang Tag Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hreflang-generator","href":"/api-reference/generators/hreflang-tag-generator"},{"title":"HTML Form to cURL Command Converter API","deprecated":null,"version":null,"sidebarTitle":"HTML Form to cURL Command Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-form-to-curl-converter","href":"/api-reference/generators/html-form-to-curl-command-converter"},{"title":"HTML Meta Tag Generator API","deprecated":null,"version":null,"sidebarTitle":"HTML Meta Tag Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-meta-tag-generator","href":"/api-reference/generators/html-meta-tag-generator"},{"title":"htpasswd Generator API","deprecated":null,"version":null,"sidebarTitle":"htpasswd Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/htpasswd-generator","href":"/api-reference/generators/htpasswd-generator"},{"title":"HTTP Request Header Builder API","deprecated":null,"version":null,"sidebarTitle":"HTTP Request Header Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/http-request-header-builder","href":"/api-reference/generators/http-request-header-builder"},{"title":"ICS Calendar Event Generator API","deprecated":null,"version":null,"sidebarTitle":"ICS Calendar Event Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ics-calendar-event-generator","href":"/api-reference/generators/ics-calendar-event-generator"},{"title":"Image Caption Generator API","deprecated":null,"version":null,"sidebarTitle":"Image Caption Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-caption-generator","href":"/api-reference/generators/image-caption-generator"},{"title":"Image Placeholder Generator API","deprecated":null,"version":null,"sidebarTitle":"Image Placeholder Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-placeholder-generator","href":"/api-reference/generators/image-placeholder-generator"},{"title":"IMEI Number Generator API","deprecated":null,"version":null,"sidebarTitle":"IMEI Number Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/imei-number-generator","href":"/api-reference/generators/imei-number-generator"},{"title":"iMessage Chat Generator API","deprecated":null,"version":null,"sidebarTitle":"iMessage Chat Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/imessage-chat-generator","href":"/api-reference/generators/imessage-chat-generator"},{"title":"Instagram DM Generator API","deprecated":null,"version":null,"sidebarTitle":"Instagram DM Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/instagram-dm-generator","href":"/api-reference/generators/instagram-dm-generator"},{"title":"Instagram Post Generator API","deprecated":null,"version":null,"sidebarTitle":"Instagram Post Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/instagram-post-generator","href":"/api-reference/generators/instagram-post-generator"},{"title":"Instagram Square GIF API","deprecated":null,"version":null,"sidebarTitle":"Instagram Square GIF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/instagram-square-gif","href":"/api-reference/generators/instagram-square-gif"},{"title":"Instagram Story Generator API","deprecated":null,"version":null,"sidebarTitle":"Instagram Story Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/instagram-story-generator","href":"/api-reference/generators/instagram-story-generator"},{"title":"Invisible Character Generator API","deprecated":null,"version":null,"sidebarTitle":"Invisible Character Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/invisible-character-generator","href":"/api-reference/generators/invisible-character-generator"},{"title":"Invoice Generator API","deprecated":null,"version":null,"sidebarTitle":"Invoice Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/invoice-generator","href":"/api-reference/generators/invoice-generator"},{"title":"IPv6 ULA Generator API","deprecated":null,"version":null,"sidebarTitle":"IPv6 ULA Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv6-ula-generator","href":"/api-reference/generators/ipv6-ula-generator"},{"title":"Schema Markup Generator API","deprecated":null,"version":null,"sidebarTitle":"Schema Markup Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/schema-markup-generator","href":"/api-reference/generators/schema-markup-generator"},{"title":"JSON Schema Sample Generator API","deprecated":null,"version":null,"sidebarTitle":"JSON Schema Sample Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-schema-sample-generator","href":"/api-reference/generators/json-schema-sample-generator"},{"title":"TOTP/HOTP Generator API","deprecated":null,"version":null,"sidebarTitle":"TOTP/HOTP Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/totp-hotp-generator","href":"/api-reference/generators/totphotp-generator"},{"title":"Twitter Ad Revenue Generator API","deprecated":null,"version":null,"sidebarTitle":"Twitter Ad Revenue Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/twitter-ad-revenue-generator","href":"/api-reference/generators/twitter-ad-revenue-generator"},{"title":"TypeScript Enum Generator API","deprecated":null,"version":null,"sidebarTitle":"TypeScript Enum Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/typescript-enum-generator","href":"/api-reference/generators/typescript-enum-generator"},{"title":"JWK / JWK Set Generator API","deprecated":null,"version":null,"sidebarTitle":"JWK / JWK Set Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jwk-set-generator","href":"/api-reference/generators/jwk-jwk-set-generator"},{"title":"JWT Encoder API","deprecated":null,"version":null,"sidebarTitle":"JWT Encoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jwt-encoder","href":"/api-reference/generators/jwt-encoder"},{"title":"KSUID Generator API","deprecated":null,"version":null,"sidebarTitle":"KSUID Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ksuid-generator","href":"/api-reference/generators/ksuid-generator"},{"title":"Kubernetes ConfigMap \u0026 Secret Generator API","deprecated":null,"version":null,"sidebarTitle":"Kubernetes ConfigMap \u0026 Secret Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/kubernetes-configmap-secret-generator","href":"/api-reference/generators/kubernetes-configmap-\u0026-secret-generator"},{"title":"Kustomize kustomization.yaml Generator API","deprecated":null,"version":null,"sidebarTitle":"Kustomize kustomization.yaml Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/kustomize-generator","href":"/api-reference/generators/kustomize-kustomizationyaml-generator"},{"title":"List Randomizer API","deprecated":null,"version":null,"sidebarTitle":"List Randomizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/list-randomizer","href":"/api-reference/generators/list-randomizer"},{"title":"Lorem Ipsum Generator API","deprecated":null,"version":null,"sidebarTitle":"Lorem Ipsum Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lorem-ipsum-generator","href":"/api-reference/generators/lorem-ipsum-generator"},{"title":"LaTeX Equation Renderer API","deprecated":null,"version":null,"sidebarTitle":"LaTeX Equation Renderer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/latex-equation-renderer","href":"/api-reference/generators/latex-equation-renderer"},{"title":"Long Tail Keyword Generator API","deprecated":null,"version":null,"sidebarTitle":"Long Tail Keyword Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/long-tail-keyword-generator","href":"/api-reference/generators/long-tail-keyword-generator"},{"title":"Maze Generator (SVG) API","deprecated":null,"version":null,"sidebarTitle":"Maze Generator (SVG)","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/maze-generator-svg","href":"/api-reference/generators/maze-generator-svg"},{"title":"PDF Button Generator API","deprecated":null,"version":null,"sidebarTitle":"PDF Button Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-button-generator","href":"/api-reference/generators/pdf-button-generator"},{"title":"PDF Embed Code Generator API","deprecated":null,"version":null,"sidebarTitle":"PDF Embed Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-embed-code-generator","href":"/api-reference/generators/pdf-embed-code-generator"},{"title":"Merkle Tree Generator API","deprecated":null,"version":null,"sidebarTitle":"Merkle Tree Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/merkle-tree-generator","href":"/api-reference/generators/merkle-tree-generator"},{"title":"Mock HTTP Response Builder API","deprecated":null,"version":null,"sidebarTitle":"Mock HTTP Response Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mock-http-response-builder","href":"/api-reference/generators/mock-http-response-builder"},{"title":"Name Picker API","deprecated":null,"version":null,"sidebarTitle":"Name Picker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-picker","href":"/api-reference/generators/name-picker"},{"title":"Nano ID Generator API","deprecated":null,"version":null,"sidebarTitle":"Nano ID Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nanoid-generator","href":"/api-reference/generators/nano-id-generator"},{"title":"Nginx Rewrite \u0026 Redirect Rule Generator API","deprecated":null,"version":null,"sidebarTitle":"Nginx Rewrite \u0026 Redirect Rule Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nginx-rewrite-rule-generator","href":"/api-reference/generators/nginx-rewrite-\u0026-redirect-rule-generator"},{"title":"Nginx Server Block Generator API","deprecated":null,"version":null,"sidebarTitle":"Nginx Server Block Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nginx-server-block-generator","href":"/api-reference/generators/nginx-server-block-generator"},{"title":"Nonce Generator API","deprecated":null,"version":null,"sidebarTitle":"Nonce Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nonce-generator","href":"/api-reference/generators/nonce-generator"},{"title":".npmrc Config Generator API","deprecated":null,"version":null,"sidebarTitle":".npmrc Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/npmrc-config-generator","href":"/api-reference/generators/npmrc-config-generator"},{"title":"Number Sequence Generator API","deprecated":null,"version":null,"sidebarTitle":"Number Sequence Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/number-sequence-generator","href":"/api-reference/generators/number-sequence-generator"},{"title":"Numeronym Generator API","deprecated":null,"version":null,"sidebarTitle":"Numeronym Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/numeronym-generator","href":"/api-reference/generators/numeronym-generator"},{"title":"OAuth Authorization URL Builder API","deprecated":null,"version":null,"sidebarTitle":"OAuth Authorization URL Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/oauth-authorization-url-builder","href":"/api-reference/generators/oauth-authorization-url-builder"},{"title":"OTP Code Generator API","deprecated":null,"version":null,"sidebarTitle":"OTP Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/otp-code-generator","href":"/api-reference/generators/otp-code-generator"},{"title":"package.json Generator API","deprecated":null,"version":null,"sidebarTitle":"package.json Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/package-json-generator","href":"/api-reference/generators/packagejson-generator"},{"title":"Passphrase Generator API","deprecated":null,"version":null,"sidebarTitle":"Passphrase Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/passphrase-generator","href":"/api-reference/generators/passphrase-generator"},{"title":"PBKDF2 Key Generator API","deprecated":null,"version":null,"sidebarTitle":"PBKDF2 Key Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pbkdf2-key-generator","href":"/api-reference/generators/pbkdf2-key-generator"},{"title":"Pi Generator API","deprecated":null,"version":null,"sidebarTitle":"Pi Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pi-generator","href":"/api-reference/generators/pi-generator"},{"title":"PKCE Code Verifier \u0026 Challenge Generator API","deprecated":null,"version":null,"sidebarTitle":"PKCE Code Verifier \u0026 Challenge Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pkce-code-verifier-challenge-generator","href":"/api-reference/generators/pkce-code-verifier-\u0026-challenge-generator"},{"title":"Electronic Invoice Generator API","deprecated":null,"version":null,"sidebarTitle":"Electronic Invoice Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/create-electronic-invoice","href":"/api-reference/generators/electronic-invoice-generator"},{"title":"Prettier Config Generator API","deprecated":null,"version":null,"sidebarTitle":"Prettier Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/prettier-config-generator","href":"/api-reference/generators/prettier-config-generator"},{"title":"Prometheus Alerting Rule Generator API","deprecated":null,"version":null,"sidebarTitle":"Prometheus Alerting Rule Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/prometheus-alerting-rule-generator","href":"/api-reference/generators/prometheus-alerting-rule-generator"},{"title":"PWA Web App Manifest Generator API","deprecated":null,"version":null,"sidebarTitle":"PWA Web App Manifest Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pwa-web-app-manifest-generator","href":"/api-reference/generators/pwa-web-app-manifest-generator"},{"title":"SSH Key Generator API","deprecated":null,"version":null,"sidebarTitle":"SSH Key Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ssh-key-generator","href":"/api-reference/generators/ssh-key-generator"},{"title":"MD5 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"MD5 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/md5-hash-generator","href":"/api-reference/generators/md5-hash-generator"},{"title":"SHA Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"SHA Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sha-hash-generator","href":"/api-reference/generators/sha-hash-generator"},{"title":"MAC Address Generator API","deprecated":null,"version":null,"sidebarTitle":"MAC Address Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mac-address-generator","href":"/api-reference/generators/mac-address-generator"},{"title":"AI Name Generator API","deprecated":null,"version":null,"sidebarTitle":"AI Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator","href":"/api-reference/generators/ai-name-generator"},{"title":"Aarakocra Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Aarakocra Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/aarakocra-names","href":"/api-reference/generators/aarakocra-name-generator"},{"title":"Aasimar Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Aasimar Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/aasimar-names","href":"/api-reference/generators/aasimar-name-generator"},{"title":"Album Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Album Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/album-names","href":"/api-reference/generators/album-name-generator"},{"title":"Angel Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Angel Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/angel-names","href":"/api-reference/generators/angel-name-generator"},{"title":"Animal Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Animal Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/animal-names","href":"/api-reference/generators/animal-name-generator"},{"title":"Arabic Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Arabic Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/arabic-names","href":"/api-reference/generators/arabic-name-generator"},{"title":"Baby Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Baby Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/baby-names","href":"/api-reference/generators/baby-name-generator"},{"title":"Bakery Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Bakery Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/bakery-names","href":"/api-reference/generators/bakery-name-generator"},{"title":"Barbarian Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Barbarian Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/barbarian-names","href":"/api-reference/generators/barbarian-name-generator"},{"title":"Blood Elf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Blood Elf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/blood-elf-names","href":"/api-reference/generators/blood-elf-name-generator"},{"title":"Blood Hunter Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Blood Hunter Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/blood-hunter-names","href":"/api-reference/generators/blood-hunter-name-generator"},{"title":"Book Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Book Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/book-names","href":"/api-reference/generators/book-name-generator"},{"title":"British Girl Name Generator API","deprecated":null,"version":null,"sidebarTitle":"British Girl Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/british-girl-names","href":"/api-reference/generators/british-girl-name-generator"},{"title":"Cafe Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Cafe Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/cafe-names","href":"/api-reference/generators/cafe-name-generator"},{"title":"Changeling Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Changeling Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/changeling-names","href":"/api-reference/generators/changeling-name-generator"},{"title":"Chicken Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Chicken Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/chicken-names","href":"/api-reference/generators/chicken-name-generator"},{"title":"Continent Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Continent Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/continent-names","href":"/api-reference/generators/continent-name-generator"},{"title":"Country Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Country Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/country-names","href":"/api-reference/generators/country-name-generator"},{"title":"Couple Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Couple Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/couple-names","href":"/api-reference/generators/couple-name-generator"},{"title":"Cow Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Cow Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/cow-names","href":"/api-reference/generators/cow-name-generator"},{"title":"Dark Elf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Dark Elf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/dark-elf-names","href":"/api-reference/generators/dark-elf-name-generator"},{"title":"Demon Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Demon Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/demon-names","href":"/api-reference/generators/demon-name-generator"},{"title":"Discord Username Generator API","deprecated":null,"version":null,"sidebarTitle":"Discord Username Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/discord-names","href":"/api-reference/generators/discord-username-generator"},{"title":"Dragon Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Dragon Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/dragon-names","href":"/api-reference/generators/dragon-name-generator"},{"title":"Dragonborn Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Dragonborn Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/dragonborn-names","href":"/api-reference/generators/dragonborn-name-generator"},{"title":"Drow Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Drow Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/drow-names","href":"/api-reference/generators/drow-name-generator"},{"title":"Druid Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Druid Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/druid-names","href":"/api-reference/generators/druid-name-generator"},{"title":"Dwarf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Dwarf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/dwarf-names","href":"/api-reference/generators/dwarf-name-generator"},{"title":"Elf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Elf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/elf-names","href":"/api-reference/generators/elf-name-generator"},{"title":"Fairy Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Fairy Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/fairy-names","href":"/api-reference/generators/fairy-name-generator"},{"title":"Fantasy City Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Fantasy City Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/fantasy-city-names","href":"/api-reference/generators/fantasy-city-name-generator"},{"title":"Fantasy Town Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Fantasy Town Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/fantasy-town-names","href":"/api-reference/generators/fantasy-town-name-generator"},{"title":"Firbolg Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Firbolg Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/firbolg-names","href":"/api-reference/generators/firbolg-name-generator"},{"title":"French Name Generator API","deprecated":null,"version":null,"sidebarTitle":"French Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/french-names","href":"/api-reference/generators/french-name-generator"},{"title":"German Name Generator API","deprecated":null,"version":null,"sidebarTitle":"German Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/german-names","href":"/api-reference/generators/german-name-generator"},{"title":"Githyanki Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Githyanki Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/githyanki-names","href":"/api-reference/generators/githyanki-name-generator"},{"title":"Gnome Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Gnome Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/gnome-names","href":"/api-reference/generators/gnome-name-generator"},{"title":"Goblin Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Goblin Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/goblin-names","href":"/api-reference/generators/goblin-name-generator"},{"title":"Greek Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Greek Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/greek-names","href":"/api-reference/generators/greek-name-generator"},{"title":"Half-Elf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Half-Elf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/half-elf-names","href":"/api-reference/generators/half-elf-name-generator"},{"title":"Half-Orc Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Half-Orc Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/half-orc-names","href":"/api-reference/generators/half-orc-name-generator"},{"title":"Halfling Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Halfling Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/halfling-names","href":"/api-reference/generators/halfling-name-generator"},{"title":"Harry Potter Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Harry Potter Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/harry-potter-names","href":"/api-reference/generators/harry-potter-name-generator"},{"title":"High-Elf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"High-Elf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/high-elf-names","href":"/api-reference/generators/high-elf-name-generator"},{"title":"Human Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Human Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/human-names","href":"/api-reference/generators/human-name-generator"},{"title":"Island Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Island Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/island-names","href":"/api-reference/generators/island-name-generator"},{"title":"Japanese Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Japanese Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/japanese-names","href":"/api-reference/generators/japanese-name-generator"},{"title":"Kenku Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Kenku Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/kenku-name-generator","href":"/api-reference/generators/kenku-name-generator"},{"title":"Kingdom Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Kingdom Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/kingdom-names","href":"/api-reference/generators/kingdom-name-generator"},{"title":"Kitsune Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Kitsune Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/kitsune-names","href":"/api-reference/generators/kitsune-name-generator"},{"title":"Knight Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Knight Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/knight-names","href":"/api-reference/generators/knight-name-generator"},{"title":"Kobold Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Kobold Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/kobold-names","href":"/api-reference/generators/kobold-name-generator"},{"title":"Korean Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Korean Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/korean-names","href":"/api-reference/generators/korean-name-generator"},{"title":"Last Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Last Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/last-names","href":"/api-reference/generators/last-name-generator"},{"title":"Legendary Creature Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Legendary Creature Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/legendary-creature-names","href":"/api-reference/generators/legendary-creature-name-generator"},{"title":"Mage Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Mage Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/mage-names","href":"/api-reference/generators/mage-name-generator"},{"title":"Mermaid Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Mermaid Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/mermaid-names","href":"/api-reference/generators/mermaid-name-generator"},{"title":"Middle Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Middle Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/middle-names","href":"/api-reference/generators/middle-name-generator"},{"title":"Norse Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Norse Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/norse-names","href":"/api-reference/generators/norse-name-generator"},{"title":"Orc Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Orc Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/orc-names","href":"/api-reference/generators/orc-name-generator"},{"title":"Project Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Project Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/project-names","href":"/api-reference/generators/project-name-generator"},{"title":"Realistic Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Realistic Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/random-names","href":"/api-reference/generators/realistic-name-generator"},{"title":"Restaurant Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Restaurant Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/restaurant-names","href":"/api-reference/generators/restaurant-name-generator"},{"title":"Roman Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Roman Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/roman-names","href":"/api-reference/generators/roman-name-generator"},{"title":"Samurai Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Samurai Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/samurai-names","href":"/api-reference/generators/samurai-name-generator"},{"title":"School Name Generator API","deprecated":null,"version":null,"sidebarTitle":"School Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/school-names","href":"/api-reference/generators/school-name-generator"},{"title":"Ship Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Ship Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/ship-names","href":"/api-reference/generators/ship-name-generator"},{"title":"Song Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Song Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/song-names","href":"/api-reference/generators/song-name-generator"},{"title":"Spanish Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Spanish Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/spanish-names","href":"/api-reference/generators/spanish-name-generator"},{"title":"Species Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Species Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/species-names","href":"/api-reference/generators/species-name-generator"},{"title":"Succubus Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Succubus Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/succubus-names","href":"/api-reference/generators/succubus-name-generator"},{"title":"Superhero Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Superhero Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/superhero-names","href":"/api-reference/generators/superhero-name-generator"},{"title":"Tabaxi Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Tabaxi Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/tabaxi-names","href":"/api-reference/generators/tabaxi-name-generator"},{"title":"Team Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Team Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/team-names","href":"/api-reference/generators/team-name-generator"},{"title":"Tiefling Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Tiefling Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/tiefling-names","href":"/api-reference/generators/tiefling-name-generator"},{"title":"Troll Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Troll Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/troll-names","href":"/api-reference/generators/troll-name-generator"},{"title":"Vampire Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Vampire Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/vampire-names","href":"/api-reference/generators/vampire-name-generator"},{"title":"Warforged Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Warforged Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/warforged-names","href":"/api-reference/generators/warforged-name-generator"},{"title":"Warrior Cat Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Warrior Cat Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/warrior-cat-names","href":"/api-reference/generators/warrior-cat-name-generator"},{"title":"Werewolf Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Werewolf Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/werewolf-names","href":"/api-reference/generators/werewolf-name-generator"},{"title":"Witch Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Witch Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/witch-names","href":"/api-reference/generators/witch-name-generator"},{"title":"Wizard Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Wizard Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/wizard-names","href":"/api-reference/generators/wizard-name-generator"},{"title":"World Name Generator API","deprecated":null,"version":null,"sidebarTitle":"World Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/world-names","href":"/api-reference/generators/world-name-generator"},{"title":"Yuan-ti Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Yuan-ti Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/name-generator/yuan-ti-names","href":"/api-reference/generators/yuan-ti-name-generator"},{"title":"Password Generator API","deprecated":null,"version":null,"sidebarTitle":"Password Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/password-generator","href":"/api-reference/generators/password-generator"},{"title":"Phone Number Generator API","deprecated":null,"version":null,"sidebarTitle":"Phone Number Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/phone-number-generator","href":"/api-reference/generators/phone-number-generator"},{"title":"QR Code Generator API","deprecated":null,"version":null,"sidebarTitle":"QR Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/qr-code-generator","href":"/api-reference/generators/qr-code-generator"},{"title":"Batch QR Code Generator API","deprecated":null,"version":null,"sidebarTitle":"Batch QR Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/batch-qr-code-generator","href":"/api-reference/generators/batch-qr-code-generator"},{"title":"Random Address Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Address Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-address-generator","href":"/api-reference/generators/random-address-generator"},{"title":"Random Bitcoin Address Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Bitcoin Address Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-bitcoin-address-generator","href":"/api-reference/generators/random-bitcoin-address-generator"},{"title":"Random Color Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Color Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-color-generator","href":"/api-reference/generators/random-color-generator"},{"title":"Random Date Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Date Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-date-generator","href":"/api-reference/generators/random-date-generator"},{"title":"Random Email Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Email Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-email-generator","href":"/api-reference/generators/random-email-generator"},{"title":"Random Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator","href":"/api-reference/generators/random-generator"},{"title":"Random Number Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Number Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/numbers","href":"/api-reference/generators/random-number-generator"},{"title":"Random Animal Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Animal Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-animals","href":"/api-reference/generators/random-animal-generator"},{"title":"Random Birthday Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Birthday Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-birthday","href":"/api-reference/generators/random-birthday-generator"},{"title":"Random Celebrity Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Celebrity Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-celebrities","href":"/api-reference/generators/random-celebrity-generator"},{"title":"Random Food Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Food Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-foods","href":"/api-reference/generators/random-food-generator"},{"title":"Random MLB Team Generator API","deprecated":null,"version":null,"sidebarTitle":"Random MLB Team Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-mlb-teams","href":"/api-reference/generators/random-mlb-team-generator"},{"title":"Random Movie Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Movie Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-movies","href":"/api-reference/generators/random-movie-generator"},{"title":"Random Name Picker API","deprecated":null,"version":null,"sidebarTitle":"Random Name Picker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-name-picker","href":"/api-reference/generators/random-name-picker"},{"title":"Random NBA Team Generator API","deprecated":null,"version":null,"sidebarTitle":"Random NBA Team Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-nba-teams","href":"/api-reference/generators/random-nba-team-generator"},{"title":"Random NFL Team Generator API","deprecated":null,"version":null,"sidebarTitle":"Random NFL Team Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-nfl-teams","href":"/api-reference/generators/random-nfl-team-generator"},{"title":"Random Object Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Object Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-objects","href":"/api-reference/generators/random-object-generator"},{"title":"Random Quote Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Quote Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-quotes","href":"/api-reference/generators/random-quote-generator"},{"title":"Random Team Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Team Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-team-generator","href":"/api-reference/generators/random-team-generator"},{"title":"Random US Zip Code Generator API","deprecated":null,"version":null,"sidebarTitle":"Random US Zip Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-generator/random-us-zip-codes","href":"/api-reference/generators/random-us-zip-code-generator"},{"title":"Random Letter Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Letter Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-letter-generator","href":"/api-reference/generators/random-letter-generator"},{"title":"Random Playing Card Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Playing Card Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-playing-card-generator","href":"/api-reference/generators/random-playing-card-generator"},{"title":"Random Pokémon Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Pokémon Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-pokemon-generator","href":"/api-reference/generators/random-pokémon-generator"},{"title":"Random Port Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Port Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-port-generator","href":"/api-reference/generators/random-port-generator"},{"title":"Random Name Generator API","deprecated":null,"version":null,"sidebarTitle":"Random Name Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/random-name-generator","href":"/api-reference/generators/random-name-generator"},{"title":"Yes or No API","deprecated":null,"version":null,"sidebarTitle":"Yes or No","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yes-or-no","href":"/api-reference/generators/yes-or-no"},{"title":"React Native Shadow Generator API","deprecated":null,"version":null,"sidebarTitle":"React Native Shadow Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/react-native-shadow-generator","href":"/api-reference/generators/react-native-shadow-generator"},{"title":"README Badge Generator API","deprecated":null,"version":null,"sidebarTitle":"README Badge Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/readme-badge-generator","href":"/api-reference/generators/readme-badge-generator"},{"title":"Regex Sample String Generator API","deprecated":null,"version":null,"sidebarTitle":"Regex Sample String Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/regex-sample-generator","href":"/api-reference/generators/regex-sample-string-generator"},{"title":"Responsive Image srcset/sizes Generator API","deprecated":null,"version":null,"sidebarTitle":"Responsive Image srcset/sizes Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/responsive-image-srcset-sizes-generator","href":"/api-reference/generators/responsive-image-srcsetsizes-generator"},{"title":"Review Generator API","deprecated":null,"version":null,"sidebarTitle":"Review Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/review-generator","href":"/api-reference/generators/review-generator"},{"title":"RIPEMD-160 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"RIPEMD-160 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ripemd-160-hash-generator","href":"/api-reference/generators/ripemd-160-hash-generator"},{"title":"Robots.txt Generator API","deprecated":null,"version":null,"sidebarTitle":"Robots.txt Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/robots-txt-generator","href":"/api-reference/generators/robotstxt-generator"},{"title":"Routing Number Generator API","deprecated":null,"version":null,"sidebarTitle":"Routing Number Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/routing-number-generator","href":"/api-reference/generators/routing-number-generator"},{"title":"RSS / Atom Feed Generator API","deprecated":null,"version":null,"sidebarTitle":"RSS / Atom Feed Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rss-atom-feed-generator","href":"/api-reference/generators/rss-atom-feed-generator"},{"title":"Sitemap XML Generator API","deprecated":null,"version":null,"sidebarTitle":"Sitemap XML Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sitemap-xml-generator","href":"/api-reference/generators/sitemap-xml-generator"},{"title":"SPF / DKIM / DMARC Record Generator API","deprecated":null,"version":null,"sidebarTitle":"SPF / DKIM / DMARC Record Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/spf-dkim-dmarc-record-generator","href":"/api-reference/generators/spf-dkim-dmarc-record-generator"},{"title":"Redirect Rules Generator API","deprecated":null,"version":null,"sidebarTitle":"Redirect Rules Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/redirect-rules-generator","href":"/api-reference/generators/redirect-rules-generator"},{"title":"RSA Key Generator API","deprecated":null,"version":null,"sidebarTitle":"RSA Key Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rsa-key-generator","href":"/api-reference/generators/rsa-key-generator"},{"title":"Share Links Generator API","deprecated":null,"version":null,"sidebarTitle":"Share Links Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/share-links-generator","href":"/api-reference/generators/share-links-generator"},{"title":"Slug Generator API","deprecated":null,"version":null,"sidebarTitle":"Slug Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slug-generator","href":"/api-reference/generators/slug-generator"},{"title":"TFN Generator API","deprecated":null,"version":null,"sidebarTitle":"TFN Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tfn-generator","href":"/api-reference/generators/tfn-generator"},{"title":"Token Generator API","deprecated":null,"version":null,"sidebarTitle":"Token Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/token-generator","href":"/api-reference/generators/token-generator"},{"title":"vCard Contact File Generator API","deprecated":null,"version":null,"sidebarTitle":"vCard Contact File Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vcard-contact-file-generator","href":"/api-reference/generators/vcard-contact-file-generator"},{"title":"VIN Generator API","deprecated":null,"version":null,"sidebarTitle":"VIN Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vin-generator","href":"/api-reference/generators/vin-generator"},{"title":"Vite Config Generator API","deprecated":null,"version":null,"sidebarTitle":"Vite Config Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vite-config-generator","href":"/api-reference/generators/vite-config-generator"},{"title":"WebAuthn Credential Generator API","deprecated":null,"version":null,"sidebarTitle":"WebAuthn Credential Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/webauthn-credential-generator","href":"/api-reference/generators/webauthn-credential-generator"},{"title":"Webhook Test Payload Generator API","deprecated":null,"version":null,"sidebarTitle":"Webhook Test Payload Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/webhook-test-payload-generator","href":"/api-reference/generators/webhook-test-payload-generator"},{"title":"Weighted Random Picker API","deprecated":null,"version":null,"sidebarTitle":"Weighted Random Picker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/weighted-random-picker","href":"/api-reference/generators/weighted-random-picker"},{"title":"WhatsApp Chat Generator API","deprecated":null,"version":null,"sidebarTitle":"WhatsApp Chat Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/whatsapp-chat-generator","href":"/api-reference/generators/whatsapp-chat-generator"},{"title":"Word Cloud Generator API","deprecated":null,"version":null,"sidebarTitle":"Word Cloud Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/word-cloud-generator","href":"/api-reference/generators/word-cloud-generator"},{"title":"Word Combiner API","deprecated":null,"version":null,"sidebarTitle":"Word Combiner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/word-combiner","href":"/api-reference/generators/word-combiner"},{"title":"XSD Generator API","deprecated":null,"version":null,"sidebarTitle":"XSD Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xsd-generator","href":"/api-reference/generators/xsd-generator"},{"title":"UUID Generator API","deprecated":null,"version":null,"sidebarTitle":"UUID Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/uuid-generator","href":"/api-reference/generators/uuid-generator"},{"title":"Word Generator API","deprecated":null,"version":null,"sidebarTitle":"Word Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/word-generator","href":"/api-reference/generators/word-generator"},{"title":"Zalgo Text Generator API","deprecated":null,"version":null,"sidebarTitle":"Zalgo Text Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/zalgo-text-generator","href":"/api-reference/generators/zalgo-text-generator"},{"title":"ULID Generator API","deprecated":null,"version":null,"sidebarTitle":"ULID Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ulid-generator","href":"/api-reference/generators/ulid-generator"},{"title":"Roll The Dice API","deprecated":null,"version":null,"sidebarTitle":"Roll The Dice","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/roll-the-dice","href":"/api-reference/generators/roll-the-dice"},{"title":"Tarot Birth Card Calculator API","deprecated":null,"version":null,"sidebarTitle":"Tarot Birth Card Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tarot-birth-card","href":"/api-reference/generators/tarot-birth-card-calculator"},{"title":"SVG Sprite Sheet Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Sprite Sheet Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-sprite-sheet-generator","href":"/api-reference/generators/svg-sprite-sheet-generator"},{"title":"SVG Wave Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Wave Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-wave-generator","href":"/api-reference/generators/svg-wave-generator"},{"title":"SVG Blob Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Blob Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-blob-generator","href":"/api-reference/generators/svg-blob-generator"},{"title":"SHA-3 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"SHA-3 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sha3-hash-generator","href":"/api-reference/generators/sha-3-hash-generator"},{"title":"Keccak Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"Keccak Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/keccak-hash-generator","href":"/api-reference/generators/keccak-hash-generator"},{"title":"SHAKE256 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"SHAKE256 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/shake256-hash-generator","href":"/api-reference/generators/shake256-hash-generator"},{"title":"Double SHA-256 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"Double SHA-256 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/double-sha256-hash-generator","href":"/api-reference/generators/double-sha-256-hash-generator"},{"title":"BLAKE2 Hash Generator API","deprecated":null,"version":null,"sidebarTitle":"BLAKE2 Hash Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/blake2-hash-generator","href":"/api-reference/generators/blake2-hash-generator"},{"title":"Small Text Generator API","deprecated":null,"version":null,"sidebarTitle":"Small Text Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/small-text-generator","href":"/api-reference/generators/small-text-generator"},{"title":"Snowflake ID Generator API","deprecated":null,"version":null,"sidebarTitle":"Snowflake ID Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/snowflake-id-generator","href":"/api-reference/generators/snowflake-id-generator"},{"title":"SQL CREATE TABLE Generator API","deprecated":null,"version":null,"sidebarTitle":"SQL CREATE TABLE Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sql-create-table-generator","href":"/api-reference/generators/sql-create-table-generator"},{"title":"SSH Config File Generator API","deprecated":null,"version":null,"sidebarTitle":"SSH Config File Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ssh-config-file-generator","href":"/api-reference/generators/ssh-config-file-generator"},{"title":"SVG Filter Effects Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Filter Effects Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-filter-effects-generator","href":"/api-reference/generators/svg-filter-effects-generator"},{"title":"SVG Loading Spinner Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Loading Spinner Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-loading-spinner-generator","href":"/api-reference/generators/svg-loading-spinner-generator"},{"title":"SVG Noise Texture Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Noise Texture Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-noise-texture-generator","href":"/api-reference/generators/svg-noise-texture-generator"},{"title":"SVG Pattern Generator API","deprecated":null,"version":null,"sidebarTitle":"SVG Pattern Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-pattern-generator","href":"/api-reference/generators/svg-pattern-generator"},{"title":"Tailwind CSS Color Scale Generator API","deprecated":null,"version":null,"sidebarTitle":"Tailwind CSS Color Scale Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tailwind-css-color-scale-generator","href":"/api-reference/generators/tailwind-css-color-scale-generator"},{"title":"tsconfig.json Generator API","deprecated":null,"version":null,"sidebarTitle":"tsconfig.json Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tsconfig-json-generator","href":"/api-reference/generators/tsconfigjson-generator"},{"title":"Username Generator API","deprecated":null,"version":null,"sidebarTitle":"Username Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/username-generator","href":"/api-reference/generators/username-generator"},{"title":"Article Rewriter API","deprecated":null,"version":null,"sidebarTitle":"Article Rewriter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/article-rewriter","href":"/api-reference/generators/article-rewriter"},{"title":"Paraphrasing Tool API","deprecated":null,"version":null,"sidebarTitle":"Paraphrasing Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/paraphrasing-tool","href":"/api-reference/generators/paraphrasing-tool"},{"title":"Aztec Code Generator API","deprecated":null,"version":null,"sidebarTitle":"Aztec Code Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/aztec-code-generator","href":"/api-reference/generators/aztec-code-generator"},{"title":"Data Matrix Generator API","deprecated":null,"version":null,"sidebarTitle":"Data Matrix Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/data-matrix-generator","href":"/api-reference/generators/data-matrix-generator"},{"title":"PDF417 Barcode Generator API","deprecated":null,"version":null,"sidebarTitle":"PDF417 Barcode Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf417-barcode-generator","href":"/api-reference/generators/pdf417-barcode-generator"},{"title":"AI Color Palette Generator API","deprecated":null,"version":null,"sidebarTitle":"AI Color Palette Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-color-palette-generator","href":"/api-reference/generators/ai-color-palette-generator"},{"title":"Resume Builder API","deprecated":null,"version":null,"sidebarTitle":"Resume Builder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/resume-builder","href":"/api-reference/generators/resume-builder"},{"title":"CODEOWNERS Generator API","deprecated":null,"version":null,"sidebarTitle":"CODEOWNERS Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/codeowners-generator","href":"/api-reference/generators/codeowners-generator"},{"title":"Web Resource Hints Generator API","deprecated":null,"version":null,"sidebarTitle":"Web Resource Hints Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/web-resource-hints-generator","href":"/api-reference/generators/web-resource-hints-generator"}]},{"group":"Calculators","pages":[{"title":"1099 vs W2 Income Comparison Calculator API","deprecated":null,"version":null,"sidebarTitle":"1099 vs W2 Income Comparison Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/1099-vs-w2-income-comparison-calculator","href":"/api-reference/calculators/1099-vs-w2-income-comparison-calculator"},{"title":"3D Printing Filament \u0026 Time Estimator API","deprecated":null,"version":null,"sidebarTitle":"3D Printing Filament \u0026 Time Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/3d-printing-filament-time-estimator","href":"/api-reference/calculators/3d-printing-filament-\u0026-time-estimator"},{"title":"A/B Test Sample Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"A/B Test Sample Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ab-test-sample-size-calculator","href":"/api-reference/calculators/ab-test-sample-size-calculator"},{"title":"A/B Test Significance Calculator API","deprecated":null,"version":null,"sidebarTitle":"A/B Test Significance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ab-test-significance-calculator","href":"/api-reference/calculators/ab-test-significance-calculator"},{"title":"Absolute Value Calculator API","deprecated":null,"version":null,"sidebarTitle":"Absolute Value Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/absolute-value-calculator","href":"/api-reference/calculators/absolute-value-calculator"},{"title":"Absolute Value Equation Solver API","deprecated":null,"version":null,"sidebarTitle":"Absolute Value Equation Solver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/absolute-value-equation-solver","href":"/api-reference/calculators/absolute-value-equation-solver"},{"title":"Absolute Value Inequality Solver API","deprecated":null,"version":null,"sidebarTitle":"Absolute Value Inequality Solver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/absolute-value-inequality-solver","href":"/api-reference/calculators/absolute-value-inequality-solver"},{"title":"Acreage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Acreage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/acreage-calculator","href":"/api-reference/calculators/acreage-calculator"},{"title":"Concrete Mix Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Concrete Mix Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/concrete-mix-ratio-calculator","href":"/api-reference/calculators/concrete-mix-ratio-calculator"},{"title":"Footing Sizing Estimator API","deprecated":null,"version":null,"sidebarTitle":"Footing Sizing Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/footing-sizing-estimator","href":"/api-reference/calculators/footing-sizing-estimator"},{"title":"Seismic Base Shear Estimator API","deprecated":null,"version":null,"sidebarTitle":"Seismic Base Shear Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/seismic-base-shear-estimator","href":"/api-reference/calculators/seismic-base-shear-estimator"},{"title":"Tank Fill Drain Time Calculator API","deprecated":null,"version":null,"sidebarTitle":"Tank Fill Drain Time Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tank-fill-drain-time-calculator","href":"/api-reference/calculators/tank-fill-drain-time-calculator"},{"title":"Actual Cash Value Calculator API","deprecated":null,"version":null,"sidebarTitle":"Actual Cash Value Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/actual-cash-value-calculator","href":"/api-reference/calculators/actual-cash-value-calculator"},{"title":"ADC / DAC Converter Calculator API","deprecated":null,"version":null,"sidebarTitle":"ADC / DAC Converter Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/adc-dac-converter-calculator","href":"/api-reference/calculators/adc-dac-converter-calculator"},{"title":"Age Calculator API","deprecated":null,"version":null,"sidebarTitle":"Age Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/age-calculator","href":"/api-reference/calculators/age-calculator"},{"title":"Angel Number Calculator API","deprecated":null,"version":null,"sidebarTitle":"Angel Number Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/angel-number-calculator","href":"/api-reference/calculators/angel-number-calculator"},{"title":"Angle Bisector Calculator API","deprecated":null,"version":null,"sidebarTitle":"Angle Bisector Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/angle-bisector-calculator","href":"/api-reference/calculators/angle-bisector-calculator"},{"title":"Antilog Calculator API","deprecated":null,"version":null,"sidebarTitle":"Antilog Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/antilog-calculator","href":"/api-reference/calculators/antilog-calculator"},{"title":"APY Calculator API","deprecated":null,"version":null,"sidebarTitle":"APY Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/apy-calculator","href":"/api-reference/calculators/apy-calculator"},{"title":"Aquarium Heater Wattage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Aquarium Heater Wattage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/aquarium-heater-wattage-calculator","href":"/api-reference/calculators/aquarium-heater-wattage-calculator"},{"title":"Aquarium Substrate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Aquarium Substrate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/aquarium-substrate-calculator","href":"/api-reference/calculators/aquarium-substrate-calculator"},{"title":"Area of a Parallelogram Calculator API","deprecated":null,"version":null,"sidebarTitle":"Area of a Parallelogram Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/area-of-a-parallelogram-calculator","href":"/api-reference/calculators/area-of-a-parallelogram-calculator"},{"title":"Area of a Sector Calculator API","deprecated":null,"version":null,"sidebarTitle":"Area of a Sector Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/area-of-a-sector-calculator","href":"/api-reference/calculators/area-of-a-sector-calculator"},{"title":"Area of Square Calculator API","deprecated":null,"version":null,"sidebarTitle":"Area of Square Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/area-of-square-calculator","href":"/api-reference/calculators/area-of-square-calculator"},{"title":"Area \u0026 Perimeter Calculator API","deprecated":null,"version":null,"sidebarTitle":"Area \u0026 Perimeter Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/area-perimeter-calculator","href":"/api-reference/calculators/area-\u0026-perimeter-calculator"},{"title":"Aspect Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Aspect Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/aspect-ratio-calculator","href":"/api-reference/calculators/aspect-ratio-calculator"},{"title":"Asphalt Calculator API","deprecated":null,"version":null,"sidebarTitle":"Asphalt Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/asphalt-calculator","href":"/api-reference/calculators/asphalt-calculator"},{"title":"Attendance Percentage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Attendance Percentage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/attendance-percentage-calculator","href":"/api-reference/calculators/attendance-percentage-calculator"},{"title":"Audio File Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Audio File Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/audio-file-size-calculator","href":"/api-reference/calculators/audio-file-size-calculator"},{"title":"Average Rate of Change Calculator API","deprecated":null,"version":null,"sidebarTitle":"Average Rate of Change Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/average-rate-of-change-calculator","href":"/api-reference/calculators/average-rate-of-change-calculator"},{"title":"Baking Pan Size Converter API","deprecated":null,"version":null,"sidebarTitle":"Baking Pan Size Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/baking-pan-size-converter","href":"/api-reference/calculators/baking-pan-size-converter"},{"title":"Bandwidth \u0026 Download Time Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bandwidth \u0026 Download Time Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bandwidth-download-calculator","href":"/api-reference/calculators/bandwidth-\u0026-download-time-calculator"},{"title":"Battery Life / Runtime Calculator API","deprecated":null,"version":null,"sidebarTitle":"Battery Life / Runtime Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/battery-life-runtime-calculator","href":"/api-reference/calculators/battery-life-runtime-calculator"},{"title":"Batting Average Calculator API","deprecated":null,"version":null,"sidebarTitle":"Batting Average Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/batting-average-calculator","href":"/api-reference/calculators/batting-average-calculator"},{"title":"Beading Pattern Calculator API","deprecated":null,"version":null,"sidebarTitle":"Beading Pattern Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/beading-pattern-calculator","href":"/api-reference/calculators/beading-pattern-calculator"},{"title":"Beam Deflection Calculator API","deprecated":null,"version":null,"sidebarTitle":"Beam Deflection Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/beam-deflection-calculator","href":"/api-reference/calculators/beam-deflection-calculator"},{"title":"Beam Load Calculator API","deprecated":null,"version":null,"sidebarTitle":"Beam Load Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/beam-load-calculator","href":"/api-reference/calculators/beam-load-calculator"},{"title":"Bearing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bearing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bearing-calculator","href":"/api-reference/calculators/bearing-calculator"},{"title":"Bearing Distance Resection Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bearing Distance Resection Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bearing-distance-resection-calculator","href":"/api-reference/calculators/bearing-distance-resection-calculator"},{"title":"Bearing Life Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bearing Life Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bearing-life-calculator","href":"/api-reference/calculators/bearing-life-calculator"},{"title":"Belt Length Calculator API","deprecated":null,"version":null,"sidebarTitle":"Belt Length Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/belt-length-calculator","href":"/api-reference/calculators/belt-length-calculator"},{"title":"Bicycle Gear Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bicycle Gear Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bicycle-gear-ratio-calculator","href":"/api-reference/calculators/bicycle-gear-ratio-calculator"},{"title":"Big Integer Calculator API","deprecated":null,"version":null,"sidebarTitle":"Big Integer Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/big-integer-calculator","href":"/api-reference/calculators/big-integer-calculator"},{"title":"Binomial Theorem Expansion Calculator API","deprecated":null,"version":null,"sidebarTitle":"Binomial Theorem Expansion Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/binomial-theorem-expansion-calculator","href":"/api-reference/calculators/binomial-theorem-expansion-calculator"},{"title":"Biological Age Calculator API","deprecated":null,"version":null,"sidebarTitle":"Biological Age Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/biological-age-calculator","href":"/api-reference/calculators/biological-age-calculator"},{"title":"Bird Cage Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bird Cage Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bird-cage-size-calculator","href":"/api-reference/calculators/bird-cage-size-calculator"},{"title":"Bitcoin Investment Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bitcoin Investment Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bitcoin-investment-calculator","href":"/api-reference/calculators/bitcoin-investment-calculator"},{"title":"Bitwise Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bitwise Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bitwise-calculator","href":"/api-reference/calculators/bitwise-calculator"},{"title":"Bitwise Shift Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bitwise Shift Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bitwise-shift-calculator","href":"/api-reference/calculators/bitwise-shift-calculator"},{"title":"Black-Scholes Option Pricing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Black-Scholes Option Pricing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/black-scholes-option-pricing-calculator","href":"/api-reference/calculators/black-scholes-option-pricing-calculator"},{"title":"Blood Alcohol Content (BAC) Estimator API","deprecated":null,"version":null,"sidebarTitle":"Blood Alcohol Content (BAC) Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/blood-alcohol-content-estimator","href":"/api-reference/calculators/blood-alcohol-content-bac-estimator"},{"title":"Blood Sugar Converter API","deprecated":null,"version":null,"sidebarTitle":"Blood Sugar Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/blood-sugar-converter","href":"/api-reference/calculators/blood-sugar-converter"},{"title":"BMI Calculator API","deprecated":null,"version":null,"sidebarTitle":"BMI Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bmi-calculator","href":"/api-reference/calculators/bmi-calculator"},{"title":"Bolt Torque Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bolt Torque Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bolt-torque-calculator","href":"/api-reference/calculators/bolt-torque-calculator"},{"title":"Cable Tray Fill Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cable Tray Fill Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cable-tray-fill-calculator","href":"/api-reference/calculators/cable-tray-fill-calculator"},{"title":"BMR \u0026 TDEE Calculator API","deprecated":null,"version":null,"sidebarTitle":"BMR \u0026 TDEE Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bmr-tdee-calculator","href":"/api-reference/calculators/bmr-\u0026-tdee-calculator"},{"title":"Compressor Power Estimator API","deprecated":null,"version":null,"sidebarTitle":"Compressor Power Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/compressor-power-estimator","href":"/api-reference/calculators/compressor-power-estimator"},{"title":"FENa Calculator API","deprecated":null,"version":null,"sidebarTitle":"FENa Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fena-calculator","href":"/api-reference/calculators/fena-calculator"},{"title":"Corrected Sodium Calculator API","deprecated":null,"version":null,"sidebarTitle":"Corrected Sodium Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/corrected-sodium-calculator","href":"/api-reference/calculators/corrected-sodium-calculator"},{"title":"Board Foot Calculator API","deprecated":null,"version":null,"sidebarTitle":"Board Foot Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/board-foot-calculator","href":"/api-reference/calculators/board-foot-calculator"},{"title":"Body Fat Calculator API","deprecated":null,"version":null,"sidebarTitle":"Body Fat Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/body-fat-calculator","href":"/api-reference/calculators/body-fat-calculator"},{"title":"Boiling Point Calculator API","deprecated":null,"version":null,"sidebarTitle":"Boiling Point Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/boiling-point-calculator","href":"/api-reference/calculators/boiling-point-calculator"},{"title":"Bond Convexity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bond Convexity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bond-convexity-calculator","href":"/api-reference/calculators/bond-convexity-calculator"},{"title":"Bond Duration Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bond Duration Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bond-duration-calculator","href":"/api-reference/calculators/bond-duration-calculator"},{"title":"Bond Equivalent Yield Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bond Equivalent Yield Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bond-equivalent-yield-calculator","href":"/api-reference/calculators/bond-equivalent-yield-calculator"},{"title":"Bond Yield to Maturity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bond Yield to Maturity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bond-yield-to-maturity-calculator","href":"/api-reference/calculators/bond-yield-to-maturity-calculator"},{"title":"BPM to Millisecond Delay Calculator API","deprecated":null,"version":null,"sidebarTitle":"BPM to Millisecond Delay Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bpm-to-ms-delay-calculator","href":"/api-reference/calculators/bpm-to-millisecond-delay-calculator"},{"title":"Break-Even Point Calculator API","deprecated":null,"version":null,"sidebarTitle":"Break-Even Point Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/break-even-point-calculator","href":"/api-reference/calculators/break-even-point-calculator"},{"title":"Cable Conduit Fill Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cable Conduit Fill Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cable-conduit-fill-calculator","href":"/api-reference/calculators/cable-conduit-fill-calculator"},{"title":"Cache TTL Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cache TTL Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cache-ttl-calculator","href":"/api-reference/calculators/cache-ttl-calculator"},{"title":"CAGR Calculator API","deprecated":null,"version":null,"sidebarTitle":"CAGR Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cagr-calculator","href":"/api-reference/calculators/cagr-calculator"},{"title":"CAPM Calculator API","deprecated":null,"version":null,"sidebarTitle":"CAPM Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/capm-calculator","href":"/api-reference/calculators/capm-calculator"},{"title":"CPC Calculator API","deprecated":null,"version":null,"sidebarTitle":"CPC Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cpc-calculator","href":"/api-reference/calculators/cpc-calculator"},{"title":"Calorie Burn Calculator API","deprecated":null,"version":null,"sidebarTitle":"Calorie Burn Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/calorie-burn-calculator","href":"/api-reference/calculators/calorie-burn-calculator"},{"title":"CPM Calculator API","deprecated":null,"version":null,"sidebarTitle":"CPM Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cpm-calculator","href":"/api-reference/calculators/cpm-calculator"},{"title":"Carbon Footprint Estimator API","deprecated":null,"version":null,"sidebarTitle":"Carbon Footprint Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/carbon-footprint-estimator","href":"/api-reference/calculators/carbon-footprint-estimator"},{"title":"Car Lease Calculator API","deprecated":null,"version":null,"sidebarTitle":"Car Lease Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/car-lease-calculator","href":"/api-reference/calculators/car-lease-calculator"},{"title":"Carpet Calculator API","deprecated":null,"version":null,"sidebarTitle":"Carpet Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/carpet-calculator","href":"/api-reference/calculators/carpet-calculator"},{"title":"Cash Flow Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cash Flow Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cash-flow-calculator","href":"/api-reference/calculators/cash-flow-calculator"},{"title":"Cooling Load Estimator API","deprecated":null,"version":null,"sidebarTitle":"Cooling Load Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cooling-load-estimator","href":"/api-reference/calculators/cooling-load-estimator"},{"title":"Project Cash Flow Calculator API","deprecated":null,"version":null,"sidebarTitle":"Project Cash Flow Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/project-cash-flow-calculator","href":"/api-reference/calculators/project-cash-flow-calculator"},{"title":"Cat Litter Box Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cat Litter Box Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cat-litter-box-calculator","href":"/api-reference/calculators/cat-litter-box-calculator"},{"title":"Inductive Reactance Calculator API","deprecated":null,"version":null,"sidebarTitle":"Inductive Reactance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/inductive-reactance-calculator","href":"/api-reference/calculators/inductive-reactance-calculator"},{"title":"Orifice Flow Calculator API","deprecated":null,"version":null,"sidebarTitle":"Orifice Flow Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/orifice-flow-calculator","href":"/api-reference/calculators/orifice-flow-calculator"},{"title":"Pump Affinity Laws Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pump Affinity Laws Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pump-affinity-laws-calculator","href":"/api-reference/calculators/pump-affinity-laws-calculator"},{"title":"3-Phase Power Calculator API","deprecated":null,"version":null,"sidebarTitle":"3-Phase Power Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/three-phase-power-calculator","href":"/api-reference/calculators/3-phase-power-calculator"},{"title":"Ceiling and Floor Function Calculator API","deprecated":null,"version":null,"sidebarTitle":"Ceiling and Floor Function Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ceiling-and-floor-function-calculator","href":"/api-reference/calculators/ceiling-and-floor-function-calculator"},{"title":"Churn Rate \u0026 Retention Calculator API","deprecated":null,"version":null,"sidebarTitle":"Churn Rate \u0026 Retention Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/churn-rate-retention-calculator","href":"/api-reference/calculators/churn-rate-\u0026-retention-calculator"},{"title":"Circle \u0026 Ellipse Calculator API","deprecated":null,"version":null,"sidebarTitle":"Circle \u0026 Ellipse Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/circle-ellipse-calculator","href":"/api-reference/calculators/circle-\u0026-ellipse-calculator"},{"title":"Circuit Breaker Sizing Helper API","deprecated":null,"version":null,"sidebarTitle":"Circuit Breaker Sizing Helper","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/circuit-breaker-sizing-helper","href":"/api-reference/calculators/circuit-breaker-sizing-helper"},{"title":"Cloud Bandwidth Cost Estimator API","deprecated":null,"version":null,"sidebarTitle":"Cloud Bandwidth Cost Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cloud-bandwidth-cost-estimator","href":"/api-reference/calculators/cloud-bandwidth-cost-estimator"},{"title":"Camera Depth of Field (DoF) Calculator API","deprecated":null,"version":null,"sidebarTitle":"Camera Depth of Field (DoF) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/camera-depth-of-field-calculator","href":"/api-reference/calculators/camera-depth-of-field-dof-calculator"},{"title":"Column Slenderness Calculator API","deprecated":null,"version":null,"sidebarTitle":"Column Slenderness Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/column-slenderness-calculator","href":"/api-reference/calculators/column-slenderness-calculator"},{"title":"Complementary Error Function Calculator API","deprecated":null,"version":null,"sidebarTitle":"Complementary Error Function Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/complementary-error-function-calculator","href":"/api-reference/calculators/complementary-error-function-calculator"},{"title":"Completing the Square Calculator API","deprecated":null,"version":null,"sidebarTitle":"Completing the Square Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/completing-the-square-calculator","href":"/api-reference/calculators/completing-the-square-calculator"},{"title":"Compound Interest Calculator API","deprecated":null,"version":null,"sidebarTitle":"Compound Interest Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/compound-interest-calculator","href":"/api-reference/calculators/compound-interest-calculator"},{"title":"Compression Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Compression Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/compression-ratio-calculator","href":"/api-reference/calculators/compression-ratio-calculator"},{"title":"Concrete Volume \u0026 Bags Calculator API","deprecated":null,"version":null,"sidebarTitle":"Concrete Volume \u0026 Bags Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/concrete-volume-bags-calculator","href":"/api-reference/calculators/concrete-volume-\u0026-bags-calculator"},{"title":"Confidence Interval Calculator API","deprecated":null,"version":null,"sidebarTitle":"Confidence Interval Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/confidence-interval-calculator","href":"/api-reference/calculators/confidence-interval-calculator"},{"title":"Confusion Matrix Calculator API","deprecated":null,"version":null,"sidebarTitle":"Confusion Matrix Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/confusion-matrix-calculator","href":"/api-reference/calculators/confusion-matrix-calculator"},{"title":"Container Garden Planner API","deprecated":null,"version":null,"sidebarTitle":"Container Garden Planner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/container-garden-planner","href":"/api-reference/calculators/container-garden-planner"},{"title":"Contribution Margin Calculator API","deprecated":null,"version":null,"sidebarTitle":"Contribution Margin Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/contribution-margin-calculator","href":"/api-reference/calculators/contribution-margin-calculator"},{"title":"Conversion Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Conversion Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/conversion-rate-calculator","href":"/api-reference/calculators/conversion-rate-calculator"},{"title":"P/E Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"P/E Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/p-e-ratio-calculator","href":"/api-reference/calculators/pe-ratio-calculator"},{"title":"Coffee Brew Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Coffee Brew Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/coffee-brew-ratio-calculator","href":"/api-reference/calculators/coffee-brew-ratio-calculator"},{"title":"Coordinate Area Calculator API","deprecated":null,"version":null,"sidebarTitle":"Coordinate Area Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/coordinate-area-calculator","href":"/api-reference/calculators/coordinate-area-calculator"},{"title":"Cost Per Lead Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cost Per Lead Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cost-per-lead-calculator","href":"/api-reference/calculators/cost-per-lead-calculator"},{"title":"Credit Card Minimum Payment Calculator API","deprecated":null,"version":null,"sidebarTitle":"Credit Card Minimum Payment Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/credit-card-minimum-payment-calculator","href":"/api-reference/calculators/credit-card-minimum-payment-calculator"},{"title":"Credit Card Payment Calculator API","deprecated":null,"version":null,"sidebarTitle":"Credit Card Payment Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/credit-card-payment-calculator","href":"/api-reference/calculators/credit-card-payment-calculator"},{"title":"Credit Card Payoff Calculator API","deprecated":null,"version":null,"sidebarTitle":"Credit Card Payoff Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/credit-card-payoff-calculator","href":"/api-reference/calculators/credit-card-payoff-calculator"},{"title":"Credit Utilization Calculator API","deprecated":null,"version":null,"sidebarTitle":"Credit Utilization Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/credit-utilization-calculator","href":"/api-reference/calculators/credit-utilization-calculator"},{"title":"Cross Product Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cross Product Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cross-product-calculator","href":"/api-reference/calculators/cross-product-calculator"},{"title":"Crypto Arbitrage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Crypto Arbitrage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/crypto-arbitrage-calculator","href":"/api-reference/calculators/crypto-arbitrage-calculator"},{"title":"Crypto Leverage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Crypto Leverage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/crypto-leverage-calculator","href":"/api-reference/calculators/crypto-leverage-calculator"},{"title":"Crypto Profit/Loss Calculator API","deprecated":null,"version":null,"sidebarTitle":"Crypto Profit/Loss Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/crypto-profit-loss-calculator","href":"/api-reference/calculators/crypto-profitloss-calculator"},{"title":"CSS Specificity Calculator API","deprecated":null,"version":null,"sidebarTitle":"CSS Specificity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-specificity-calculator","href":"/api-reference/calculators/css-specificity-calculator"},{"title":"CTR Calculator API","deprecated":null,"version":null,"sidebarTitle":"CTR Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ctr-calculator","href":"/api-reference/calculators/ctr-calculator"},{"title":"Cube and Cube Root Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cube and Cube Root Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cube-and-cube-root-calculator","href":"/api-reference/calculators/cube-and-cube-root-calculator"},{"title":"Cube Root Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cube Root Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cube-root-calculator","href":"/api-reference/calculators/cube-root-calculator"},{"title":"Cubic Equation Solver API","deprecated":null,"version":null,"sidebarTitle":"Cubic Equation Solver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cubic-equation-solver","href":"/api-reference/calculators/cubic-equation-solver"},{"title":"Curl Calculator API","deprecated":null,"version":null,"sidebarTitle":"Curl Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/curl-calculator","href":"/api-reference/calculators/curl-calculator"},{"title":"Curvature Calculator API","deprecated":null,"version":null,"sidebarTitle":"Curvature Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/curvature-calculator","href":"/api-reference/calculators/curvature-calculator"},{"title":"Directional Derivative Calculator API","deprecated":null,"version":null,"sidebarTitle":"Directional Derivative Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/directional-derivative-calculator","href":"/api-reference/calculators/directional-derivative-calculator"},{"title":"Divergence Calculator API","deprecated":null,"version":null,"sidebarTitle":"Divergence Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/divergence-calculator","href":"/api-reference/calculators/divergence-calculator"},{"title":"Customer Lifetime Value Calculator API","deprecated":null,"version":null,"sidebarTitle":"Customer Lifetime Value Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/customer-lifetime-value-calculator","href":"/api-reference/calculators/customer-lifetime-value-calculator"},{"title":"Daily Time Savings Calculator API","deprecated":null,"version":null,"sidebarTitle":"Daily Time Savings Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/daily-time-savings-calculator","href":"/api-reference/calculators/daily-time-savings-calculator"},{"title":"Data Transfer Time Calculator API","deprecated":null,"version":null,"sidebarTitle":"Data Transfer Time Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/data-transfer-time-calculator","href":"/api-reference/calculators/data-transfer-time-calculator"},{"title":"Date Calculator API","deprecated":null,"version":null,"sidebarTitle":"Date Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/date-calculator","href":"/api-reference/calculators/date-calculator"},{"title":"Date Countdown Calculator API","deprecated":null,"version":null,"sidebarTitle":"Date Countdown Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/date-countdown-calculator","href":"/api-reference/calculators/date-countdown-calculator"},{"title":"Date Difference Calculator API","deprecated":null,"version":null,"sidebarTitle":"Date Difference Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/date-difference-calculator","href":"/api-reference/calculators/date-difference-calculator"},{"title":"DCA (Dollar-Cost Averaging) Calculator API","deprecated":null,"version":null,"sidebarTitle":"DCA (Dollar-Cost Averaging) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dca-calculator","href":"/api-reference/calculators/dca-dollar-cost-averaging-calculator"},{"title":"Debt Consolidation Calculator API","deprecated":null,"version":null,"sidebarTitle":"Debt Consolidation Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/debt-consolidation-calculator","href":"/api-reference/calculators/debt-consolidation-calculator"},{"title":"Debt Repayment Calculator API","deprecated":null,"version":null,"sidebarTitle":"Debt Repayment Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/debt-repayment-calculator","href":"/api-reference/calculators/debt-repayment-calculator"},{"title":"Debt Service Coverage Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Debt Service Coverage Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/debt-service-coverage-ratio-calculator","href":"/api-reference/calculators/debt-service-coverage-ratio-calculator"},{"title":"Debt-to-Income Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Debt-to-Income Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/debt-to-income-ratio-calculator","href":"/api-reference/calculators/debt-to-income-ratio-calculator"},{"title":"Density Calculator API","deprecated":null,"version":null,"sidebarTitle":"Density Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/density-calculator","href":"/api-reference/calculators/density-calculator"},{"title":"Depreciation Calculator API","deprecated":null,"version":null,"sidebarTitle":"Depreciation Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/depreciation-calculator","href":"/api-reference/calculators/depreciation-calculator"},{"title":"Descartes' Rule of Signs Calculator API","deprecated":null,"version":null,"sidebarTitle":"Descartes' Rule of Signs Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/descartes-rule-of-signs-calculator","href":"/api-reference/calculators/descartes-rule-of-signs-calculator"},{"title":"Dew Point \u0026 Humidity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Dew Point \u0026 Humidity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dew-point-humidity-calculator","href":"/api-reference/calculators/dew-point-\u0026-humidity-calculator"},{"title":"Dilution Calculator API","deprecated":null,"version":null,"sidebarTitle":"Dilution Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dilution-calculator","href":"/api-reference/calculators/dilution-calculator"},{"title":"Discount \u0026 Markup Calculator API","deprecated":null,"version":null,"sidebarTitle":"Discount \u0026 Markup Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/discount-markup-calculator","href":"/api-reference/calculators/discount-\u0026-markup-calculator"},{"title":"Dishwasher Load Optimizer API","deprecated":null,"version":null,"sidebarTitle":"Dishwasher Load Optimizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dishwasher-load-optimizer","href":"/api-reference/calculators/dishwasher-load-optimizer"},{"title":"Dough Hydration Calculator API","deprecated":null,"version":null,"sidebarTitle":"Dough Hydration Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dough-hydration-calculator","href":"/api-reference/calculators/dough-hydration-calculator"},{"title":"Dividend Reinvestment (DRIP) Calculator API","deprecated":null,"version":null,"sidebarTitle":"Dividend Reinvestment (DRIP) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dividend-reinvestment-calculator","href":"/api-reference/calculators/dividend-reinvestment-drip-calculator"},{"title":"DNS Record TTL Expiry Calculator API","deprecated":null,"version":null,"sidebarTitle":"DNS Record TTL Expiry Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dns-record-ttl-expiry-calculator","href":"/api-reference/calculators/dns-record-ttl-expiry-calculator"},{"title":"Docker Container Resource Calculator API","deprecated":null,"version":null,"sidebarTitle":"Docker Container Resource Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/docker-container-resource-calculator","href":"/api-reference/calculators/docker-container-resource-calculator"},{"title":"Double Integral Calculator API","deprecated":null,"version":null,"sidebarTitle":"Double Integral Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/double-integral-calculator","href":"/api-reference/calculators/double-integral-calculator"},{"title":"DPI / PPI Calculator API","deprecated":null,"version":null,"sidebarTitle":"DPI / PPI Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dpi-ppi-calculator","href":"/api-reference/calculators/dpi-ppi-calculator"},{"title":"DPS Calculator API","deprecated":null,"version":null,"sidebarTitle":"DPS Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dps-calculator","href":"/api-reference/calculators/dps-calculator"},{"title":"Duct Velocity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Duct Velocity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/duct-velocity-calculator","href":"/api-reference/calculators/duct-velocity-calculator"},{"title":"Duct Friction Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Duct Friction Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/duct-friction-rate-calculator","href":"/api-reference/calculators/duct-friction-rate-calculator"},{"title":"eBay Fee Calculator API","deprecated":null,"version":null,"sidebarTitle":"eBay Fee Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ebay-fee-calculator","href":"/api-reference/calculators/ebay-fee-calculator"},{"title":"Effective Interest Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Effective Interest Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/effective-interest-rate-calculator","href":"/api-reference/calculators/effective-interest-rate-calculator"},{"title":"Electricity Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"Electricity Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/electricity-cost-calculator","href":"/api-reference/calculators/electricity-cost-calculator"},{"title":"Email Open Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Email Open Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/email-open-rate-calculator","href":"/api-reference/calculators/email-open-rate-calculator"},{"title":"EMI Calculator API","deprecated":null,"version":null,"sidebarTitle":"EMI Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/emi-calculator","href":"/api-reference/calculators/emi-calculator"},{"title":"Employee Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"Employee Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/employee-cost-calculator","href":"/api-reference/calculators/employee-cost-calculator"},{"title":"EOQ Calculator API","deprecated":null,"version":null,"sidebarTitle":"EOQ Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/eoq-calculator","href":"/api-reference/calculators/eoq-calculator"},{"title":"Equivalent Fractions Calculator API","deprecated":null,"version":null,"sidebarTitle":"Equivalent Fractions Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/equivalent-fractions-calculator","href":"/api-reference/calculators/equivalent-fractions-calculator"},{"title":"ERA Calculator API","deprecated":null,"version":null,"sidebarTitle":"ERA Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/era-calculator","href":"/api-reference/calculators/era-calculator"},{"title":"Error Function Calculator API","deprecated":null,"version":null,"sidebarTitle":"Error Function Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/error-function-calculator","href":"/api-reference/calculators/error-function-calculator"},{"title":"ETA Calculator API","deprecated":null,"version":null,"sidebarTitle":"ETA Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/eta-calculator","href":"/api-reference/calculators/eta-calculator"},{"title":"EV Charging Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"EV Charging Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ev-charging-cost-calculator","href":"/api-reference/calculators/ev-charging-cost-calculator"},{"title":"EV Range Estimator API","deprecated":null,"version":null,"sidebarTitle":"EV Range Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ev-range-estimator","href":"/api-reference/calculators/ev-range-estimator"},{"title":"Even or Odd Number Checker API","deprecated":null,"version":null,"sidebarTitle":"Even or Odd Number Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/even-or-odd-number-checker","href":"/api-reference/calculators/even-or-odd-number-checker"},{"title":"Exponential Growth Calculator API","deprecated":null,"version":null,"sidebarTitle":"Exponential Growth Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/exponential-growth-calculator","href":"/api-reference/calculators/exponential-growth-calculator"},{"title":"Factor of Safety Calculator API","deprecated":null,"version":null,"sidebarTitle":"Factor of Safety Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/factor-of-safety-calculator","href":"/api-reference/calculators/factor-of-safety-calculator"},{"title":"Chiller Tonnage Estimator API","deprecated":null,"version":null,"sidebarTitle":"Chiller Tonnage Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/chiller-tonnage-estimator","href":"/api-reference/calculators/chiller-tonnage-estimator"},{"title":"Fan Static Pressure Estimator API","deprecated":null,"version":null,"sidebarTitle":"Fan Static Pressure Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fan-static-pressure-estimator","href":"/api-reference/calculators/fan-static-pressure-estimator"},{"title":"Factorial Calculator API","deprecated":null,"version":null,"sidebarTitle":"Factorial Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/factorial-calculator","href":"/api-reference/calculators/factorial-calculator"},{"title":"Fibonacci Retracement Calculator API","deprecated":null,"version":null,"sidebarTitle":"Fibonacci Retracement Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fibonacci-retracement-calculator","href":"/api-reference/calculators/fibonacci-retracement-calculator"},{"title":"FIRE Calculator API","deprecated":null,"version":null,"sidebarTitle":"FIRE Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fire-calculator","href":"/api-reference/calculators/fire-calculator"},{"title":"First N Digits of e Calculator API","deprecated":null,"version":null,"sidebarTitle":"First N Digits of e Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/first-n-digits-of-e-calculator","href":"/api-reference/calculators/first-n-digits-of-e-calculator"},{"title":"First N Digits of Pi Calculator API","deprecated":null,"version":null,"sidebarTitle":"First N Digits of Pi Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/first-n-digits-of-pi-calculator","href":"/api-reference/calculators/first-n-digits-of-pi-calculator"},{"title":"Fixed Charge Coverage Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Fixed Charge Coverage Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fixed-charge-coverage-ratio-calculator","href":"/api-reference/calculators/fixed-charge-coverage-ratio-calculator"},{"title":"Floor / Tile Area Calculator API","deprecated":null,"version":null,"sidebarTitle":"Floor / Tile Area Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/floor-tile-area-calculator","href":"/api-reference/calculators/floor-tile-area-calculator"},{"title":"Osmotic Pressure Calculator API","deprecated":null,"version":null,"sidebarTitle":"Osmotic Pressure Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/osmotic-pressure-calculator","href":"/api-reference/calculators/osmotic-pressure-calculator"},{"title":"Friction Calculator API","deprecated":null,"version":null,"sidebarTitle":"Friction Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/friction-calculator","href":"/api-reference/calculators/friction-calculator"},{"title":"Fuel Economy Calculator API","deprecated":null,"version":null,"sidebarTitle":"Fuel Economy Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fuel-economy-calculator","href":"/api-reference/calculators/fuel-economy-calculator"},{"title":"Function Composition Calculator API","deprecated":null,"version":null,"sidebarTitle":"Function Composition Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/function-composition-calculator","href":"/api-reference/calculators/function-composition-calculator"},{"title":"Function Odd/Even/Neither Checker API","deprecated":null,"version":null,"sidebarTitle":"Function Odd/Even/Neither Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/function-odd-even-neither-checker","href":"/api-reference/calculators/function-oddevenneither-checker"},{"title":"Gamma Function Calculator API","deprecated":null,"version":null,"sidebarTitle":"Gamma Function Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gamma-function-calculator","href":"/api-reference/calculators/gamma-function-calculator"},{"title":"Gas vs Electric Cost Comparison API","deprecated":null,"version":null,"sidebarTitle":"Gas vs Electric Cost Comparison","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gas-vs-electric-cost-comparison","href":"/api-reference/calculators/gas-vs-electric-cost-comparison"},{"title":"GCD \u0026 LCM Calculator API","deprecated":null,"version":null,"sidebarTitle":"GCD \u0026 LCM Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gcd-lcm-calculator","href":"/api-reference/calculators/gcd-\u0026-lcm-calculator"},{"title":"Geometric Mean Calculator API","deprecated":null,"version":null,"sidebarTitle":"Geometric Mean Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/geometric-mean-calculator","href":"/api-reference/calculators/geometric-mean-calculator"},{"title":"Gear Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Gear Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gear-ratio-calculator","href":"/api-reference/calculators/gear-ratio-calculator"},{"title":"Generator Sizing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Generator Sizing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/generator-sizing-calculator","href":"/api-reference/calculators/generator-sizing-calculator"},{"title":"Geo Distance Calculator API","deprecated":null,"version":null,"sidebarTitle":"Geo Distance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/geo-distance-calculator","href":"/api-reference/calculators/geo-distance-calculator"},{"title":"Geo Polygon Area Calculator API","deprecated":null,"version":null,"sidebarTitle":"Geo Polygon Area Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/geo-polygon-area-calculator","href":"/api-reference/calculators/geo-polygon-area-calculator"},{"title":"Golden Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Golden Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/golden-ratio-calculator","href":"/api-reference/calculators/golden-ratio-calculator"},{"title":"Golden Rectangle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Golden Rectangle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/golden-rectangle-calculator","href":"/api-reference/calculators/golden-rectangle-calculator"},{"title":"Golden Section Calculator API","deprecated":null,"version":null,"sidebarTitle":"Golden Section Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/golden-section-calculator","href":"/api-reference/calculators/golden-section-calculator"},{"title":"GPA Calculator API","deprecated":null,"version":null,"sidebarTitle":"GPA Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gpa-calculator","href":"/api-reference/calculators/gpa-calculator"},{"title":"GPU VRAM Calculator API","deprecated":null,"version":null,"sidebarTitle":"GPU VRAM Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gpu-vram-calculator","href":"/api-reference/calculators/gpu-vram-calculator"},{"title":"Harmonic Distortion (THD) Calculator API","deprecated":null,"version":null,"sidebarTitle":"Harmonic Distortion (THD) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/harmonic-distortion-thd-calculator","href":"/api-reference/calculators/harmonic-distortion-thd-calculator"},{"title":"Hash Collision Probability Calculator (Birthday Problem) API","deprecated":null,"version":null,"sidebarTitle":"Hash Collision Probability Calculator (Birthday Problem)","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hash-collision-probability-calculator","href":"/api-reference/calculators/hash-collision-probability-calculator-birthday-problem"},{"title":"Heart Rate Zone Calculator API","deprecated":null,"version":null,"sidebarTitle":"Heart Rate Zone Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/heart-rate-zone-calculator","href":"/api-reference/calculators/heart-rate-zone-calculator"},{"title":"Heat Exchanger LMTD Calculator API","deprecated":null,"version":null,"sidebarTitle":"Heat Exchanger LMTD Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/heat-exchanger-lmtd-calculator","href":"/api-reference/calculators/heat-exchanger-lmtd-calculator"},{"title":"Heat Index \u0026 Wind Chill Calculator API","deprecated":null,"version":null,"sidebarTitle":"Heat Index \u0026 Wind Chill Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/heat-index-wind-chill-calculator","href":"/api-reference/calculators/heat-index-\u0026-wind-chill-calculator"},{"title":"Hours Calculator API","deprecated":null,"version":null,"sidebarTitle":"Hours Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hours-calculator","href":"/api-reference/calculators/hours-calculator"},{"title":"HVAC BTU Load Calculator API","deprecated":null,"version":null,"sidebarTitle":"HVAC BTU Load Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hvac-btu-load-calculator","href":"/api-reference/calculators/hvac-btu-load-calculator"},{"title":"Hyperbola Calculator API","deprecated":null,"version":null,"sidebarTitle":"Hyperbola Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hyperbola-calculator","href":"/api-reference/calculators/hyperbola-calculator"},{"title":"Hyperbolic Functions Calculator API","deprecated":null,"version":null,"sidebarTitle":"Hyperbolic Functions Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hyperbolic-functions-calculator","href":"/api-reference/calculators/hyperbolic-functions-calculator"},{"title":"Ideal Body Weight Calculator API","deprecated":null,"version":null,"sidebarTitle":"Ideal Body Weight Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ideal-body-weight-calculator","href":"/api-reference/calculators/ideal-body-weight-calculator"},{"title":"HbA1c Calculator API","deprecated":null,"version":null,"sidebarTitle":"HbA1c Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hba1c-calculator","href":"/api-reference/calculators/hba1c-calculator"},{"title":"Body Surface Area Calculator API","deprecated":null,"version":null,"sidebarTitle":"Body Surface Area Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/body-surface-area-calculator","href":"/api-reference/calculators/body-surface-area-calculator"},{"title":"Image Print Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Image Print Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-print-size-calculator","href":"/api-reference/calculators/image-print-size-calculator"},{"title":"Implicit Derivative Calculator API","deprecated":null,"version":null,"sidebarTitle":"Implicit Derivative Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/implicit-derivative-calculator","href":"/api-reference/calculators/implicit-derivative-calculator"},{"title":"Inflation Calculator API","deprecated":null,"version":null,"sidebarTitle":"Inflation Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/inflation-calculator","href":"/api-reference/calculators/inflation-calculator"},{"title":"Insulation Calculator API","deprecated":null,"version":null,"sidebarTitle":"Insulation Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/insulation-calculator","href":"/api-reference/calculators/insulation-calculator"},{"title":"Invoice Total Calculator API","deprecated":null,"version":null,"sidebarTitle":"Invoice Total Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/invoice-total-calculator","href":"/api-reference/calculators/invoice-total-calculator"},{"title":"IPv4 Subnet Calculator API","deprecated":null,"version":null,"sidebarTitle":"IPv4 Subnet Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv4-subnet-calculator","href":"/api-reference/calculators/ipv4-subnet-calculator"},{"title":"IPv6 Subnet Calculator API","deprecated":null,"version":null,"sidebarTitle":"IPv6 Subnet Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ipv6-subnet-calculator","href":"/api-reference/calculators/ipv6-subnet-calculator"},{"title":"Irregular Polygon Area Calculator API","deprecated":null,"version":null,"sidebarTitle":"Irregular Polygon Area Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/irregular-polygon-area-calculator","href":"/api-reference/calculators/irregular-polygon-area-calculator"},{"title":"ISO Week Number Calculator API","deprecated":null,"version":null,"sidebarTitle":"ISO Week Number Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/iso-week-number-calculator","href":"/api-reference/calculators/iso-week-number-calculator"},{"title":"Jacobian Matrix Calculator API","deprecated":null,"version":null,"sidebarTitle":"Jacobian Matrix Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jacobian-matrix-calculator","href":"/api-reference/calculators/jacobian-matrix-calculator"},{"title":"Keyboard Mileage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Keyboard Mileage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/keyboard-mileage-calculator","href":"/api-reference/calculators/keyboard-mileage-calculator"},{"title":"Kinetic Energy Calculator API","deprecated":null,"version":null,"sidebarTitle":"Kinetic Energy Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/kinetic-energy-calculator","href":"/api-reference/calculators/kinetic-energy-calculator"},{"title":"Lemonade Stand Calculator API","deprecated":null,"version":null,"sidebarTitle":"Lemonade Stand Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lemonade-stand-calculator","href":"/api-reference/calculators/lemonade-stand-calculator"},{"title":"Leveling Rise \u0026 Fall Calculator API","deprecated":null,"version":null,"sidebarTitle":"Leveling Rise \u0026 Fall Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/leveling-rise-fall-calculator","href":"/api-reference/calculators/leveling-rise-\u0026-fall-calculator"},{"title":"L'Hôpital's Rule Calculator API","deprecated":null,"version":null,"sidebarTitle":"L'Hôpital's Rule Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lhopitals-rule-calculator","href":"/api-reference/calculators/lhôpitals-rule-calculator"},{"title":"Lumber Calculator API","deprecated":null,"version":null,"sidebarTitle":"Lumber Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lumber-calculator","href":"/api-reference/calculators/lumber-calculator"},{"title":"Labor Cost Estimator API","deprecated":null,"version":null,"sidebarTitle":"Labor Cost Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/labor-cost-estimator","href":"/api-reference/calculators/labor-cost-estimator"},{"title":"Lean Six Sigma DPMO \u0026 Sigma Level Calculator API","deprecated":null,"version":null,"sidebarTitle":"Lean Six Sigma DPMO \u0026 Sigma Level Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lean-six-sigma-dpmo-calculator","href":"/api-reference/calculators/lean-six-sigma-dpmo-\u0026-sigma-level-calculator"},{"title":"LED Resistor Value Calculator API","deprecated":null,"version":null,"sidebarTitle":"LED Resistor Value Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/led-resistor-value-calculator","href":"/api-reference/calculators/led-resistor-value-calculator"},{"title":"Light Bulb Savings Calculator API","deprecated":null,"version":null,"sidebarTitle":"Light Bulb Savings Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/light-bulb-savings-calculator","href":"/api-reference/calculators/light-bulb-savings-calculator"},{"title":"Limiting Reactant Calculator API","deprecated":null,"version":null,"sidebarTitle":"Limiting Reactant Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/limiting-reactant-calculator","href":"/api-reference/calculators/limiting-reactant-calculator"},{"title":"Line Integral Calculator API","deprecated":null,"version":null,"sidebarTitle":"Line Integral Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/line-integral-calculator","href":"/api-reference/calculators/line-integral-calculator"},{"title":"Linear Equation Solver API","deprecated":null,"version":null,"sidebarTitle":"Linear Equation Solver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/linear-equation-solver","href":"/api-reference/calculators/linear-equation-solver"},{"title":"LLM API Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"LLM API Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/llm-api-cost-calculator","href":"/api-reference/calculators/llm-api-cost-calculator"},{"title":"Loan Affordability Calculator API","deprecated":null,"version":null,"sidebarTitle":"Loan Affordability Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/loan-affordability-calculator","href":"/api-reference/calculators/loan-affordability-calculator"},{"title":"Loan-to-Value (LTV) Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Loan-to-Value (LTV) Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/loan-to-value-ratio-calculator","href":"/api-reference/calculators/loan-to-value-ltv-ratio-calculator"},{"title":"Loot Drop Probability Calculator API","deprecated":null,"version":null,"sidebarTitle":"Loot Drop Probability Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/loot-drop-probability-calculator","href":"/api-reference/calculators/loot-drop-probability-calculator"},{"title":"Macronutrient Calculator API","deprecated":null,"version":null,"sidebarTitle":"Macronutrient Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/macronutrient-calculator","href":"/api-reference/calculators/macronutrient-calculator"},{"title":"Protein Intake Calculator API","deprecated":null,"version":null,"sidebarTitle":"Protein Intake Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/protein-intake-calculator","href":"/api-reference/calculators/protein-intake-calculator"},{"title":"Lean Body Mass Calculator API","deprecated":null,"version":null,"sidebarTitle":"Lean Body Mass Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lean-body-mass-calculator","href":"/api-reference/calculators/lean-body-mass-calculator"},{"title":"Machining Speed \u0026 Feed Calculator API","deprecated":null,"version":null,"sidebarTitle":"Machining Speed \u0026 Feed Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/machining-speed-feed-calculator","href":"/api-reference/calculators/machining-speed-\u0026-feed-calculator"},{"title":"Map Scale Calculator API","deprecated":null,"version":null,"sidebarTitle":"Map Scale Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/map-scale-calculator","href":"/api-reference/calculators/map-scale-calculator"},{"title":"Marginal Income Tax Bracket Calculator API","deprecated":null,"version":null,"sidebarTitle":"Marginal Income Tax Bracket Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/marginal-income-tax-bracket-calculator","href":"/api-reference/calculators/marginal-income-tax-bracket-calculator"},{"title":"Material Cost Estimator API","deprecated":null,"version":null,"sidebarTitle":"Material Cost Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/material-cost-estimator","href":"/api-reference/calculators/material-cost-estimator"},{"title":"Math Evaluator API","deprecated":null,"version":null,"sidebarTitle":"Math Evaluator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/math-evaluator","href":"/api-reference/calculators/math-evaluator"},{"title":"Matrix Calculator API","deprecated":null,"version":null,"sidebarTitle":"Matrix Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/matrix-calculator","href":"/api-reference/calculators/matrix-calculator"},{"title":"Meeting Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"Meeting Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/meeting-cost-calculator","href":"/api-reference/calculators/meeting-cost-calculator"},{"title":"Median Absolute Deviation Calculator API","deprecated":null,"version":null,"sidebarTitle":"Median Absolute Deviation Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/median-absolute-deviation-calculator","href":"/api-reference/calculators/median-absolute-deviation-calculator"},{"title":"Midpoint Calculator API","deprecated":null,"version":null,"sidebarTitle":"Midpoint Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/midpoint-calculator","href":"/api-reference/calculators/midpoint-calculator"},{"title":"Modulo Calculator API","deprecated":null,"version":null,"sidebarTitle":"Modulo Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/modulo-calculator","href":"/api-reference/calculators/modulo-calculator"},{"title":"Molality Calculator API","deprecated":null,"version":null,"sidebarTitle":"Molality Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/molality-calculator","href":"/api-reference/calculators/molality-calculator"},{"title":"Molar Mass Calculator API","deprecated":null,"version":null,"sidebarTitle":"Molar Mass Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/molar-mass-calculator","href":"/api-reference/calculators/molar-mass-calculator"},{"title":"Molarity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Molarity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/molarity-calculator","href":"/api-reference/calculators/molarity-calculator"},{"title":"Momentum Calculator API","deprecated":null,"version":null,"sidebarTitle":"Momentum Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/momentum-calculator","href":"/api-reference/calculators/momentum-calculator"},{"title":"Moon Phase Calculator API","deprecated":null,"version":null,"sidebarTitle":"Moon Phase Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/moon-phase-calculator","href":"/api-reference/calculators/moon-phase-calculator"},{"title":"Motor Full Load Current Calculator API","deprecated":null,"version":null,"sidebarTitle":"Motor Full Load Current Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/motor-full-load-current-calculator","href":"/api-reference/calculators/motor-full-load-current-calculator"},{"title":"Mulch, Soil \u0026 Gravel Calculator API","deprecated":null,"version":null,"sidebarTitle":"Mulch, Soil \u0026 Gravel Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mulch-soil-gravel-calculator","href":"/api-reference/calculators/mulch-soil-\u0026-gravel-calculator"},{"title":"Multi-Base Arithmetic Calculator API","deprecated":null,"version":null,"sidebarTitle":"Multi-Base Arithmetic Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/multi-base-arithmetic-calculator","href":"/api-reference/calculators/multi-base-arithmetic-calculator"},{"title":"Nernst Equation Calculator API","deprecated":null,"version":null,"sidebarTitle":"Nernst Equation Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nernst-equation-calculator","href":"/api-reference/calculators/nernst-equation-calculator"},{"title":"Net Promoter Score (NPS) Calculator API","deprecated":null,"version":null,"sidebarTitle":"Net Promoter Score (NPS) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/net-promoter-score-calculator","href":"/api-reference/calculators/net-promoter-score-nps-calculator"},{"title":"Network Latency Calculator API","deprecated":null,"version":null,"sidebarTitle":"Network Latency Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/network-latency-calculator","href":"/api-reference/calculators/network-latency-calculator"},{"title":"Network Mask Calculator API","deprecated":null,"version":null,"sidebarTitle":"Network Mask Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/network-mask-calculator","href":"/api-reference/calculators/network-mask-calculator"},{"title":"Net Worth Calculator API","deprecated":null,"version":null,"sidebarTitle":"Net Worth Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/net-worth-calculator","href":"/api-reference/calculators/net-worth-calculator"},{"title":"NPV \u0026 IRR Calculator API","deprecated":null,"version":null,"sidebarTitle":"NPV \u0026 IRR Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/npv-irr-calculator","href":"/api-reference/calculators/npv-\u0026-irr-calculator"},{"title":"Nth Root Calculator API","deprecated":null,"version":null,"sidebarTitle":"Nth Root Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/nth-root-calculator","href":"/api-reference/calculators/nth-root-calculator"},{"title":"Number of Digits Calculator API","deprecated":null,"version":null,"sidebarTitle":"Number of Digits Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/number-of-digits-calculator","href":"/api-reference/calculators/number-of-digits-calculator"},{"title":"Ohm's Law Calculator API","deprecated":null,"version":null,"sidebarTitle":"Ohm's Law Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ohms-law-calculator","href":"/api-reference/calculators/ohms-law-calculator"},{"title":"One-Rep Max Calculator API","deprecated":null,"version":null,"sidebarTitle":"One-Rep Max Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/one-rep-max-calculator","href":"/api-reference/calculators/one-rep-max-calculator"},{"title":"Order of Operations Calculator (PEMDAS) API","deprecated":null,"version":null,"sidebarTitle":"Order of Operations Calculator (PEMDAS)","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/order-of-operations-calculator-pemdas","href":"/api-reference/calculators/order-of-operations-calculator-pemdas"},{"title":"Paint Coverage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Paint Coverage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/paint-coverage-calculator","href":"/api-reference/calculators/paint-coverage-calculator"},{"title":"Parabola Calculator API","deprecated":null,"version":null,"sidebarTitle":"Parabola Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/parabola-calculator","href":"/api-reference/calculators/parabola-calculator"},{"title":"Parallel and Perpendicular Line Calculator API","deprecated":null,"version":null,"sidebarTitle":"Parallel and Perpendicular Line Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/parallel-and-perpendicular-line-calculator","href":"/api-reference/calculators/parallel-and-perpendicular-line-calculator"},{"title":"Parallel Resistor Calculator API","deprecated":null,"version":null,"sidebarTitle":"Parallel Resistor Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/parallel-resistor-calculator","href":"/api-reference/calculators/parallel-resistor-calculator"},{"title":"Partial Derivative Calculator API","deprecated":null,"version":null,"sidebarTitle":"Partial Derivative Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/partial-derivative-calculator","href":"/api-reference/calculators/partial-derivative-calculator"},{"title":"Partial Fraction Decomposition Calculator API","deprecated":null,"version":null,"sidebarTitle":"Partial Fraction Decomposition Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/partial-fraction-decomposition-calculator","href":"/api-reference/calculators/partial-fraction-decomposition-calculator"},{"title":"pKa to Ka Converter API","deprecated":null,"version":null,"sidebarTitle":"pKa to Ka Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pka-to-ka-converter","href":"/api-reference/calculators/pka-to-ka-converter"},{"title":"Password Hash Crack Time Estimator API","deprecated":null,"version":null,"sidebarTitle":"Password Hash Crack Time Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/password-hash-crack-time-estimator","href":"/api-reference/calculators/password-hash-crack-time-estimator"},{"title":"Payroll Take-Home Calculator API","deprecated":null,"version":null,"sidebarTitle":"Payroll Take-Home Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/payroll-take-home-calculator","href":"/api-reference/calculators/payroll-take-home-calculator"},{"title":"PCB Trace Width Calculator API","deprecated":null,"version":null,"sidebarTitle":"PCB Trace Width Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pcb-trace-width-calculator","href":"/api-reference/calculators/pcb-trace-width-calculator"},{"title":"Percent Off Calculator API","deprecated":null,"version":null,"sidebarTitle":"Percent Off Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/percent-off-calculator","href":"/api-reference/calculators/percent-off-calculator"},{"title":"Percent Yield Calculator API","deprecated":null,"version":null,"sidebarTitle":"Percent Yield Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/percent-yield-calculator","href":"/api-reference/calculators/percent-yield-calculator"},{"title":"Permutation \u0026 Combination Calculator API","deprecated":null,"version":null,"sidebarTitle":"Permutation \u0026 Combination Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/permutation-combination-calculator","href":"/api-reference/calculators/permutation-\u0026-combination-calculator"},{"title":"Permutations with Repetition Calculator API","deprecated":null,"version":null,"sidebarTitle":"Permutations with Repetition Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/permutations-with-repetition-calculator","href":"/api-reference/calculators/permutations-with-repetition-calculator"},{"title":"Pet Age Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pet Age Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pet-age-calculator","href":"/api-reference/calculators/pet-age-calculator"},{"title":"Pet Food Portion Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pet Food Portion Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pet-food-portion-calculator","href":"/api-reference/calculators/pet-food-portion-calculator"},{"title":"pH Calculator API","deprecated":null,"version":null,"sidebarTitle":"pH Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ph-calculator","href":"/api-reference/calculators/ph-calculator"},{"title":"Photography Exposure Value (EV) Calculator API","deprecated":null,"version":null,"sidebarTitle":"Photography Exposure Value (EV) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/photography-exposure-value-calculator","href":"/api-reference/calculators/photography-exposure-value-ev-calculator"},{"title":"Pipe Flow Velocity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pipe Flow Velocity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pipe-flow-velocity-calculator","href":"/api-reference/calculators/pipe-flow-velocity-calculator"},{"title":"Baker's Percentage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Baker's Percentage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/baker-s-percentage-calculator","href":"/api-reference/calculators/bakers-percentage-calculator"},{"title":"Beam Reaction Calculator API","deprecated":null,"version":null,"sidebarTitle":"Beam Reaction Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/beam-reaction-calculator","href":"/api-reference/calculators/beam-reaction-calculator"},{"title":"Pizza Party Planner API","deprecated":null,"version":null,"sidebarTitle":"Pizza Party Planner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pizza-party-planner","href":"/api-reference/calculators/pizza-party-planner"},{"title":"Pizza Value Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pizza Value Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pizza-value-calculator","href":"/api-reference/calculators/pizza-value-calculator"},{"title":"Plant Spacing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Plant Spacing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/plant-spacing-calculator","href":"/api-reference/calculators/plant-spacing-calculator"},{"title":"Podcast Audio File Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Podcast Audio File Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/podcast-audio-file-size-calculator","href":"/api-reference/calculators/podcast-audio-file-size-calculator"},{"title":"Pregnancy Due Date Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pregnancy Due Date Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pregnancy-due-date-calculator","href":"/api-reference/calculators/pregnancy-due-date-calculator"},{"title":"Prime Checker API","deprecated":null,"version":null,"sidebarTitle":"Prime Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/prime-checker","href":"/api-reference/calculators/prime-checker"},{"title":"Twin Prime Finder API","deprecated":null,"version":null,"sidebarTitle":"Twin Prime Finder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/twin-prime-finder","href":"/api-reference/calculators/twin-prime-finder"},{"title":"Happy Number Calculator API","deprecated":null,"version":null,"sidebarTitle":"Happy Number Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/happy-number-calculator","href":"/api-reference/calculators/happy-number-calculator"},{"title":"Prime Factorization Calculator API","deprecated":null,"version":null,"sidebarTitle":"Prime Factorization Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/prime-factorization-calculator","href":"/api-reference/calculators/prime-factorization-calculator"},{"title":"Print Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"Print Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/print-cost-calculator","href":"/api-reference/calculators/print-cost-calculator"},{"title":"Pump Power Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pump Power Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pump-power-calculator","href":"/api-reference/calculators/pump-power-calculator"},{"title":"PWM Duty Cycle \u0026 Frequency Calculator API","deprecated":null,"version":null,"sidebarTitle":"PWM Duty Cycle \u0026 Frequency Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pwm-duty-frequency-calculator","href":"/api-reference/calculators/pwm-duty-cycle-\u0026-frequency-calculator"},{"title":"Quadratic Formula Solver API","deprecated":null,"version":null,"sidebarTitle":"Quadratic Formula Solver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/quadratic-formula-solver","href":"/api-reference/calculators/quadratic-formula-solver"},{"title":"Stair Rise \u0026 Run Calculator API","deprecated":null,"version":null,"sidebarTitle":"Stair Rise \u0026 Run Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/stair-rise-run-calculator","href":"/api-reference/calculators/stair-rise-\u0026-run-calculator"},{"title":"Statistics Calculator API","deprecated":null,"version":null,"sidebarTitle":"Statistics Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/statistics-calculator","href":"/api-reference/calculators/statistics-calculator"},{"title":"Stress Strain Calculator API","deprecated":null,"version":null,"sidebarTitle":"Stress Strain Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/stress-strain-calculator","href":"/api-reference/calculators/stress-strain-calculator"},{"title":"String Length Calculator API","deprecated":null,"version":null,"sidebarTitle":"String Length Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/string-length-calculator","href":"/api-reference/calculators/string-length-calculator"},{"title":"Power Factor Correction Calculator API","deprecated":null,"version":null,"sidebarTitle":"Power Factor Correction Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/power-factor-correction-calculator","href":"/api-reference/calculators/power-factor-correction-calculator"},{"title":"Transformer Sizing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Transformer Sizing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/transformer-sizing-calculator","href":"/api-reference/calculators/transformer-sizing-calculator"},{"title":"Shaft Power \u0026 Torque Calculator API","deprecated":null,"version":null,"sidebarTitle":"Shaft Power \u0026 Torque Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/shaft-power-torque-calculator","href":"/api-reference/calculators/shaft-power-\u0026-torque-calculator"},{"title":"Sharpe Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sharpe Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sharpe-ratio-calculator","href":"/api-reference/calculators/sharpe-ratio-calculator"},{"title":"Mortgage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Mortgage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mortgage-calculator","href":"/api-reference/calculators/mortgage-calculator"},{"title":"Percentage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Percentage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/percentage-calculator","href":"/api-reference/calculators/percentage-calculator"},{"title":"Wind Load Estimator API","deprecated":null,"version":null,"sidebarTitle":"Wind Load Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wind-load-estimator","href":"/api-reference/calculators/wind-load-estimator"},{"title":"Rate Limit Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rate Limit Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rate-limit-calc","href":"/api-reference/calculators/rate-limit-calculator"},{"title":"RC Circuit Time Constant Calculator API","deprecated":null,"version":null,"sidebarTitle":"RC Circuit Time Constant Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rc-circuit-time-constant-calculator","href":"/api-reference/calculators/rc-circuit-time-constant-calculator"},{"title":"Reading Time Calculator API","deprecated":null,"version":null,"sidebarTitle":"Reading Time Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/reading-time-calculator","href":"/api-reference/calculators/reading-time-calculator"},{"title":"Rebar Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rebar Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rebar-calculator","href":"/api-reference/calculators/rebar-calculator"},{"title":"Rebar Weight Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rebar Weight Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rebar-weight-calculator","href":"/api-reference/calculators/rebar-weight-calculator"},{"title":"Receivables Turnover Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Receivables Turnover Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/receivables-turnover-ratio-calculator","href":"/api-reference/calculators/receivables-turnover-ratio-calculator"},{"title":"Recipe Scale Calculator API","deprecated":null,"version":null,"sidebarTitle":"Recipe Scale Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/recipe-scale-calculator","href":"/api-reference/calculators/recipe-scale-calculator"},{"title":"Rectangle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rectangle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rectangle-calculator","href":"/api-reference/calculators/rectangle-calculator"},{"title":"Rent Affordability Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rent Affordability Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rent-affordability-calculator","href":"/api-reference/calculators/rent-affordability-calculator"},{"title":"Real Rate of Return Calculator API","deprecated":null,"version":null,"sidebarTitle":"Real Rate of Return Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/real-rate-of-return-calculator","href":"/api-reference/calculators/real-rate-of-return-calculator"},{"title":"Rental Property ROI Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rental Property ROI Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rental-property-roi-calculator","href":"/api-reference/calculators/rental-property-roi-calculator"},{"title":"Revenue Per Employee Calculator API","deprecated":null,"version":null,"sidebarTitle":"Revenue Per Employee Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/revenue-per-employee-calculator","href":"/api-reference/calculators/revenue-per-employee-calculator"},{"title":"Resistor Color Code Calculator API","deprecated":null,"version":null,"sidebarTitle":"Resistor Color Code Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/resistor-color-code-calculator","href":"/api-reference/calculators/resistor-color-code-calculator"},{"title":"ROI Calculator API","deprecated":null,"version":null,"sidebarTitle":"ROI Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/roi-calculator","href":"/api-reference/calculators/roi-calculator"},{"title":"Rule of 72 Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rule of 72 Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rule-of-72-calculator","href":"/api-reference/calculators/rule-of-72-calculator"},{"title":"Running Pace Calculator API","deprecated":null,"version":null,"sidebarTitle":"Running Pace Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/running-pace-calculator","href":"/api-reference/calculators/running-pace-calculator"},{"title":"Salary Calculator API","deprecated":null,"version":null,"sidebarTitle":"Salary Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/salary-calculator","href":"/api-reference/calculators/salary-calculator"},{"title":"Sales Tax \u0026 VAT Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sales Tax \u0026 VAT Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sales-tax-vat-calculator","href":"/api-reference/calculators/sales-tax-\u0026-vat-calculator"},{"title":"Savings Goal Calculator API","deprecated":null,"version":null,"sidebarTitle":"Savings Goal Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/savings-goal-calculator","href":"/api-reference/calculators/savings-goal-calculator"},{"title":"Scale Model Conversion Calculator API","deprecated":null,"version":null,"sidebarTitle":"Scale Model Conversion Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/scale-model-conversion-calculator","href":"/api-reference/calculators/scale-model-conversion-calculator"},{"title":"Screen Size Comparison Calculator API","deprecated":null,"version":null,"sidebarTitle":"Screen Size Comparison Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/screen-size-comparison-calculator","href":"/api-reference/calculators/screen-size-comparison-calculator"},{"title":"Section Properties Calculator API","deprecated":null,"version":null,"sidebarTitle":"Section Properties Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/section-properties-calculator","href":"/api-reference/calculators/section-properties-calculator"},{"title":"Plate Weight Calculator API","deprecated":null,"version":null,"sidebarTitle":"Plate Weight Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/plate-weight-calculator","href":"/api-reference/calculators/plate-weight-calculator"},{"title":"Tolerance Stackup Calculator API","deprecated":null,"version":null,"sidebarTitle":"Tolerance Stackup Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tolerance-stackup-calculator","href":"/api-reference/calculators/tolerance-stackup-calculator"},{"title":"GD\u0026T Positional Tolerance Calculator API","deprecated":null,"version":null,"sidebarTitle":"GD\u0026T Positional Tolerance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gdt-positional-tolerance-calculator","href":"/api-reference/calculators/gd\u0026t-positional-tolerance-calculator"},{"title":"Sheet Metal Bend Allowance Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sheet Metal Bend Allowance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sheet-metal-bend-allowance-calculator","href":"/api-reference/calculators/sheet-metal-bend-allowance-calculator"},{"title":"Press Fit Interference Calculator API","deprecated":null,"version":null,"sidebarTitle":"Press Fit Interference Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/press-fit-interference-calculator","href":"/api-reference/calculators/press-fit-interference-calculator"},{"title":"Spring Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Spring Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/spring-rate-calculator","href":"/api-reference/calculators/spring-rate-calculator"},{"title":"Doppler Effect Calculator API","deprecated":null,"version":null,"sidebarTitle":"Doppler Effect Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/doppler-effect-calculator","href":"/api-reference/calculators/doppler-effect-calculator"},{"title":"Pendulum Period Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pendulum Period Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pendulum-period-calculator","href":"/api-reference/calculators/pendulum-period-calculator"},{"title":"Retirement Savings Calculator API","deprecated":null,"version":null,"sidebarTitle":"Retirement Savings Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/retirement-savings-calculator","href":"/api-reference/calculators/retirement-savings-calculator"},{"title":"Slab Reinforcement Estimator API","deprecated":null,"version":null,"sidebarTitle":"Slab Reinforcement Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slab-reinforcement-estimator","href":"/api-reference/calculators/slab-reinforcement-estimator"},{"title":"Slugging Percentage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Slugging Percentage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slugging-percentage-calculator","href":"/api-reference/calculators/slugging-percentage-calculator"},{"title":"Split Bill Calculator API","deprecated":null,"version":null,"sidebarTitle":"Split Bill Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/split-bill-calculator","href":"/api-reference/calculators/split-bill-calculator"},{"title":"Value of a Visitor Calculator API","deprecated":null,"version":null,"sidebarTitle":"Value of a Visitor Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/value-of-a-visitor-calculator","href":"/api-reference/calculators/value-of-a-visitor-calculator"},{"title":"Vector Magnitude Calculator API","deprecated":null,"version":null,"sidebarTitle":"Vector Magnitude Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vector-magnitude-calculator","href":"/api-reference/calculators/vector-magnitude-calculator"},{"title":"Vertex and Axis of Symmetry Calculator API","deprecated":null,"version":null,"sidebarTitle":"Vertex and Axis of Symmetry Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vertex-axis-calculator","href":"/api-reference/calculators/vertex-and-axis-of-symmetry-calculator"},{"title":"Video Bitrate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Video Bitrate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/video-bitrate-calculator","href":"/api-reference/calculators/video-bitrate-calculator"},{"title":"WACC Calculator API","deprecated":null,"version":null,"sidebarTitle":"WACC Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wacc-calculator","href":"/api-reference/calculators/wacc-calculator"},{"title":"Yeast Conversion Calculator API","deprecated":null,"version":null,"sidebarTitle":"Yeast Conversion Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yeast-conversion-calculator","href":"/api-reference/calculators/yeast-conversion-calculator"},{"title":"Volume \u0026 Surface Area Calculator API","deprecated":null,"version":null,"sidebarTitle":"Volume \u0026 Surface Area Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/volume-surface-area-calculator","href":"/api-reference/calculators/volume-\u0026-surface-area-calculator"},{"title":"X and Y Intercept Calculator API","deprecated":null,"version":null,"sidebarTitle":"X and Y Intercept Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/x-y-intercept-calculator","href":"/api-reference/calculators/x-and-y-intercept-calculator"},{"title":"Zero Coupon Bond Calculator API","deprecated":null,"version":null,"sidebarTitle":"Zero Coupon Bond Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/zero-coupon-bond-calculator","href":"/api-reference/calculators/zero-coupon-bond-calculator"},{"title":"Comparing Fractions Calculator API","deprecated":null,"version":null,"sidebarTitle":"Comparing Fractions Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/comparing-fractions-calculator","href":"/api-reference/calculators/comparing-fractions-calculator"},{"title":"Multiple Fraction Calculator API","deprecated":null,"version":null,"sidebarTitle":"Multiple Fraction Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/multiple-fraction-calculator","href":"/api-reference/calculators/multiple-fraction-calculator"},{"title":"Simple Interest Calculator API","deprecated":null,"version":null,"sidebarTitle":"Simple Interest Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/simple-interest-calculator","href":"/api-reference/calculators/simple-interest-calculator"},{"title":"Debt-to-Equity Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Debt-to-Equity Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/debt-to-equity-ratio-calculator","href":"/api-reference/calculators/debt-to-equity-ratio-calculator"},{"title":"Taylor Series Calculator API","deprecated":null,"version":null,"sidebarTitle":"Taylor Series Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/taylor-series-calculator","href":"/api-reference/calculators/taylor-series-calculator"},{"title":"Thermal Expansion Calculator API","deprecated":null,"version":null,"sidebarTitle":"Thermal Expansion Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/thermal-expansion-calculator","href":"/api-reference/calculators/thermal-expansion-calculator"},{"title":"SemVer Version Calculator API","deprecated":null,"version":null,"sidebarTitle":"SemVer Version Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/semver-version-calculator","href":"/api-reference/calculators/semver-version-calculator"},{"title":"Server Request Capacity Calculator (Little's Law) API","deprecated":null,"version":null,"sidebarTitle":"Server Request Capacity Calculator (Little's Law)","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/server-capacity-calculator","href":"/api-reference/calculators/server-request-capacity-calculator-littles-law"},{"title":"Sewing Fabric Yardage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sewing Fabric Yardage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sewing-fabric-yardage-calculator","href":"/api-reference/calculators/sewing-fabric-yardage-calculator"},{"title":"Shower Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"Shower Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/shower-cost-calculator","href":"/api-reference/calculators/shower-cost-calculator"},{"title":"Side Hustle Income Tax Calculator API","deprecated":null,"version":null,"sidebarTitle":"Side Hustle Income Tax Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/side-hustle-income-tax-calculator","href":"/api-reference/calculators/side-hustle-income-tax-calculator"},{"title":"Signal Attenuation dB Calculator API","deprecated":null,"version":null,"sidebarTitle":"Signal Attenuation dB Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/signal-attenuation-db-calculator","href":"/api-reference/calculators/signal-attenuation-db-calculator"},{"title":"Sleep Cycle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sleep Cycle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sleep-cycle-calculator","href":"/api-reference/calculators/sleep-cycle-calculator"},{"title":"Solar Panel Output Calculator API","deprecated":null,"version":null,"sidebarTitle":"Solar Panel Output Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/solar-panel-output-calculator","href":"/api-reference/calculators/solar-panel-output-calculator"},{"title":"Solar PV System Sizing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Solar PV System Sizing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/solar-pv-system-sizing-calculator","href":"/api-reference/calculators/solar-pv-system-sizing-calculator"},{"title":"Solar Shadow Azimuth Calculator API","deprecated":null,"version":null,"sidebarTitle":"Solar Shadow Azimuth Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/solar-shadow-azimuth-calculator","href":"/api-reference/calculators/solar-shadow-azimuth-calculator"},{"title":"Sprint Velocity \u0026 Capacity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sprint Velocity \u0026 Capacity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sprint-velocity-capacity-calculator","href":"/api-reference/calculators/sprint-velocity-\u0026-capacity-calculator"},{"title":"Stock Average Calculator API","deprecated":null,"version":null,"sidebarTitle":"Stock Average Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/stock-average-calculator","href":"/api-reference/calculators/stock-average-calculator"},{"title":"Stock \u0026 Forex Position Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Stock \u0026 Forex Position Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/stock-forex-position-size-calculator","href":"/api-reference/calculators/stock-\u0026-forex-position-size-calculator"},{"title":"Survey Sample Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Survey Sample Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/survey-sample-size-calculator","href":"/api-reference/calculators/survey-sample-size-calculator"},{"title":"Synthetic Division Calculator API","deprecated":null,"version":null,"sidebarTitle":"Synthetic Division Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/synthetic-division-calculator","href":"/api-reference/calculators/synthetic-division-calculator"},{"title":"Time Between Dates Calculator API","deprecated":null,"version":null,"sidebarTitle":"Time Between Dates Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/time-between-dates-calculator","href":"/api-reference/calculators/time-between-dates-calculator"},{"title":"Time Zone Meeting Planner API","deprecated":null,"version":null,"sidebarTitle":"Time Zone Meeting Planner","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/time-zone-meeting-planner","href":"/api-reference/calculators/time-zone-meeting-planner"},{"title":"555 Timer Calculator API","deprecated":null,"version":null,"sidebarTitle":"555 Timer Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/timer-555-calculator","href":"/api-reference/calculators/555-timer-calculator"},{"title":"Times Interest Earned Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Times Interest Earned Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/times-interest-earned-ratio-calculator","href":"/api-reference/calculators/times-interest-earned-ratio-calculator"},{"title":"Triangle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Triangle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/triangle-calculator","href":"/api-reference/calculators/triangle-calculator"},{"title":"Truth Table Generator API","deprecated":null,"version":null,"sidebarTitle":"Truth Table Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/truth-table-generator","href":"/api-reference/calculators/truth-table-generator"},{"title":"Uptime \u0026 SLA Calculator API","deprecated":null,"version":null,"sidebarTitle":"Uptime \u0026 SLA Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/uptime-sla-calculator","href":"/api-reference/calculators/uptime-\u0026-sla-calculator"},{"title":"UTM Zone Finder API","deprecated":null,"version":null,"sidebarTitle":"UTM Zone Finder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/utm-zone-finder","href":"/api-reference/calculators/utm-zone-finder"},{"title":"VO2 Max Estimator Calculator API","deprecated":null,"version":null,"sidebarTitle":"VO2 Max Estimator Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vo2-max-estimator-calculator","href":"/api-reference/calculators/vo2-max-estimator-calculator"},{"title":"Water \u0026 Liquid Tank Volume Calculator API","deprecated":null,"version":null,"sidebarTitle":"Water \u0026 Liquid Tank Volume Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/water-liquid-tank-volume-calculator","href":"/api-reference/calculators/water-\u0026-liquid-tank-volume-calculator"},{"title":"Water Hammer Pressure Estimator API","deprecated":null,"version":null,"sidebarTitle":"Water Hammer Pressure Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/water-hammer-pressure-estimator","href":"/api-reference/calculators/water-hammer-pressure-estimator"},{"title":"Wavelength to Frequency Calculator API","deprecated":null,"version":null,"sidebarTitle":"Wavelength to Frequency Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wavelength-frequency-calculator","href":"/api-reference/calculators/wavelength-to-frequency-calculator"},{"title":"Web Vitals Score Calculator API","deprecated":null,"version":null,"sidebarTitle":"Web Vitals Score Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/web-vitals-score-calculator","href":"/api-reference/calculators/web-vitals-score-calculator"},{"title":"Weighted Grade Average Calculator API","deprecated":null,"version":null,"sidebarTitle":"Weighted Grade Average Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/weighted-grade-average-calculator","href":"/api-reference/calculators/weighted-grade-average-calculator"},{"title":"Weld Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Weld Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/weld-size-calculator","href":"/api-reference/calculators/weld-size-calculator"},{"title":"Wire Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Wire Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wire-size-calculator","href":"/api-reference/calculators/wire-size-calculator"},{"title":"Working Hours \u0026 Overtime Calculator API","deprecated":null,"version":null,"sidebarTitle":"Working Hours \u0026 Overtime Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/working-hours-overtime-calculator","href":"/api-reference/calculators/working-hours-\u0026-overtime-calculator"},{"title":"Cross-Stitch Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cross-Stitch Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cross-stitch-size-calculator","href":"/api-reference/calculators/cross-stitch-size-calculator"},{"title":"String Similarity Calculator API","deprecated":null,"version":null,"sidebarTitle":"String Similarity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/string-similarity-calculator","href":"/api-reference/calculators/string-similarity-calculator"},{"title":"Voltage Divider Calculator API","deprecated":null,"version":null,"sidebarTitle":"Voltage Divider Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/voltage-divider-calculator","href":"/api-reference/calculators/voltage-divider-calculator"},{"title":"Reynolds Number Calculator API","deprecated":null,"version":null,"sidebarTitle":"Reynolds Number Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/reynolds-number-calculator","href":"/api-reference/calculators/reynolds-number-calculator"},{"title":"Tap Drill Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Tap Drill Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tap-drill-size-calculator","href":"/api-reference/calculators/tap-drill-size-calculator"},{"title":"Pipe Friction Loss Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pipe Friction Loss Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pipe-friction-loss-calculator","href":"/api-reference/calculators/pipe-friction-loss-calculator"},{"title":"Retaining Wall Pressure Calculator API","deprecated":null,"version":null,"sidebarTitle":"Retaining Wall Pressure Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/retaining-wall-pressure-calculator","href":"/api-reference/calculators/retaining-wall-pressure-calculator"},{"title":"Short Circuit Current Estimator API","deprecated":null,"version":null,"sidebarTitle":"Short Circuit Current Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/short-circuit-current-estimator","href":"/api-reference/calculators/short-circuit-current-estimator"},{"title":"Slope Grade Calculator API","deprecated":null,"version":null,"sidebarTitle":"Slope Grade Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slope-grade-calculator","href":"/api-reference/calculators/slope-grade-calculator"},{"title":"Voltage Drop Calculator API","deprecated":null,"version":null,"sidebarTitle":"Voltage Drop Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/voltage-drop-calculator","href":"/api-reference/calculators/voltage-drop-calculator"},{"title":"Center of Gravity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Center of Gravity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/center-of-gravity-calculator","href":"/api-reference/calculators/center-of-gravity-calculator"},{"title":"ISO Fit Calculator API","deprecated":null,"version":null,"sidebarTitle":"ISO Fit Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/iso-fit-calculator","href":"/api-reference/calculators/iso-fit-calculator"},{"title":"Earthing Grid Resistance Calculator API","deprecated":null,"version":null,"sidebarTitle":"Earthing Grid Resistance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/earthing-grid-resistance-estimator","href":"/api-reference/calculators/earthing-grid-resistance-calculator"},{"title":"Arc Flash Boundary Calculator API","deprecated":null,"version":null,"sidebarTitle":"Arc Flash Boundary Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/arc-flash-boundary-estimator","href":"/api-reference/calculators/arc-flash-boundary-calculator"},{"title":"Current Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Current Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/current-ratio-calculator","href":"/api-reference/calculators/current-ratio-calculator"},{"title":"Quick Ratio Calculator API","deprecated":null,"version":null,"sidebarTitle":"Quick Ratio Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/quick-ratio-calculator","href":"/api-reference/calculators/quick-ratio-calculator"},{"title":"Quotient and Remainder Calculator API","deprecated":null,"version":null,"sidebarTitle":"Quotient and Remainder Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/quotient-and-remainder-calculator","href":"/api-reference/calculators/quotient-and-remainder-calculator"},{"title":"Bloom Filter Parameter Calculator API","deprecated":null,"version":null,"sidebarTitle":"Bloom Filter Parameter Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bloom-filter-parameter-calculator","href":"/api-reference/calculators/bloom-filter-parameter-calculator"},{"title":"Point-Slope Form Calculator API","deprecated":null,"version":null,"sidebarTitle":"Point-Slope Form Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/point-slope-form-calculator","href":"/api-reference/calculators/point-slope-form-calculator"},{"title":"Point to Plane Distance Calculator API","deprecated":null,"version":null,"sidebarTitle":"Point to Plane Distance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/point-to-plane-distance-calculator","href":"/api-reference/calculators/point-to-plane-distance-calculator"},{"title":"Square Footage Calculator API","deprecated":null,"version":null,"sidebarTitle":"Square Footage Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/square-footage-calculator","href":"/api-reference/calculators/square-footage-calculator"},{"title":"Square Root Calculator API","deprecated":null,"version":null,"sidebarTitle":"Square Root Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/square-root-calculator","href":"/api-reference/calculators/square-root-calculator"},{"title":"Unsubscribe Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Unsubscribe Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unsubscribe-rate-calculator","href":"/api-reference/calculators/unsubscribe-rate-calculator"},{"title":"Customer Acquisition Cost Calculator API","deprecated":null,"version":null,"sidebarTitle":"Customer Acquisition Cost Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/customer-acquisition-cost-calculator","href":"/api-reference/calculators/customer-acquisition-cost-calculator"},{"title":"Thread Pool Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Thread Pool Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/thread-pool-size-calculator","href":"/api-reference/calculators/thread-pool-size-calculator"},{"title":"Earthing Conductor Sizing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Earthing Conductor Sizing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/earthing-conductor-sizing-calculator","href":"/api-reference/calculators/earthing-conductor-sizing-calculator"},{"title":"Anchor Bolt Pullout Estimator API","deprecated":null,"version":null,"sidebarTitle":"Anchor Bolt Pullout Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/anchor-bolt-pullout-estimator","href":"/api-reference/calculators/anchor-bolt-pullout-estimator"},{"title":"Yarn Calculator API","deprecated":null,"version":null,"sidebarTitle":"Yarn Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yarn-calculator","href":"/api-reference/calculators/yarn-calculator"},{"title":"ARPU Calculator API","deprecated":null,"version":null,"sidebarTitle":"ARPU Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/arpu-calculator","href":"/api-reference/calculators/arpu-calculator"},{"title":"Tire Size Calculator API","deprecated":null,"version":null,"sidebarTitle":"Tire Size Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tire-size-calculator","href":"/api-reference/calculators/tire-size-calculator"},{"title":"Slope Intercept Form Calculator API","deprecated":null,"version":null,"sidebarTitle":"Slope Intercept Form Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slope-intercept-form-calculator","href":"/api-reference/calculators/slope-intercept-form-calculator"},{"title":"Distance-Speed-Time Triangle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Distance-Speed-Time Triangle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/distance-speed-time-triangle-calculator","href":"/api-reference/calculators/distance-speed-time-triangle-calculator"},{"title":"Destination Point Calculator API","deprecated":null,"version":null,"sidebarTitle":"Destination Point Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/destination-point-calculator","href":"/api-reference/calculators/destination-point-calculator"},{"title":"Survey Traverse Closure Calculator API","deprecated":null,"version":null,"sidebarTitle":"Survey Traverse Closure Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/survey-traverse-closure-calculator","href":"/api-reference/calculators/survey-traverse-closure-calculator"},{"title":"Traverse Adjustment Bowditch API","deprecated":null,"version":null,"sidebarTitle":"Traverse Adjustment Bowditch","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/traverse-adjustment-bowditch","href":"/api-reference/calculators/traverse-adjustment-bowditch"},{"title":"Contour Interval Volume Estimator API","deprecated":null,"version":null,"sidebarTitle":"Contour Interval Volume Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/contour-interval-volume-estimator","href":"/api-reference/calculators/contour-interval-volume-estimator"},{"title":"Brick / Block Calculator API","deprecated":null,"version":null,"sidebarTitle":"Brick / Block Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/brick-block-calculator","href":"/api-reference/calculators/brick-block-calculator"},{"title":"Manning Flow Calculator API","deprecated":null,"version":null,"sidebarTitle":"Manning Flow Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/manning-flow-calculator","href":"/api-reference/calculators/manning-flow-calculator"},{"title":"Pipe Size From Flow Velocity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pipe Size From Flow Velocity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pipe-size-from-flow-velocity-calculator","href":"/api-reference/calculators/pipe-size-from-flow-velocity-calculator"},{"title":"Slope Stability Infinite Slope Calculator API","description":"Calculate the factor of safety of an infinite (planar) slope from slope angle, failure depth, cohesion, friction angle, unit weight and groundwater level. Includes the critical slope angle and how the factor of safety drops as the soil saturates.\n\n[Try Slope Stability Infinite Slope Calculator in your browser →](https://iotools.cloud/tool/slope-stability-infinite-slope-calculator/)","deprecated":null,"version":null,"sidebarTitle":"Slope Stability Infinite Slope Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slope-stability-infinite-slope-calculator","href":"/api-reference/calculators/slope-stability-infinite-slope-calculator"},{"title":"Construction Schedule Calculator API","deprecated":null,"version":null,"sidebarTitle":"Construction Schedule Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/construction-schedule-calculator","href":"/api-reference/calculators/construction-schedule-calculator"},{"title":"Compaction Control Calculator API","description":"Check field density test results against the Proctor maximum: dry density, relative compaction vs. a required percentage, moisture deviation from optimum, plus optional relative density and air voids.\n\n[Try Compaction Control Calculator in your browser →](https://iotools.cloud/tool/compaction-control-calculator/)","deprecated":null,"version":null,"sidebarTitle":"Compaction Control Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/compaction-control-calculator","href":"/api-reference/calculators/compaction-control-calculator"},{"title":"Expand Polynomials Calculator API","deprecated":null,"version":null,"sidebarTitle":"Expand Polynomials Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/expand-polynomials-calculator","href":"/api-reference/calculators/expand-polynomials-calculator"},{"title":"Polynomial Long Division Calculator API","deprecated":null,"version":null,"sidebarTitle":"Polynomial Long Division Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/polynomial-long-division-calculator","href":"/api-reference/calculators/polynomial-long-division-calculator"},{"title":"Polynomial Factoring Calculator API","deprecated":null,"version":null,"sidebarTitle":"Polynomial Factoring Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/polynomial-factoring-calculator","href":"/api-reference/calculators/polynomial-factoring-calculator"},{"title":"System of Linear Equations Solver API","deprecated":null,"version":null,"sidebarTitle":"System of Linear Equations Solver","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/system-of-linear-equations-solver","href":"/api-reference/calculators/system-of-linear-equations-solver"},{"title":"Roof Pitch Calculator API","deprecated":null,"version":null,"sidebarTitle":"Roof Pitch Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/roof-pitch-calculator","href":"/api-reference/calculators/roof-pitch-calculator"},{"title":"Fence Calculator API","deprecated":null,"version":null,"sidebarTitle":"Fence Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/fence-calculator","href":"/api-reference/calculators/fence-calculator"},{"title":"Earthwork Cut/Fill Calculator API","deprecated":null,"version":null,"sidebarTitle":"Earthwork Cut/Fill Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/earthwork-cut-fill-calculator","href":"/api-reference/calculators/earthwork-cutfill-calculator"},{"title":"Weir Discharge Calculator API","deprecated":null,"version":null,"sidebarTitle":"Weir Discharge Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/weir-discharge-calculator","href":"/api-reference/calculators/weir-discharge-calculator"},{"title":"Polynomial Roots Calculator API","deprecated":null,"version":null,"sidebarTitle":"Polynomial Roots Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/polynomial-roots-calculator","href":"/api-reference/calculators/polynomial-roots-calculator"},{"title":"Standard Form to Slope Intercept Converter API","deprecated":null,"version":null,"sidebarTitle":"Standard Form to Slope Intercept Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/standard-form-to-slope-intercept-converter","href":"/api-reference/calculators/standard-form-to-slope-intercept-converter"},{"title":"Complex Numbers Calculator API","deprecated":null,"version":null,"sidebarTitle":"Complex Numbers Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/complex-numbers-calculator","href":"/api-reference/calculators/complex-numbers-calculator"},{"title":"Derangement (Subfactorial) Calculator API","deprecated":null,"version":null,"sidebarTitle":"Derangement (Subfactorial) Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/derangement-calculator","href":"/api-reference/calculators/derangement-subfactorial-calculator"},{"title":"Euler's Method Calculator API","deprecated":null,"version":null,"sidebarTitle":"Euler's Method Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/eulers-method-calculator","href":"/api-reference/calculators/eulers-method-calculator"},{"title":"Euler Characteristic Calculator API","deprecated":null,"version":null,"sidebarTitle":"Euler Characteristic Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/euler-characteristic-calculator","href":"/api-reference/calculators/euler-characteristic-calculator"},{"title":"Tangent Line to Circle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Tangent Line to Circle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tangent-line-to-circle-calculator","href":"/api-reference/calculators/tangent-line-to-circle-calculator"},{"title":"Trapezoid Calculator API","deprecated":null,"version":null,"sidebarTitle":"Trapezoid Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/trapezoid-calculator","href":"/api-reference/calculators/trapezoid-calculator"},{"title":"Cylinder Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cylinder Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cylinder-calculator","href":"/api-reference/calculators/cylinder-calculator"},{"title":"Slope Calculator API","deprecated":null,"version":null,"sidebarTitle":"Slope Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/slope-calculator","href":"/api-reference/calculators/slope-calculator"},{"title":"Distance Between Two Points Calculator API","deprecated":null,"version":null,"sidebarTitle":"Distance Between Two Points Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/distance-between-two-points-calculator","href":"/api-reference/calculators/distance-between-two-points-calculator"},{"title":"Paver Calculator API","deprecated":null,"version":null,"sidebarTitle":"Paver Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/paver-calculator","href":"/api-reference/calculators/paver-calculator"},{"title":"Exponents Calculator API","deprecated":null,"version":null,"sidebarTitle":"Exponents Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/exponents-calculator","href":"/api-reference/calculators/exponents-calculator"},{"title":"Hazen-Williams Calculator API","deprecated":null,"version":null,"sidebarTitle":"Hazen-Williams Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hazen-williams-calculator","href":"/api-reference/calculators/hazen-williams-calculator"},{"title":"Chainage / Stationing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Chainage / Stationing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/chainage-stationing-calculator","href":"/api-reference/calculators/chainage-stationing-calculator"},{"title":"Pipe Pressure Drop Calculator API","deprecated":null,"version":null,"sidebarTitle":"Pipe Pressure Drop Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pipe-pressure-drop-calculator","href":"/api-reference/calculators/pipe-pressure-drop-calculator"},{"title":"BOQ Estimator API","deprecated":null,"version":null,"sidebarTitle":"BOQ Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/boq-estimator","href":"/api-reference/calculators/boq-estimator"},{"title":"Earned Value Calculator API","deprecated":null,"version":null,"sidebarTitle":"Earned Value Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/earned-value-calculator","href":"/api-reference/calculators/earned-value-calculator"},{"title":"NPSH Available Calculator API","deprecated":null,"version":null,"sidebarTitle":"NPSH Available Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/npsh-available-calculator","href":"/api-reference/calculators/npsh-available-calculator"},{"title":"Miter Angle Calculator API","deprecated":null,"version":null,"sidebarTitle":"Miter Angle Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/miter-angle-calculator","href":"/api-reference/calculators/miter-angle-calculator"},{"title":"Squareness Checker API","deprecated":null,"version":null,"sidebarTitle":"Squareness Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/squareness-checker","href":"/api-reference/calculators/squareness-checker"},{"title":"Sphere Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sphere Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sphere-calculator","href":"/api-reference/calculators/sphere-calculator"},{"title":"Triangle Centroid Calculator API","deprecated":null,"version":null,"sidebarTitle":"Triangle Centroid Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/triangle-centroid-calculator","href":"/api-reference/calculators/triangle-centroid-calculator"},{"title":"Steel Weight Calculator API","deprecated":null,"version":null,"sidebarTitle":"Steel Weight Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/steel-weight-calculator","href":"/api-reference/calculators/steel-weight-calculator"},{"title":"Wallpaper Calculator API","deprecated":null,"version":null,"sidebarTitle":"Wallpaper Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wallpaper-calculator","href":"/api-reference/calculators/wallpaper-calculator"},{"title":"Frustum Calculator API","deprecated":null,"version":null,"sidebarTitle":"Frustum Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/frustum-calculator","href":"/api-reference/calculators/frustum-calculator"},{"title":"Decking Calculator API","deprecated":null,"version":null,"sidebarTitle":"Decking Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/decking-calculator","href":"/api-reference/calculators/decking-calculator"},{"title":"Brick and Mortar Calculator API","deprecated":null,"version":null,"sidebarTitle":"Brick and Mortar Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/brick-and-mortar-calculator","href":"/api-reference/calculators/brick-and-mortar-calculator"},{"title":"Polygon Diagonals Calculator API","deprecated":null,"version":null,"sidebarTitle":"Polygon Diagonals Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/polygon-diagonals-calculator","href":"/api-reference/calculators/polygon-diagonals-calculator"},{"title":"Series Convergence Test Calculator API","deprecated":null,"version":null,"sidebarTitle":"Series Convergence Test Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/series-convergence-test-calculator","href":"/api-reference/calculators/series-convergence-test-calculator"},{"title":"Stirling Numbers Calculator API","deprecated":null,"version":null,"sidebarTitle":"Stirling Numbers Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/stirling-numbers-calculator","href":"/api-reference/calculators/stirling-numbers-calculator"},{"title":"Torus Calculator API","deprecated":null,"version":null,"sidebarTitle":"Torus Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/torus-calculator","href":"/api-reference/calculators/torus-calculator"},{"title":"Triangle Orthocenter Calculator API","deprecated":null,"version":null,"sidebarTitle":"Triangle Orthocenter Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/triangle-orthocenter-calculator","href":"/api-reference/calculators/triangle-orthocenter-calculator"},{"title":"Soil Bearing Capacity Calculator API","deprecated":null,"version":null,"sidebarTitle":"Soil Bearing Capacity Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/soil-bearing-capacity-calculator","href":"/api-reference/calculators/soil-bearing-capacity-calculator"},{"title":"Air Change Rate Calculator API","deprecated":null,"version":null,"sidebarTitle":"Air Change Rate Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/air-change-rate-calculator","href":"/api-reference/calculators/air-change-rate-calculator"},{"title":"Sourdough Calculator API","deprecated":null,"version":null,"sidebarTitle":"Sourdough Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sourdough-calculator","href":"/api-reference/calculators/sourdough-calculator"},{"title":"CGPA to Percentage Converter API","deprecated":null,"version":null,"sidebarTitle":"CGPA to Percentage Converter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cgpa-to-percentage-converter","href":"/api-reference/calculators/cgpa-to-percentage-converter"},{"title":"Infinite Series Sum Calculator API","deprecated":null,"version":null,"sidebarTitle":"Infinite Series Sum Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/infinite-series-sum-calculator","href":"/api-reference/calculators/infinite-series-sum-calculator"},{"title":"Maclaurin Series Calculator API","deprecated":null,"version":null,"sidebarTitle":"Maclaurin Series Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/maclaurin-series-calculator","href":"/api-reference/calculators/maclaurin-series-calculator"},{"title":"Cooling Tower Approach \u0026 Range Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cooling Tower Approach \u0026 Range Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cooling-tower-approach-range-calculator","href":"/api-reference/calculators/cooling-tower-approach-\u0026-range-calculator"},{"title":"Rainwater Harvesting Tank Sizing Calculator API","deprecated":null,"version":null,"sidebarTitle":"Rainwater Harvesting Tank Sizing Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rainwater-harvesting-tank-sizing","href":"/api-reference/calculators/rainwater-harvesting-tank-sizing-calculator"}]},{"group":"Editors","pages":[{"title":"3-Way Text Diff \u0026 Merge Viewer API","deprecated":null,"version":null,"sidebarTitle":"3-Way Text Diff \u0026 Merge Viewer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/3-way-text-diff-merge-viewer","href":"/api-reference/editors/3-way-text-diff-\u0026-merge-viewer"},{"title":"Duplicate Lines Remover API","deprecated":null,"version":null,"sidebarTitle":"Duplicate Lines Remover","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/duplicate-lines-remover","href":"/api-reference/editors/duplicate-lines-remover"},{"title":"Git Conflict Remover API","deprecated":null,"version":null,"sidebarTitle":"Git Conflict Remover","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/git-conflict-remover","href":"/api-reference/editors/git-conflict-remover"},{"title":"Line Tools API","deprecated":null,"version":null,"sidebarTitle":"Line Tools","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/line-tools","href":"/api-reference/editors/line-tools"},{"title":"Markdown Editor API","deprecated":null,"version":null,"sidebarTitle":"Markdown Editor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-editor","href":"/api-reference/editors/markdown-editor"},{"title":"Grammar Checker API","deprecated":null,"version":null,"sidebarTitle":"Grammar Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/grammar-checker","href":"/api-reference/editors/grammar-checker"},{"title":"AI Humanizer API","deprecated":null,"version":null,"sidebarTitle":"AI Humanizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-humanizer","href":"/api-reference/editors/ai-humanizer"}]},{"group":"Utilities","pages":[{"title":"Accessible Color Pair Finder API","deprecated":null,"version":null,"sidebarTitle":"Accessible Color Pair Finder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/accessible-color-pair-finder","href":"/api-reference/utilities/accessible-color-pair-finder"},{"title":"AI Bot Access Tester API","deprecated":null,"version":null,"sidebarTitle":"AI Bot Access Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-bot-access-tester","href":"/api-reference/utilities/ai-bot-access-tester"},{"title":"API Secret Scanner \u0026 Redactor API","deprecated":null,"version":null,"sidebarTitle":"API Secret Scanner \u0026 Redactor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/api-secret-scanner-redactor","href":"/api-reference/utilities/api-secret-scanner-\u0026-redactor"},{"title":"ASN.1 / DER Parser API","deprecated":null,"version":null,"sidebarTitle":"ASN.1 / DER Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/asn1-parser","href":"/api-reference/utilities/asn1-der-parser"},{"title":"Barcode Check Digit Validator API","deprecated":null,"version":null,"sidebarTitle":"Barcode Check Digit Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/barcode-check-digit-validator","href":"/api-reference/utilities/barcode-check-digit-validator"},{"title":"Base64 Inspector API","deprecated":null,"version":null,"sidebarTitle":"Base64 Inspector","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/base64-inspector","href":"/api-reference/utilities/base64-inspector"},{"title":"BIN/IIN Card Network Checker API","deprecated":null,"version":null,"sidebarTitle":"BIN/IIN Card Network Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bin-iin-lookup","href":"/api-reference/utilities/biniin-card-network-checker"},{"title":"Bitcoin Address Validator API","deprecated":null,"version":null,"sidebarTitle":"Bitcoin Address Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bitcoin-address-validator","href":"/api-reference/utilities/bitcoin-address-validator"},{"title":"Bulk AMP Validator API","deprecated":null,"version":null,"sidebarTitle":"Bulk AMP Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/bulk-amp-validator","href":"/api-reference/utilities/bulk-amp-validator"},{"title":"Google Cache Checker API","deprecated":null,"version":null,"sidebarTitle":"Google Cache Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/google-cache-checker","href":"/api-reference/utilities/google-cache-checker"},{"title":"Certificate Transparency Log Lookup API","deprecated":null,"version":null,"sidebarTitle":"Certificate Transparency Log Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/certificate-transparency-log-lookup","href":"/api-reference/utilities/certificate-transparency-log-lookup"},{"title":"Character Encoding Detector API","deprecated":null,"version":null,"sidebarTitle":"Character Encoding Detector","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/character-encoding-detector","href":"/api-reference/utilities/character-encoding-detector"},{"title":"Character Frequency Analyzer API","deprecated":null,"version":null,"sidebarTitle":"Character Frequency Analyzer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/character-frequency-analyzer","href":"/api-reference/utilities/character-frequency-analyzer"},{"title":"CIDR Overlap Checker API","deprecated":null,"version":null,"sidebarTitle":"CIDR Overlap Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cidr-overlap-checker","href":"/api-reference/utilities/cidr-overlap-checker"},{"title":"Cloaking Checker API","deprecated":null,"version":null,"sidebarTitle":"Cloaking Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cloaking-checker","href":"/api-reference/utilities/cloaking-checker"},{"title":"Color Contrast Grid API","deprecated":null,"version":null,"sidebarTitle":"Color Contrast Grid","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-contrast-grid","href":"/api-reference/utilities/color-contrast-grid"},{"title":"Color Distance Calculator API","deprecated":null,"version":null,"sidebarTitle":"Color Distance Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-distance-calculator","href":"/api-reference/utilities/color-distance-calculator"},{"title":"Color Picker API","deprecated":null,"version":null,"sidebarTitle":"Color Picker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/color-picker","href":"/api-reference/utilities/color-picker"},{"title":"Cookie Parser API","deprecated":null,"version":null,"sidebarTitle":"Cookie Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cookie-parser","href":"/api-reference/utilities/cookie-parser"},{"title":"Course Playlist Extractor API","deprecated":null,"version":null,"sidebarTitle":"Course Playlist Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/course-playlist-extractor","href":"/api-reference/utilities/course-playlist-extractor"},{"title":"Country Info Lookup API","deprecated":null,"version":null,"sidebarTitle":"Country Info Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/country-info-lookup","href":"/api-reference/utilities/country-info-lookup"},{"title":"Cron Expression Explainer API","deprecated":null,"version":null,"sidebarTitle":"Cron Expression Explainer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cron-expression-explainer","href":"/api-reference/utilities/cron-expression-explainer"},{"title":"Cron Next Run Calculator API","deprecated":null,"version":null,"sidebarTitle":"Cron Next Run Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/cron-next-run-calculator","href":"/api-reference/utilities/cron-next-run-calculator"},{"title":"CSP Resource Evaluator API","deprecated":null,"version":null,"sidebarTitle":"CSP Resource Evaluator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csp-resource-evaluator","href":"/api-reference/utilities/csp-resource-evaluator"},{"title":"Basic Auth Decoder API","deprecated":null,"version":null,"sidebarTitle":"Basic Auth Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/basic-auth-decoder","href":"/api-reference/utilities/basic-auth-decoder"},{"title":"CSS Custom Property Extractor API","deprecated":null,"version":null,"sidebarTitle":"CSS Custom Property Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-custom-property-extractor","href":"/api-reference/utilities/css-custom-property-extractor"},{"title":"CSS Validator API","deprecated":null,"version":null,"sidebarTitle":"CSS Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/css-validator","href":"/api-reference/utilities/css-validator"},{"title":"CSV Column Extractor API","deprecated":null,"version":null,"sidebarTitle":"CSV Column Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-column-extractor","href":"/api-reference/utilities/csv-column-extractor"},{"title":"CSV Pivot Table Generator API","deprecated":null,"version":null,"sidebarTitle":"CSV Pivot Table Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-pivot-table-generator","href":"/api-reference/utilities/csv-pivot-table-generator"},{"title":"CSV Profiler API","deprecated":null,"version":null,"sidebarTitle":"CSV Profiler","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-profiler","href":"/api-reference/utilities/csv-profiler"},{"title":"CSV Random Sampler API","deprecated":null,"version":null,"sidebarTitle":"CSV Random Sampler","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/csv-random-sampler","href":"/api-reference/utilities/csv-random-sampler"},{"title":"DNS Lookup API","deprecated":null,"version":null,"sidebarTitle":"DNS Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dns-lookup","href":"/api-reference/utilities/dns-lookup"},{"title":"DNS Propagation Checker API","deprecated":null,"version":null,"sidebarTitle":"DNS Propagation Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dns-propagation-checker","href":"/api-reference/utilities/dns-propagation-checker"},{"title":"Dockerfile Linter API","deprecated":null,"version":null,"sidebarTitle":"Dockerfile Linter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dockerfile-linter","href":"/api-reference/utilities/dockerfile-linter"},{"title":"Domain Extractor API","deprecated":null,"version":null,"sidebarTitle":"Domain Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/domain-extractor","href":"/api-reference/utilities/domain-extractor"},{"title":"Dotenv Diff Checker API","deprecated":null,"version":null,"sidebarTitle":"Dotenv Diff Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dotenv-diff-checker","href":"/api-reference/utilities/dotenv-diff-checker"},{"title":"Email Deliverability Checker API","deprecated":null,"version":null,"sidebarTitle":"Email Deliverability Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/email-deliverability-checker","href":"/api-reference/utilities/email-deliverability-checker"},{"title":"Email Extractor API","deprecated":null,"version":null,"sidebarTitle":"Email Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/email-extractor","href":"/api-reference/utilities/email-extractor"},{"title":"Email Header Analyzer API","deprecated":null,"version":null,"sidebarTitle":"Email Header Analyzer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/email-header-analyzer","href":"/api-reference/utilities/email-header-analyzer"},{"title":"Email Normalizer API","deprecated":null,"version":null,"sidebarTitle":"Email Normalizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/email-normalizer","href":"/api-reference/utilities/email-normalizer"},{"title":"Emoji Picker API","deprecated":null,"version":null,"sidebarTitle":"Emoji Picker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/emoji-picker","href":"/api-reference/utilities/emoji-picker"},{"title":"Env Var Template Expander API","deprecated":null,"version":null,"sidebarTitle":"Env Var Template Expander","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/env-var-template-expander","href":"/api-reference/utilities/env-var-template-expander"},{"title":"Ethereum Checksum Validator API","deprecated":null,"version":null,"sidebarTitle":"Ethereum Checksum Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ethereum-checksum-validator","href":"/api-reference/utilities/ethereum-checksum-validator"},{"title":"EXIF Remover API","deprecated":null,"version":null,"sidebarTitle":"EXIF Remover","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/exif-remover","href":"/api-reference/utilities/exif-remover"},{"title":"File Extension Lookup API","deprecated":null,"version":null,"sidebarTitle":"File Extension Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/file-extension-lookup","href":"/api-reference/utilities/file-extension-lookup"},{"title":"File Hash Calculator API","deprecated":null,"version":null,"sidebarTitle":"File Hash Calculator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/file-hash-calculator","href":"/api-reference/utilities/file-hash-calculator"},{"title":"Git Cheat Sheet API","deprecated":null,"version":null,"sidebarTitle":"Git Cheat Sheet","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/git-cheatsheet","href":"/api-reference/utilities/git-cheat-sheet"},{"title":"GitHub Actions YAML Linter API","deprecated":null,"version":null,"sidebarTitle":"GitHub Actions YAML Linter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/github-actions-yaml-linter","href":"/api-reference/utilities/github-actions-yaml-linter"},{"title":"Gzip/Zlib/Deflate Tester API","deprecated":null,"version":null,"sidebarTitle":"Gzip/Zlib/Deflate Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/gzip-zlib-deflate-tester","href":"/api-reference/utilities/gzipzlibdeflate-tester"},{"title":"HAR File Performance Analyzer API","deprecated":null,"version":null,"sidebarTitle":"HAR File Performance Analyzer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/har-file-performance-analyzer","href":"/api-reference/utilities/har-file-performance-analyzer"},{"title":"Hex Dump Viewer API","deprecated":null,"version":null,"sidebarTitle":"Hex Dump Viewer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hex-dump-viewer","href":"/api-reference/utilities/hex-dump-viewer"},{"title":".htaccess Tester API","deprecated":null,"version":null,"sidebarTitle":".htaccess Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/htaccess-tester","href":"/api-reference/utilities/htaccess-tester"},{"title":"HTML Heading Extractor API","deprecated":null,"version":null,"sidebarTitle":"HTML Heading Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-heading-extractor","href":"/api-reference/utilities/html-heading-extractor"},{"title":"HTML Link Extractor API","deprecated":null,"version":null,"sidebarTitle":"HTML Link Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-link-extractor","href":"/api-reference/utilities/html-link-extractor"},{"title":"hreflang Tags Tester API","deprecated":null,"version":null,"sidebarTitle":"hreflang Tags Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/hreflang-tags-tester","href":"/api-reference/utilities/hreflang-tags-tester"},{"title":"HTML Validator API","deprecated":null,"version":null,"sidebarTitle":"HTML Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-validator","href":"/api-reference/utilities/html-validator"},{"title":"HTTP Header Analyzer API","deprecated":null,"version":null,"sidebarTitle":"HTTP Header Analyzer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/http-header-analyzer","href":"/api-reference/utilities/http-header-analyzer"},{"title":"HTTP Status Codes API","deprecated":null,"version":null,"sidebarTitle":"HTTP Status Codes","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/http-status-codes","href":"/api-reference/utilities/http-status-codes"},{"title":"IBAN Validator API","deprecated":null,"version":null,"sidebarTitle":"IBAN Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/iban-validator","href":"/api-reference/utilities/iban-validator"},{"title":"Image Translator API","deprecated":null,"version":null,"sidebarTitle":"Image Translator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/image-translator","href":"/api-reference/utilities/image-translator"},{"title":"ISBN Validator API","deprecated":null,"version":null,"sidebarTitle":"ISBN Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/isbn-validator","href":"/api-reference/utilities/isbn-validator"},{"title":"Java Regex Tester API","deprecated":null,"version":null,"sidebarTitle":"Java Regex Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/java-regex-tester","href":"/api-reference/utilities/java-regex-tester"},{"title":"JSON Compare API","deprecated":null,"version":null,"sidebarTitle":"JSON Compare","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-compare","href":"/api-reference/utilities/json-compare"},{"title":"JSON Key Extractor API","deprecated":null,"version":null,"sidebarTitle":"JSON Key Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-key-extractor","href":"/api-reference/utilities/json-key-extractor"},{"title":"Twitter Character Counter API","deprecated":null,"version":null,"sidebarTitle":"Twitter Character Counter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/twitter-character-counter","href":"/api-reference/utilities/twitter-character-counter"},{"title":"JSONPath Tester API","deprecated":null,"version":null,"sidebarTitle":"JSONPath Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jsonpath-tester","href":"/api-reference/utilities/jsonpath-tester"},{"title":"JWT Decoder API","deprecated":null,"version":null,"sidebarTitle":"JWT Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jwt-decode","href":"/api-reference/utilities/jwt-decoder"},{"title":"JWT Expiry Checker API","deprecated":null,"version":null,"sidebarTitle":"JWT Expiry Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jwt-expiry-checker","href":"/api-reference/utilities/jwt-expiry-checker"},{"title":"JWT Verifier API","deprecated":null,"version":null,"sidebarTitle":"JWT Verifier","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/jwt-verifier","href":"/api-reference/utilities/jwt-verifier"},{"title":"JavaScript Keycode Info API","deprecated":null,"version":null,"sidebarTitle":"JavaScript Keycode Info","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/keycode-info","href":"/api-reference/utilities/javascript-keycode-info"},{"title":"Kubernetes YAML Validator API","deprecated":null,"version":null,"sidebarTitle":"Kubernetes YAML Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/kubernetes-yaml-validator","href":"/api-reference/utilities/kubernetes-yaml-validator"},{"title":"JSON Pointer Evaluator API","deprecated":null,"version":null,"sidebarTitle":"JSON Pointer Evaluator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-pointer-evaluator","href":"/api-reference/utilities/json-pointer-evaluator"},{"title":"Line Counter API","deprecated":null,"version":null,"sidebarTitle":"Line Counter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/line-counter","href":"/api-reference/utilities/line-counter"},{"title":"List Set Operations API","deprecated":null,"version":null,"sidebarTitle":"List Set Operations","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/list-set-operations","href":"/api-reference/utilities/list-set-operations"},{"title":"LLM Token Count Estimator API","deprecated":null,"version":null,"sidebarTitle":"LLM Token Count Estimator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/llm-token-count-estimator","href":"/api-reference/utilities/llm-token-count-estimator"},{"title":"Luhn Algorithm Validator API","deprecated":null,"version":null,"sidebarTitle":"Luhn Algorithm Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/luhn-algorithm-validator","href":"/api-reference/utilities/luhn-algorithm-validator"},{"title":"LZ4 Compression Tool API","deprecated":null,"version":null,"sidebarTitle":"LZ4 Compression Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/lz4-compression","href":"/api-reference/utilities/lz4-compression-tool"},{"title":"Markdown Link \u0026 Image Extractor API","deprecated":null,"version":null,"sidebarTitle":"Markdown Link \u0026 Image Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-link-image-extractor","href":"/api-reference/utilities/markdown-link-\u0026-image-extractor"},{"title":"Markdown Outline Extractor API","deprecated":null,"version":null,"sidebarTitle":"Markdown Outline Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/markdown-outline-extractor","href":"/api-reference/utilities/markdown-outline-extractor"},{"title":"MIME Type Lookup API","deprecated":null,"version":null,"sidebarTitle":"MIME Type Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mime-type-lookup","href":"/api-reference/utilities/mime-type-lookup"},{"title":"MIME Types Cheatsheet API","deprecated":null,"version":null,"sidebarTitle":"MIME Types Cheatsheet","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mime-types-cheatsheet","href":"/api-reference/utilities/mime-types-cheatsheet"},{"title":"Mobile-First Index Checker API","deprecated":null,"version":null,"sidebarTitle":"Mobile-First Index Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mobile-first-index-checker","href":"/api-reference/utilities/mobile-first-index-checker"},{"title":"Mobile-Friendly Test API","deprecated":null,"version":null,"sidebarTitle":"Mobile-Friendly Test","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mobile-friendly-test","href":"/api-reference/utilities/mobile-friendly-test"},{"title":"N-gram Extractor API","deprecated":null,"version":null,"sidebarTitle":"N-gram Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ngram-extractor","href":"/api-reference/utilities/n-gram-extractor"},{"title":"PDF Signature Checker API","deprecated":null,"version":null,"sidebarTitle":"PDF Signature Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-signature-checker","href":"/api-reference/utilities/pdf-signature-checker"},{"title":"PDF Summarizer API","deprecated":null,"version":null,"sidebarTitle":"PDF Summarizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-summarizer","href":"/api-reference/utilities/pdf-summarizer"},{"title":"Translate PDF API","deprecated":null,"version":null,"sidebarTitle":"Translate PDF","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/translate-pdf","href":"/api-reference/utilities/translate-pdf"},{"title":"Question Generator API","deprecated":null,"version":null,"sidebarTitle":"Question Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/pdf-question-generator","href":"/api-reference/utilities/question-generator"},{"title":"Password Policy Tester API","deprecated":null,"version":null,"sidebarTitle":"Password Policy Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/password-policy-tester","href":"/api-reference/utilities/password-policy-tester"},{"title":"Password Strength Analyzer API","deprecated":null,"version":null,"sidebarTitle":"Password Strength Analyzer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/password-strength-analyzer","href":"/api-reference/utilities/password-strength-analyzer"},{"title":"Phone Number Extractor API","deprecated":null,"version":null,"sidebarTitle":"Phone Number Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/phone-number-extractor","href":"/api-reference/utilities/phone-number-extractor"},{"title":"Phone Number Validator API","deprecated":null,"version":null,"sidebarTitle":"Phone Number Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/phone-number-validator","href":"/api-reference/utilities/phone-number-validator"},{"title":"Port Lookup API","deprecated":null,"version":null,"sidebarTitle":"Port Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/port-lookup","href":"/api-reference/utilities/port-lookup"},{"title":"SSL Certificate Decoder API","deprecated":null,"version":null,"sidebarTitle":"SSL Certificate Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ssl-certificate-decoder","href":"/api-reference/utilities/ssl-certificate-decoder"},{"title":"MAC Address Lookup API","deprecated":null,"version":null,"sidebarTitle":"MAC Address Lookup","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/mac-address-lookup","href":"/api-reference/utilities/mac-address-lookup"},{"title":"Open Graph Checker API","deprecated":null,"version":null,"sidebarTitle":"Open Graph Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/open-graph-checker","href":"/api-reference/utilities/open-graph-checker"},{"title":"Readability Score Checker API","deprecated":null,"version":null,"sidebarTitle":"Readability Score Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/readability-score","href":"/api-reference/utilities/readability-score-checker"},{"title":"Regex Cheatsheet API","deprecated":null,"version":null,"sidebarTitle":"Regex Cheatsheet","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/regex-cheatsheet","href":"/api-reference/utilities/regex-cheatsheet"},{"title":"Regex Explainer API","deprecated":null,"version":null,"sidebarTitle":"Regex Explainer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/regex-explainer","href":"/api-reference/utilities/regex-explainer"},{"title":"Regex Tester API","deprecated":null,"version":null,"sidebarTitle":"Regex Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/regex-tester","href":"/api-reference/utilities/regex-tester"},{"title":"Robots.txt Tester API","deprecated":null,"version":null,"sidebarTitle":"Robots.txt Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/robots-txt-tester","href":"/api-reference/utilities/robotstxt-tester"},{"title":"Routing Number Validator API","deprecated":null,"version":null,"sidebarTitle":"Routing Number Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/routing-number-validator","href":"/api-reference/utilities/routing-number-validator"},{"title":"RSS Feed Parser API","deprecated":null,"version":null,"sidebarTitle":"RSS Feed Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/rss-feed-parser","href":"/api-reference/utilities/rss-feed-parser"},{"title":"SafeLink Decoder API","deprecated":null,"version":null,"sidebarTitle":"SafeLink Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/safelink-decoder","href":"/api-reference/utilities/safelink-decoder"},{"title":"SAML Response Decoder API","deprecated":null,"version":null,"sidebarTitle":"SAML Response Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/saml-response-decoder","href":"/api-reference/utilities/saml-response-decoder"},{"title":"Security Headers Checker API","deprecated":null,"version":null,"sidebarTitle":"Security Headers Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/security-headers-checker","href":"/api-reference/utilities/security-headers-checker"},{"title":"Secure Compare Tool API","deprecated":null,"version":null,"sidebarTitle":"Secure Compare Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/secure-compare-tool","href":"/api-reference/utilities/secure-compare-tool"},{"title":"Sitemap XML Parser API","deprecated":null,"version":null,"sidebarTitle":"Sitemap XML Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/sitemap-xml-parser","href":"/api-reference/utilities/sitemap-xml-parser"},{"title":"Redirect Checker API","deprecated":null,"version":null,"sidebarTitle":"Redirect Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/redirect-checker","href":"/api-reference/utilities/redirect-checker"},{"title":"HTML Meta Extractor API","deprecated":null,"version":null,"sidebarTitle":"HTML Meta Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/html-meta-extractor","href":"/api-reference/utilities/html-meta-extractor"},{"title":"Text Compare API","deprecated":null,"version":null,"sidebarTitle":"Text Compare","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-compare","href":"/api-reference/utilities/text-compare"},{"title":"URL Parser API","deprecated":null,"version":null,"sidebarTitle":"URL Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-parser","href":"/api-reference/utilities/url-parser"},{"title":"Unicode Character Info API","deprecated":null,"version":null,"sidebarTitle":"Unicode Character Info","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/unicode-character-info","href":"/api-reference/utilities/unicode-character-info"},{"title":"URL Canonicalizer API","deprecated":null,"version":null,"sidebarTitle":"URL Canonicalizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-canonicalizer","href":"/api-reference/utilities/url-canonicalizer"},{"title":"URL Extractor API","deprecated":null,"version":null,"sidebarTitle":"URL Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-extractor","href":"/api-reference/utilities/url-extractor"},{"title":"AI URL Summarizer API","deprecated":null,"version":null,"sidebarTitle":"AI URL Summarizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-summarizer","href":"/api-reference/utilities/ai-url-summarizer"},{"title":"URL Heading Extractor API","deprecated":null,"version":null,"sidebarTitle":"URL Heading Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-headings","href":"/api-reference/utilities/url-heading-extractor"},{"title":"URL to IP API","deprecated":null,"version":null,"sidebarTitle":"URL to IP","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-ip","href":"/api-reference/utilities/url-to-ip"},{"title":"Domain Hosting Checker API","deprecated":null,"version":null,"sidebarTitle":"Domain Hosting Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/domain-hosting-checker","href":"/api-reference/utilities/domain-hosting-checker"},{"title":"URL to Links API","deprecated":null,"version":null,"sidebarTitle":"URL to Links","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/url-to-links","href":"/api-reference/utilities/url-to-links"},{"title":"User Agent Parser API","deprecated":null,"version":null,"sidebarTitle":"User Agent Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/user-agent-parser","href":"/api-reference/utilities/user-agent-parser"},{"title":"WCAG Contrast Checker API","deprecated":null,"version":null,"sidebarTitle":"WCAG Contrast Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/wcag-contrast-checker","href":"/api-reference/utilities/wcag-contrast-checker"},{"title":"Webhook Payload Inspector API","deprecated":null,"version":null,"sidebarTitle":"Webhook Payload Inspector","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/webhook-payload-inspector","href":"/api-reference/utilities/webhook-payload-inspector"},{"title":"Webhook Signature Validator API","deprecated":null,"version":null,"sidebarTitle":"Webhook Signature Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/webhook-signature-validator","href":"/api-reference/utilities/webhook-signature-validator"},{"title":"Word Frequency Counter API","deprecated":null,"version":null,"sidebarTitle":"Word Frequency Counter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/word-frequency","href":"/api-reference/utilities/word-frequency-counter"},{"title":"YAML Diff Comparator API","deprecated":null,"version":null,"sidebarTitle":"YAML Diff Comparator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/yaml-diff-comparator","href":"/api-reference/utilities/yaml-diff-comparator"},{"title":"Word Counter API","deprecated":null,"version":null,"sidebarTitle":"Word Counter","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/word-counter","href":"/api-reference/utilities/word-counter"},{"title":"XPath Tester API","deprecated":null,"version":null,"sidebarTitle":"XPath Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xpath-tester","href":"/api-reference/utilities/xpath-tester"},{"title":"YouTube Thumbnail Downloader API","deprecated":null,"version":null,"sidebarTitle":"YouTube Thumbnail Downloader","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/youtube-thumbnail-downloader","href":"/api-reference/utilities/youtube-thumbnail-downloader"},{"title":"YouTube Playlist Extractor API","deprecated":null,"version":null,"sidebarTitle":"YouTube Playlist Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/youtube-playlist-extractor","href":"/api-reference/utilities/youtube-playlist-extractor"},{"title":"Vimeo Playlist Extractor API","deprecated":null,"version":null,"sidebarTitle":"Vimeo Playlist Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vimeo-playlist-extractor","href":"/api-reference/utilities/vimeo-playlist-extractor"},{"title":"Dailymotion Playlist Extractor API","deprecated":null,"version":null,"sidebarTitle":"Dailymotion Playlist Extractor","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dailymotion-playlist-extractor","href":"/api-reference/utilities/dailymotion-playlist-extractor"},{"title":"ZIP Code Validator API","deprecated":null,"version":null,"sidebarTitle":"ZIP Code Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/zip-code-validator","href":"/api-reference/utilities/zip-code-validator"},{"title":"Shell Glob Pattern Tester API","deprecated":null,"version":null,"sidebarTitle":"Shell Glob Pattern Tester","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/shell-glob-pattern-tester","href":"/api-reference/utilities/shell-glob-pattern-tester"},{"title":"SVG Path Visualizer API","deprecated":null,"version":null,"sidebarTitle":"SVG Path Visualizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/svg-path-visualizer","href":"/api-reference/utilities/svg-path-visualizer"},{"title":"SWIFT/BIC Validator API","deprecated":null,"version":null,"sidebarTitle":"SWIFT/BIC Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/swift-bic-validator","href":"/api-reference/utilities/swiftbic-validator"},{"title":"Syllable Counter \u0026 Poetry Analyzer API","deprecated":null,"version":null,"sidebarTitle":"Syllable Counter \u0026 Poetry Analyzer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/syllable-counter-poetry-analyzer","href":"/api-reference/utilities/syllable-counter-\u0026-poetry-analyzer"},{"title":"TLS/SSL Config Snippet Grader API","deprecated":null,"version":null,"sidebarTitle":"TLS/SSL Config Snippet Grader","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tls-ssl-config-snippet-grader","href":"/api-reference/utilities/tlsssl-config-snippet-grader"},{"title":"UUID Validator \u0026 Decoder API","deprecated":null,"version":null,"sidebarTitle":"UUID Validator \u0026 Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/uuid-validator-decoder","href":"/api-reference/utilities/uuid-validator-\u0026-decoder"},{"title":"VAT Number Validator API","deprecated":null,"version":null,"sidebarTitle":"VAT Number Validator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/vat-number-validator","href":"/api-reference/utilities/vat-number-validator"},{"title":"Text Replacer API","deprecated":null,"version":null,"sidebarTitle":"Text Replacer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-replacer","href":"/api-reference/utilities/text-replacer"},{"title":"Text Similarity Checker API","deprecated":null,"version":null,"sidebarTitle":"Text Similarity Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-similarity-checker","href":"/api-reference/utilities/text-similarity-checker"},{"title":"Text Summarizer API","deprecated":null,"version":null,"sidebarTitle":"Text Summarizer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/text-summarizer","href":"/api-reference/utilities/text-summarizer"},{"title":"XML Diff Comparator API","deprecated":null,"version":null,"sidebarTitle":"XML Diff Comparator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/xml-diff-comparator","href":"/api-reference/utilities/xml-diff-comparator"},{"title":"X.509 Certificate Parser API","deprecated":null,"version":null,"sidebarTitle":"X.509 Certificate Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/x509-certificate-parser","href":"/api-reference/utilities/x509-certificate-parser"},{"title":"Brotli Compression Encoder/Decoder API","deprecated":null,"version":null,"sidebarTitle":"Brotli Compression Encoder/Decoder","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/brotli-compression","href":"/api-reference/utilities/brotli-compression-encoderdecoder"},{"title":"Zstandard (Zstd) Compression Tool API","deprecated":null,"version":null,"sidebarTitle":"Zstandard (Zstd) Compression Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/zstd-compression","href":"/api-reference/utilities/zstandard-zstd-compression-tool"},{"title":"AI Content Detector API","deprecated":null,"version":null,"sidebarTitle":"AI Content Detector","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ai-content-detector","href":"/api-reference/utilities/ai-content-detector"},{"title":"HTTP Request Parser API","deprecated":null,"version":null,"sidebarTitle":"HTTP Request Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/raw-http-request-parser","href":"/api-reference/utilities/http-request-parser"},{"title":"JSON Merge Patch Tool API","deprecated":null,"version":null,"sidebarTitle":"JSON Merge Patch Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-merge-patch-tool","href":"/api-reference/utilities/json-merge-patch-tool"},{"title":"JSON Lines Merger API","deprecated":null,"version":null,"sidebarTitle":"JSON Lines Merger","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-lines-merger","href":"/api-reference/utilities/json-lines-merger"},{"title":"INI Overlay Merger API","deprecated":null,"version":null,"sidebarTitle":"INI Overlay Merger","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/ini-overlay-merger","href":"/api-reference/utilities/ini-overlay-merger"},{"title":"DNS Zone File Parser API","deprecated":null,"version":null,"sidebarTitle":"DNS Zone File Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/dns-zone-file-parser","href":"/api-reference/utilities/dns-zone-file-parser"},{"title":"HTTP Response Parser API","deprecated":null,"version":null,"sidebarTitle":"HTTP Response Parser","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/raw-http-response-parser","href":"/api-reference/utilities/http-response-parser"},{"title":"TLS/SSL Certificate Checker API","deprecated":null,"version":null,"sidebarTitle":"TLS/SSL Certificate Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/tls-ssl-certificate-checker","href":"/api-reference/utilities/tlsssl-certificate-checker"},{"title":"JSON Patch Generator API","deprecated":null,"version":null,"sidebarTitle":"JSON Patch Generator","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/json-patch-generator","href":"/api-reference/utilities/json-patch-generator"},{"title":"Locale Cloaking Checker API","deprecated":null,"version":null,"sidebarTitle":"Locale Cloaking Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/locale-cloaking-checker","href":"/api-reference/utilities/locale-cloaking-checker"},{"title":"Page Source Viewer API","deprecated":null,"version":null,"sidebarTitle":"Page Source Viewer","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/page-source-viewer","href":"/api-reference/utilities/page-source-viewer"},{"title":"Check Server Status API","deprecated":null,"version":null,"sidebarTitle":"Check Server Status","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/check-server-status","href":"/api-reference/utilities/check-server-status"},{"title":"Page Comparison API","deprecated":null,"version":null,"sidebarTitle":"Page Comparison","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/page-comparison","href":"/api-reference/utilities/page-comparison"},{"title":"Website SEO Score Checker API","deprecated":null,"version":null,"sidebarTitle":"Website SEO Score Checker","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/website-seo-score-checker","href":"/api-reference/utilities/website-seo-score-checker"},{"title":"Website Ping Tool API","deprecated":null,"version":null,"sidebarTitle":"Website Ping Tool","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/website-ping-tool","href":"/api-reference/utilities/website-ping-tool"},{"title":"WebSocket Frame Decoder (RFC 6455) API","deprecated":null,"version":null,"sidebarTitle":"WebSocket Frame Decoder (RFC 6455)","openapi":"https://api.iotools.cloud/v1/openapi post /v1/tool/websocket-frame-decoder","href":"/api-reference/utilities/websocket-frame-decoder-rfc-6455"}]}]}]}]},"basePath":"","title":"Construction Schedule Calculator API - IOTools.cloud","buildId":"dpl_DqYu5MPb49gWBBbUGgpHQUmCHY3P","deploymentId":"dpl_DqYu5MPb49gWBBbUGgpHQUmCHY3P","dynamics":["c2aa737661","2b790eda92","b0f84f53ff","a9bb46feb3"],"chunks":["OpenApiReferenceProvider-CybtLBIt.js","utils-BMLj2fvV.js","cloneDeep-izs3Hzxb.js","_Uint8Array-BVIqJ90l.js","isObjectLike-C8vmzPEN.js","isArray-Dcu1dQ5t.js","utils-B6In562Y.js","toString-BX-iyh8G.js","isSymbol-CSH9U2Gm.js","addUniqueKeysToSchema-Dr8Mfhp9.js","snippetPresets-2rmQvMVl.js","style-to-object-BY3JEAdk.js","v4-DIgz8zy6.js","conditional-requirements-CFM0id0Q.js","ApiExamples-WMqJYdZj.js","isEqual-BfaiBbcl.js","usePlaygroundInputsStore-CJ-MlPHu.js","shallow-dY3TMRCk.js","getApiPlaygroundDisplay-v-1B2bKm.js","CodeSnippet-BDhiTB7U.js","CodeSnippets-D9hnzQcS.js","Page-C4GwDT3_.js","getPastedJson-Th2V45jI.js","icon-BQXch1W9.js","MethodPill-BCqUneP3.js","DuplicateIcon-Q_-bhurZ.js","createIcon-DUjLHRqp.js","DynamicMarkdown-B-f2cqXQ.js","SectionHeading-Da5NsV4v.js","axios-vUo_bRtp.js","Markdown-D13FWkIM.js","clsx-D3Isdib3.js","lib-DuNMoZ05.js","lib-B8HbPgcC.js","html-void-elements-mCSPHezU.js","dist-C-XZBk9h.js","katex-YMM-FMeD.js","marked.esm-CZWythHk.js","AssistantPageLink--qIqmmVG.js"]}